l BYRON NUCLEAR POWER STATION UNIT 1 AND UNIT 2 -l MONTHLY PERFORMANCE REPORT COMMONWEALTH EDISON COMPANY NRC DOCKET NO. 0G0-454 NRC DOCKET NO. 050-455 LICENSE NO. NPF-37 LICENSE NO. NPF-66 I
8708250099 G70731 PDR ADOCK 05000454 R PDR (0625M/00f,2M) ( 2_ ) -(21h
\\\
l' t
t i
Monthly Rzport for Byron Unit 1 !
I.
A. Summary of Operating Experience for Unit 1 The Unit began this reporting period in Mode 1 at 98*4 power. It ]
remained in Mode 1 until a reactor trip occurred at 0531 on July 29. !
The same day, the reactor was taken critical at 1641 and was synchronized to the grid at 2201. 3.t 0153 on July 31, a reactor trip occurred. The unit remained in Mode 3 for the rest of the reporting period.
(0625M/0062M) (3)
Hv .
B. OPERATING DATA REPORT-1 DOCKET NO.: 050-454 UNIT: Byron One DATE: 08/10/87 COMPILED BY: D. J. Spitzer TELEPHONE: (815)234-5441 x2023 OPERATING STATUS
- 1. Reporting Period: July 1987. Gross Hours: 744 2.: Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 -(MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity (MWe-net): NOT DETERMINED
'3. Power Level to Which Restricted (If Any):
'4. Reasons for Restriction (If Any):
THIS MONTH VR TO DATE CUMULATIVE *
- 5. Report Period Hrs. 744 5087 17160
- 6. Rx' Critical Hours 703.3 2576.l' 14162.3
- 7. Rx Reserve Shutdown Hours 0 0 0
- 8. Hours Generator on Line- 698 2423.4 11377.1
- 9. Unit ~ Reserve Shutdown Hours 0 0 0
- 10. Gross Thermal Energy (MWH) 2286523 6201202 53325736
- 11. Gross Elec. Energy (MWH) 781095 2069535 10993767
- 12. Net Elec. Energy (MWH) 738661 1889647 10298548
- 13. Reactor Service Factor 94.5 50.6 82.5
- 14. Reactor Availability Factor 94.5 50.6 82.5
- 15. Unit Service Factor 93.8 47.6 66.3
- 16. Unit Availability Factor 93.8 47.6 66.3
'17. Unit Capacity Factor (MDC net) N/A N/A N/A
- 18. Unit Capacity Factor (DER net) 88.6 33.2 53.6 l
- 19. Unit Forced Outage Hrs. 46 46 823
- 20. Unit Forced Outage Rate 6.1 1.9 6.7 1 21, Shutdowns Scheduled Over Next 6 Months:
- 22. If. Shutdown at End of Report Period, Estimated Date of Startup: l
- 23. Units in Test States (Prior to Commercial Operation): See Unit 2 (II.B.23) ,
- Note - The cumulative numbers do not reflect power generated prior to commercial .
service.
(0625M/0062M) (4) ;
C. AVERAGE DAILY UNIT POWER LEVEL COCKET NO.: 050-454 UNIT: Byron One DATE: 08/10/87 COMPILED BY: D. J. Spitzer TELEPHONE: (815)234-5441 x2023 MONTH: July, 1987 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
- 29. 992 MW
- 30. -17 MW
- 31. -13 MW INSTRUCTIONS On this form list the average daily unit power leve? in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting mo.sch. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions wnen the daily average power level exceeds the 100% line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
(0625M/0062M) (5)
t r r n e e e d d e
v n n U U r '
P , ,
g g o n n t i i n n n t t o h h m** i g g o
- t i i t o
- c l l r e
e A
o
~
o t o
p e
- e t n e e
- v t. e r tRE e
- i d d n o e e
- t c
e e o p ff etU e
- t t H ohnN e
- e r
un un m s .S e eN* r b o b o o &nn v cO* ii ii C o o yE e oR* o rt rt Pii r cY* C t a t a & ttt ei eB* t g t g t caneF o * & ai ai m i urEs o
- t t e bra n e
- e es es t i t paeR e
- s se se s hset cE e
- u a
uv uv y xnraiL e
- an an S EIPDL(
e
- C Ci Ci e * .
n
- e** t b
n C a e 4 C n J2 o
p 4 r 0 , e m DB w m d S o RA o a a N C 1 C P rm o O cadL I S re T cud C m l l S ne U e aa icr D ; t d uuot ue E) s y
o nnt ndh R1 D D h aauoet
/ S R R t MMACRO ST e - - - - -
NI r M 1 23459 WN e OU D( b T m U u 1 N S'
R r T E o I L r N r U E d
o n rn h 3 i reo 3 mehi t d ptt e AOOc M - - - iga n FGHrnntii o snm s H H et eia a rs Rax e ue rE R l T yT i gr s arnors r 9 1 F oit on u .
l at e o 3 2 pt el ac 7 H 2 2 n inuuri 8 o uif gel 9 s qaeep 1 e a EMRRO&
p e - - - - -
y F F R y
T ABCDE l
u J 7 * *
- 7 d e 8 8 *
- o t / / *
- i a 9 1
- y*
r D 2 3
- e / /
- r*
P 7 7
- a*
0 0
- m* d t
- m*
- u*
ed r ce o o.
