Informs of Insp Scheduled for Wk of 871005.Insp Will Encompass Implementation of USI A-7, Mark I Containment Long-Term Program & Verify plant-specific Mark I Mods. Listed Info Requested
ML20237H740
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 08/19/1987
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
References
REF-GTECI-A-07, REF-GTECI-CO, TASK-A-07, TASK-A-7, TASK-OR NUDOCS 8708250130
Download: ML20237H740 (2)


Text

-_

b AUG 191987 Docket No. 50-271 i

Vermont Yankee Nuclear Power Corporation ATTN: Mr. Warren P. Murphy Vice President and Manager of Operations RD 5, Box 169 Ferry Road Brattleboro, Vermont 05301 Gentlemen:

Subject:

Announcement of Regional Inspection Related to Mark I Containment Modifications - Request for Information This office has scheduled an inspection for the week of October 5, 1987 at the Vermont Yankee plant site and the Yankee Atomic Engineering Of fice. The inspection will encompass your implemeritation of Unresolved Safety Issue A-7, Mark I Containment Long-Term Program. The inspection will be coordinated by a regional inspector assisted by two NRC contractor engineer specialists. The purpose of the inspection is to verify that plant specific Mark I modifications at Vermont Yankee meet the requirements identified in NUREG-0661, Containment

~

Long Term Program.

Mr. A. A. Varela of this office discussed this inspection with D. A. Reid of your staff in a telephone conversation on August 6, 1987.

Based on our request, Mr. Reid agreed to provide this office and to EG&G the following documents:

Vermont Yankee's Plant Unique Analysis Report (PUAR)

List of correspondence between VPNPC and the NRC on each phase of the modifications and your responses to NRC requests for additional information Sections of the Technical Specifications pertaining to the suppression pool monitoring systems and (if applicable) to the differential control systems This information will assist in our preparation of a definitive plan for sampling the engineering designs and implementation of selected modifications in your long term program.

The inspection team will fir,t review engineering analyses, calculations for design of the modification drawings and modification work packages.

These will be reviewed and discussed with responsible engineers at the Yankee Atomic Electric Company office in Framingham. Mr. Reid informed Mr. Varcla that YAEC's project manager Mr. S. Miller is the contact person for the VY torus modifications 870G250130 870819 PDR ADOCK 0500 1

0 0FFICIAL RECORD COPY VARELA8/5/87 - 0001.0.0 08/14/87

f. o

/

s Vermont Yankee Nuclear Power Corp.

2 b

engineering work. The second part of the inspection will include a plant visit and walkdown inspection of selected samples of modifications identified during the engineering review.

Photographs of typical in-torus modifications should be available for the inspection.

Sincerely, Drisinal Signed Ey a 22 Yh William. Johnston Acting Director Division of Reactor Safety cc w/ encl:

R. W. Capstick, Licensing Engineer J. Gary Weigand, President and Chief Executive Officer J. P. Pelletier, Plant Manager Donald Hunter, Vice President Cort Richardson, Vermont Public Interest Research Group, Inc.

Gerald Tarrant, Commissioner, Department of Public Service Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of New Hampshire State of Vermont bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP H. Eichenholz, SRI, Yankee V. Rooney, LPM, NRR Robert J. Bores, DRSS