Proposed Tech Specs Reflecting Revised Total Predicted Structural Settlement for G Tunnel Settlement Marker 34 & E Tunnel Settlement Marker 28
ML20237J343
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/05/1987
From:
GULF STATES UTILITIES CO.
To:
Shared Package
ML20237J333 List:
References
NUDOCS 8708180106
Download: ML20237J343 (2)


Text

cm 9l*

v TABLE 3.7.10-1 TOTAL PREDICTED SETTLEMENTS OF MAJOR STRUCTURES' i

SETTLEMENT PREDICTED i STRUCTURE MARKER NO. SETTLEMENT (IN.)

Reactor Building 15 4.0 16 4.0 17 4.0 Auxiliary Building 18 3.8 19 3.6 20 3. 9 21 3.7 Fuel Building 11 3.7 12 4.0 13 3.5 14 3.8 Control Building 5 3. 7 6 3.3 7 3.7 8 3.7 Diesel Generator Building 1 3.4 i

2 3.7 3 3.6 4 3.8 Standby Cooling Tow *er, Basin 30 2.7 and Pump House 31 3.2 32 2.4 BF Tunnel 9 2.1 10 2.5 Main Steam Tunnel 22 3.8 23 3. 8 E Tunnel 28 -Gre- 3. 3 l ,

29 2.8 J G Tunnel 33 2.6 34 6 1.3 l 8708100206 DR 870005 p ADOCK 05000458 PDR RIVER BEND - UNIT 1 3/4 7-36 j 4

~~

TABLE 3.7.10-1

)

TOTAL PREDICTED SETTLEMENTS OF MAJOR STRUCTURES SETTLEMENT PREDICTED STRUCTURE MARKER NO. SETTLEMENT (IN.)

Reactor Building 15 4.0 16 4.0 m 17 4.0 Auxiliary Building 18 3.8 19 3.6 20 3. 9 21 3.7 Fuel Building 11 3.7 12 4.0 13 3.5 14 3.8 Control Building 5 .3.7 6 3.3 7 3.7 8 3.7 Diesel Generator Building 1 3.4 i

2 3.7 3 3.6 4 3.8 Standby Cooling Tow'er, Basin 30 ,t. 7 and Pump House 31 2.2 32 2.4 BF Tunnel 9 2.1 10 2.5 Main Steam Tunnel 22 3.8 23 3. 8 E Tunnel 28 -&4- 3 . 3 l 29 2. 8 G Tunnel 33 2.6 34 .e,.4 1.3 RIVER BEND - UNIT 1 3/4 7-36

_ _ _ _ _ __ _ _ _ . _ . - _ - _ - - - - - - - - - - - - - - -