ML20237H533

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Temporary Procedure Change Notice 3 to Rev 5 to EPIP-02, Emergency Classification & Temporary Procedure Change Notice 2 to Rev 11 to EPIP-03
ML20237H533
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/03/1987
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20237H535 List:
References
161-00422-JGH-J, 161-422-JGH-J, NUDOCS 8708250056
Download: ML20237H533 (1)


Text

[-

b j

Arizona Nuclear Power Project P.O. OoX 52034 e PHOENIX. ARIZONA 85072-2034 August 3, 1987 161-00422-JGH/JBK

(

U. S. Nuclear Regulatory Commission l

Document Control Desk j

Washington, D.C.

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS) l Units 1, 2 and 3 i

Docket Nos. STN 50-528 (License NPF-41)

STN 50-529 (License NPF-51)

STN 50-530 (License NPF-65)

Emergency Plan Implementing Procedure Update File: 87-002-493; 87-056-026

Dear Sir:

?

In accordance with 10 CFR 50, Appendix E, ANPP is submitting updated Emergency l

Plan Implementing Procedures (EPIPs) which are marked with an "X"

in the Attachment.

If you have any questions or require additional information, do not hesitate to call.

l Very truly yours, i

l 4

N J. G. Haynes Vice President Nuclear Production JGH/JBK/ dim Attachments cc:

0. M. De Michele (w/a)

E. E. Van Brunt, Jr.

(w/a)

J. B. Martin (w/a)

E. A. Licitra (w/a)

A. C. Gehr (w/a)

R. P. Zimmerman (w/a)

G. A. Brown (w/ Copy 6 and Copy 9) i Document Control Desk (w/ Copy 7 and Copy 8) 8708250056 870803 PDR ADOCK 05000528 F

PDR

+ya, s

.w gm.,am

,%p,...y,.,

,%,g.g,,,

,y,,,,

,,,,g,,

,,yg,,,

.