NARRATIVE
SUMMARY
OF MONTHLY OPERATING EXPERIENCE JULY, 1987-July 1 The Station was in Operational Mode -1 with reactor power through at a nominal 100 percent and the Reactor Coolant System July 2 at a normal operating pressure and temperature.
July 3 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> on 'the 3rd, at the request of' Compa ny through-System Operations, a 50% load reduction was commenced to -
July 6
' su ppo rt load demand for the weekend.
Began power ascension toward 100% at 0317 hours0.00367 days <br />0.0881 hours <br />5.241402e-4 weeks <br />1.206185e-4 months <br /> on the 6th.
July 7' The Station was in Operational Mode I with reactor power through at a nominal 100 percent and the Reactor Coolant System July 3*
at a normal operating pressure and temperature.
l 8708250174 870731 PDR ADDCK 05000334 j[ C 7 4.f. -
R PDR
'lt
OPERATING DATA REPORT DOCKET NO.-
50-334 REPORT DATE:
08/07/87 COMPLETED BY: P.A. SMITH TELEPHONE:
(412) 643-1825 QflEATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: JULY 1987
- 3. LICENSED THERMAL POWER (MWe):
2660
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe).:
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744.0 5087.0 98615.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
744.0 4148.7 55993.5
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
744.0 4132.3 54463.6
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MVH):
1886816.0 10621786.0 129146192.5
- 17. GROSS ELECT. ENERGY GEN. (MWH):
606690.0 3466730.0 41339960.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
569670.0 3254820.0 38559623.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 81.2 57.6
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 81.2 57.6
- 22. UNIT CAPACITY FACTOR (DER): PCT 91.7 76.6 50.1
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 5.9 20.7
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
SIXTH REFUELING. NOVEMBER 15. 1987. 65 DAYS
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A l
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A
_. N/A COMMERCIAL OPERATION N/A N/A d
. b. ' i -
r Il__
t -
l 7 m4
- a h
l
,f 3
t e
f nr6 4 Us S6 o a e'e t
1 gw s
.)
3 S uA2 e
t eoh s
P g 1
v e
sb pt a
m.
0V u 4
i c
e a
5E AP(
t n
u,nn isf l
qs ao c
e s
eng e
u8 e
r O.EEYE r o r roes en s
r t u iB r N MTBN et u
I e s o
c A At O h a o
s C
e T M Dt I
h Ga t r.
ES nR e
EK T T P o
en E
t po7 n e e
t E. L
& i I
C N aOi1 t s s t
t t D
M eA e
,mc0 luP O U P E c n t3 T
- s. a l
O s
v s eu 1
C u
e rt d t a
r us ea C
P oyr 4
hS n
d o
0 ya i
0 no s
2 al n
2 p e
m%
c t o0 s
AC5 a
SNO Z
I Z
T Z
E
$S ZZ M
EIg Z
tER y
R l
E u
4 elu W
J
$ eg Z
l O
Z a
P e
l u
D M
enn h aa N
I e e t
A N
Mt e -
O e
SN M
e t 3
s n t A
W T
n e r
/
O R
e v o N
D O
cE p T
P i
e U
E L
R H
R S
I m o %E" o
IN e6 3 U E.n U
i t
5 n
isg ia lp
=
c e*n s l
a lt H
e eu l
ia F
m EE5 tnn c
y**$
0 eem
- ee e s wui.a e
",R.
aFM g
s s
e S
RAB0 2
e 3
t 0
a 7
D 0
7 l.
8 8e Jis ed i e nh t
IS o
N 3
F' S 1
1 1
o AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
E-33' UNIT 3~7 S "':'i: 'I 1 DATE August 7, 1987 COMPLETED BY
.P.
A. Smith TELEPHONE (a12) 643-1825 l MONTH July DAY AVERAGE DAILY POWER LEVEL DAY AY10tAGE DAILY POWER LEVEL t MWe-Net)
(yw N, i g
792 37 785-2 796 gg 800 3
783
- 9 800 4
396 779 20 386 788 33 6
704 22 783 7
796 23 792 3
779 34 793 9
796 gg 792 10 796 792 3
11 788 792 g
j 800 800 3
13 796 808 39 14 800 30 792 13 829 3;
800 16 804 INSTRUCTIONS On this format.!ist the netage d::ily unit power lese! :n MWe. Net far each day in the reporting month. Cuinpute to the nearest whole mepwait.
(4/77) i
A mb /
"'A @
Telephone (412) 393 6000
.O. Box 4 Shippingport, PA 15077-0004 August 7, 1987 l
Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Monthly Operating Report U. S. Nuclear Regulatory Commission Director, Office of Management Information & Program Control Washington, D. C. 20555 Gentlemen :
In ac corda nce with Appendix A,
Technical Speci fications, the Monthly Operating Report is submitted for the month of July,1987.
Very truly yours, g-
. D. Sieber Vice President Nuclear Operations Imd Enclosures cc: HRC Regional Office King of Prussia, PA i