Forwards Safety Insp Rept 50-441/87-04 on 870713-17.No Violations Noted
ML20237H538
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/11/1987
From: Forney W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20237H542 List:
References
NUDOCS 8708170259
Download: ML20237H538 (2)


See also: IR 05000441/1987004

Text

.

- _ _ _ _ _ - _

AUS 111987

. .

.

~ n, . , . a

_

Docket No. 50-441

The Cleveland Electric Illuminating

Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the routine safety inspection conducted by Mr. D. E. Keating

of this office on July 13-17, 1987, of activities at Perry Nuclear Power Plant,

Unit 2, authorized by NRC Construction Permit No. CPPR-149 and to the discussion

,

of our findings with Mr. E. Riley and others of your staff at the conclusion of

l the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC Public

Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

"Oratcxl Signed # 8. L Torneyf

William L. Forney, Chief

Division of Reactor Projects

Enclosure: Inspection Report

No. 50-441/87004(DRP)

See Attached Distribution

R IJ' [ , '

RIII RIII RIII y

M 9 .2 Wb goney

Kea ing/ab -

7'McBarger

M Knop x@

8//d/ Y7 h we7 S

8708170259 8700114

ADOCK O

]l l

gDR l

- - _ _ - _ _ _

'

.

.

The Cleveland Electric 2 4l,,4} 11 jg@7

Illuminating Company

Distribution

cc w/ enclosure:

F. R. Stead, Manager, Perry

Plant Technical Department

M. D. Lyster, Manager, Perry Plant

Operations Department

Ms. E. M. Buzzelli, General

Supervising Engineer, Licensing

and Compliance Section

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert M. Quillin, Ohio

Department of Health

State of Ohio, Public

Utilities Commission

_ _ _ _ _ _