- S* rh p 3 4 *
- E oc e N *
- P FS R *
- Y - -
- *
- T FS
E. UNIQUE REPORTING REQUIREMENTS (UNIT 1)
- 1. Safety / Relief valve operations for Unit One.
VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT None
- 2. Licensee generated changes to ODCM. (Y/N)
No
- 3. Indications of failed fuel. (Y/N)
No.
(0625M/0062M) (7)
L. .
F. LICD!SEE EVENT REPORTS (UNIT 1)
The following is a tabular summary of all Licensee Event Reports for Byron Nuclear power Station, Unit One, submitted during the reporting period, July 1 through July 31, 1987. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CPR 50.73.
Occurrence Licensee Event Report Number Date Titic of Occurrence None (0625M/0062M) (8)
'.II. Monthly Raport for Byron Unit 2 A. Summary of Operating Experience for Unit 2 The. unit began this reporting period in Mode 1, ramping down to repair an EH system leak. At 0628 on July 1, the reactor was manually tripped. At 0800, July 1,' the EH System problem was corrected.. At 1403, July 1, the reactor was taken critical. The main. turbine was latched on July 1 at 2014. On July 2 at 0040, a turbine trip occurred because of a turbine throttle valve problem.
Mode 2 was entered at 0800, Mode 3 was entered at 2147 on July 2.
On July 3, Mode 4 was entered at 0510, Mode 3 was reentered at 1963.
On July 4, proper turbine throttle valve operation was verified. The reactor was taken critical at 1301 on July 4. On July 5, at 0115 the main generator was synchronized to the grid. By July 6, at 2303 the reactor was at 98% power. On July 8, at 1600, the 100 hr reliability run was started. On July 11, the steam generator moisture carry-over test was successfully completed. On July 14, at 1815, a 100% plant trip was conducted, per startup test 2.52.88. On July 16 at 0812, Mode 2 was reentered. On July 17, power was at 50s and. holding for chemirtry concerns. power was increased to 1135 MWe on July 18. On July 25, at 1215 a 30% load rejection was initiated per a startup
~ test. At 1216 on July 25 a reactor trip occurred. The reactor was taken critical at 2143 the same day. The. unit was synchronized to the grid at 0118 on July 26.. The unit remained in Mode 1 for the rest of the reporting period. ,
(0625M/0062M) (9)
_ . _ _ . . - _ - - - _ - - - - _ - - - . - - _ _ - _ - - _ _~ _. _ _ _ - _-. __ - . . - . ---____ _ . _ - - - _ _ - - - . . _ _ _ - - _ _ - - - - _ - _ - _ _ - . - _ - _ - _
B. OPERATING DATA REFORT DOCKET NO.: 050-455 I UNZT: Byron Two DATE: 08/10/87 COMPILED EY: D. J. Spitzer TELEPHONE: (815)234-5441 x2023 OPERATING STATUS
- 1. Reporting Period: July 1987. Gross Hours: 744
- 2. Currently Authorized Power Level (MWt): 3411 Design Electrical. Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity (MWe-net): NOT DETERMINED
- 3. Power Level to Which Restricted (If Any):
- 4. Reasons for Restriction (If Any): The Unit is in Startup and Power Ascension Test Phase.
THIG MONTH Yi? TO DATE CUMULATIVE *
- 5. Report Period Hrs. 744 4888.4 4888.4
- 6. Rx Critical Hours 689,2 4013.9 4013.9
- 7. Rx Reserve Shutdown Hours 0 0 37.8
- 8. Hours Generator on Line 597.4 3205.6 3205.6
- 9. Unit Reserve Shutdown Hours 0 0 0
- 10. Gross Thermal Energy (MWH) 1607744 7467849 7467849
- 11. Gross'Elec. Energy (MWH) 539110 2444351 2444351
- 12. Net Elec. Energy (MWH) 503846 2263646 2263646
- 13. Reactor Service Factor N/A N/A N/A
- 14. Reactor Availability Factor N/A N/A N/A
- 15. Unit Service Factor N/A N/A N/A
- 16. Unit Availability Factor N/A N/A N/A
- 17. Unit Capacity Factor {MDC net) N/A N/A N/A
- 18. Unit Capacity Factor (DER net) N/A N/A N/A
- 19. Unit Forced Outage Hrs. N/A N/A N/A
- 20. Unit Forced Outage Rate N/A N/A 1;/A
- 21. Shutdowns Scheduled Over Next 6 Months: 11/28/87
- 22. If Shutdown at End of Report Period, Estimated Date of Startup:
23.' Units in Test Status (Prior to Commercial Operation): (UNIT 2)
Forecast Achieved Initial Criticality 01/07/87 01/09/87 Initial Electricity 02/05/87 02/06/87 Commercial Operaticn 05/31/87
- Note - The cumulative numbers reflect power generated prior to commercial service.
