i" Docket Nos. 50-282/306 Mr. David Musolf, Manager i
Nuclear Support Services Northern States Power Company l
414 Nicollet Mall
$ '" N Minneapolis, Minnesota 55401
Dear Mr. Musolf:
This is to acknowledge receipt of the Northern States Power Company letter i
dated November 24, 1986, which transmitted a proposed amendment to the Prairie Island Nuclear Generating Plant Physical Security Plan in response to the Miscellaneous Amendments and Search Requirements.
The submitted document has been reviewed and we have determined that additional information and revisions to the plan are required pricr to our approval.
The enclosed comments are based upon pertinent NRC regulations and published guidance describing methods, acceptable to the NRC staff, for implementing l
specific parts of those regulations.
It is requested that you provide your response to these comments within 30 days l
from receipt of this letter.
~
The reporting and/or record keeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.90-511.
Should you have any questions concerning the enclosed comments, please contact the reviewer, Barry Manili, at (301) 492-7077.
Sincerely,
/s Dominic C. Dilanni, Project Manager Project Directorate III-3 Division of Reactor Projects III, IV, V and Special Projects I
Office of Nuclear Reactor Regulation
Enclosure:
DISTRIBUTION W/ ENCLOSURES:
Physical Security Plan Comments RSGB rf Sec rf BManili CBuracker (2) cc w/ enclosure:
Region III PKreutzer See next page Dilanni
. Docket File 50-282/306 1
Case File NRC PDR RErickson w/o enc 1 Local PDR LBush w/o encl C See previous concurrence
)
0FC :RSGB ^
- RSGB *
- RSGB ^
- RSGB ^
- PD III-3
- PD III-3 J
..___...___.._...:..........__...__.___.___..___....___........._..g.
...__.__.................______._......__.._.......__ __... h..___zer NAME :BManili/bc :CBuracker
- LBush
- RErickson
- P
- 0Sce.a l
__.... g._ p........___
DATE :7/22/87
- 7/22/87
- 7/22/87
- 7/22/87
- 8/~[/87
- N 7/87 OFFICIAL RECORD COPY
$00ck $ & "
ed
w
.h.;
n 1
Mr. D. M. Musolf Prairie Island Nuclear Generating Northern States Power Company Plant i
CC*
Gerald Charnoff, Esq.
Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.
Washington, DC 20037 Dr. J. W. Ferman Minnesota Pollution Control Agency 520 Lafayette Road St. Paul, MN 55155 Mr. E. L. Watzl, Plant Manager Prairie Island Nuclear Generating Plant Northern States Power Company Route 2 Welch Minnesota 55089 Jocelyn F. Olson, Esq.
Special Assistant Attorney General Minnesota Pollution Control Agency 1935 W. County Road, 82 Roseville, Minnesota 55113 U.S. Nuclear Regulatory Commission Resident Inspector's Office 1719 Wakonade Drive East Welch, Minnesota 55089 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. William Miller, Auditor Goodhue County Courthouse Red Wing, Minnesota 55066 i
0 Docket Nos. 50-282/306 COMMENTS ON PHYSICAL SECURITY PLAN CHANGES
.(MISCELLANEOUS AMENDMENTS AND SEARCH REQUIREMENTS)
PRAIRIE ISLAND NUCLEAR GENERATING PLANT 1
Provide a commitment that'if security force members leave the protected area to perform official duties subsequent to their initial entry and search, they will be searched prior to re-entry into the protected area
'if they have not been under direct observation or accompanied by another member of the security. force.
Reference 10 CFR 73.55(d)(1) and Generic Letter 87-08 (Q&A #11).
Provide a commitment that in the case'of an individual's involuntary termination for cause, the individual's unescorted facility access will be revoked, and identification badge and other entry devices shall be retrieved prior to or simultaneously upon notification of termination.
Reference 10 CFR 73.55(d)(7)(1)(C).
\\
Provide a com:nitment to ensure prompt access to vital equipment to accom-
~j modate the potential need for rapid ingress or egress of individuals during emergency conditions or situations.
Indicate how this prompt access will be ensured (e.g., by issuing override keys to appropriate operators and security force members at the start of each shift, or by other acceptable
.j means.) Reference 10 CFR 73.55(d)(7)(ii) and Generic Letter 87-08.(Q&A #6).
Provide a commitment to periodically (annually) review physical security and contingency plans and procedures to evaluate their potential impact on plant and personnel safety.
Reference 10 CFR 73.55(d)(7)(ii)(B) and Regulatory Guide 5.65.
Indicate what components of the secondary power supply system will be pro-tected as vital.
Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08 (Q&A #18).
Provide a commitment to maintain a log indicating name, badge number, time of entry, and time of exit of all individuals granted access to a vital' area except those individuals entering or exiting the reactor control room.
Delete the CAS from the list of areas not requiring log entries.
Reference 10 CFR 73.70(d).