(0625M/0062M) (10)
C. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 050-455 UNIT: Byron Two DATE: 08/10/87 COMPILED BY: D. J. Spitzer TELEPHONE: (815)234-5441 x2023 MONTH: July, 1987 k
DAY AVERAGE DAILY POWER LEVEL -
(NMe-Net)
- 9. 1086 MW 23. . _ _ .
1043 MN
- 11. 1094 MW 25. 519 MN
- 12. 1096 MW _
- 26. , ._318 MW
- 29. 606 MW 3 0. __ 835 MW 31, 712 MW INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
I (0625M/0062M) (11) l
u ,.
c e t R s e
t t n
e n v o e i n r t o P ci )
et o ja eg t6 1
me* t r1 e
- ri e
- n t o0 p-e
- o ds t n eG e
- i ae e r
- e
- t ov l n n o tRE e R e
- c e
- A 8 i o p
ff etU s
- 8 % H oh nN n
- e 0 r m s S e(
e
- v 2 3 e o &nno o v eN* i 5 d C yE e eO* t en &
Fiir l hU eR* c 1 ttt ei
~- eF eY*
eB*
e r
r t
s t'
g a
z e
t i
bra ca6s ur n) e * .
it paeR e
- o .
e nd t s hset cE e
- C k T ie y xnraiL e
- a p t p cp S EIPDL(
e * & e m
- L U ui e
- e - d r o
- s d t nt m1
- u i r o a** a u a cr C l t o F S et l c C r i a H e he E P Wr m a
d a
S t rm cadL o
E n S re C e -
cud I n s ll S ne T e C . v aa icr U jl d uuot ue o nnt ndh D -
E)
R2
@w na IV h t
e aauoet MMACRO
/ m ST e M 123459
~ NI t WN s OU y H V P D( S E C R T
U r H e r S b o m r T u r I N E N n rn U R i reo n E mehi o L
_ d d ptt AOO c
- - - iga i
t
_ o FGHrnntii
_ h t 1 1 3 snm e
- M n
o et rs ue l T i gr eia R ax yT rE e
- R s
a e
A F A arnors F oit on l at e pt el ac s 7 5 2 n inuuri 7 r 4 4 0 o uif gel 8 u s qaeep 9 o 0 0 3 a EMRRO&
1 H 9 4 1 e - - - - -
R ABCDE
, e )
y p 2 l y F 5 F 1_
u T * * * (
J *
- 7 7 7 )
d 8 8 8 *
- o e
- M
_ / / /
- i t 1 4 5
- y* 2
- r* 6 r a 0 1 2
- a* 0 e D / / /
m*
P 7 0
7 0
7 0
m*
u*
d ed ce 0
/
M
_ t rh 5 r
- S*
_ o . ) ) ) *
- E oc 2 6
_ p o 9 0 1 *
- P FS
- Y - - 0 e N 1 2 2
( * *
- T F5 (
R ( (
E. UNIQUE REPORTING REQUIREMENTS (UNIT 2)
- 1. Safety / Relief valve operations for Unit Two.
VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT 07/25/87 Pressurizer 2RY455A Pressurizer PORV PORV lifted because of plant trip
- 2. Licensee generated changes to ODCM. (Y/N) i No
- 3. Indications of failed fuel. (Y/N)
No l
(0625M/0062M) (13)
I
F. LICENSEE EVENT REPORTS (UNIT E The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit Two, submitted during the reporting period, July 1 through July 31, 1987. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Occurrence Licensee Event Report Number Date Title of Occurrence 87-008-00 06/06/87 Mini purge Supply and Exhaust 87-009-00 06/29/87 Manual reactor trip due to 1C Feed Water Pump overspeed 87-010-00 07/01/87 Manual reactor trip due to broken EH line l
l l
l l
(0625M/0062M) (14) I
)
,k--s j August 10, 1987 I
l l
LTR: BYRON' 87-0834 File: 2.7.200 Director, Office of Management Information and Program Control ,
l United States Nuclear Regulatory Commission Washington, D.C. 20555 ATTN: Document Control Desk Gentlemea:
Enclosed for your information is the Monthly Performance Report covering Byror, Nuclear Power Station for the period July 1 through July 31, 1987, t
Very truly yours,
. g&t' R. E. Querio ;
Station Manager' l Byron Nuclear Power Station REQ /PHD/bg !
cc: A.B. Davis, NRC, Region III NRC Resident Inspector Byron Gary Wright, Ill. Dept. of Nuclear Safety D.P. Galle T. J. Maiman L.D. Butterfield Nuclear Fuel Services, PWR Plant Support L. Anastasia, Station Nuclear Engineering !