ML20237H371
| ML20237H371 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 07/31/1987 |
| From: | Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20237H374 | List: |
| References | |
| TAC-66051, TAC-66052, NUDOCS 8708170170 | |
| Download: ML20237H371 (3) | |
Text
.,_-
t DUKE POWER GOMPANY P.O. Box 33189 l
CHARLOTTE, N.O. 28242 l-HAL.ILTUCKER TELEPHONE l-vmac emanipent (704) 373-4531 MtJULFell Pt10DtJOTION July 31, 1987 4
d U.S. Nuclear Regulatory Commission Document Control Desk Mashington, D.C.
20555 j
a
Subject:
Catawba Nuclear Station Docket Nos. 50-413 and 50-414 Technical Specification Amendment l
Cold Leg Accumulator Boron Requirements l
Gentlemen:
l Please find attached proposed license amendments to Facility Operating License i
Nos. NPF-35 and NPF-52 for Catawba Nuclear Station Unita 1 and 2, respectively.
The proposed changes to the Technical Specifications seek to allow more time to restore the boron concentration in an accumulator that is out of specifications.
The proposed changes continue to ensure that in the event of a LOCA, a sufficient amount of borated water will be injected into the core to maintain adequate cooling. The time extension is dependent upon the weighted average of the boron concentration of the three limiting accumulators.
This proposal would establish a.
j lower limit of 1500 ppm volume weighted average for the'three limiting accumu-lators or to be in a one hour: action statement prior to initiating shutdown.
Six:
hours would.be allowed for c. weighted average of 1500-1900 ppm and twenty-four l
hours would be allowed if the weighted average is greater than 1900 ppm.
The proposal also clarifies the bases based upon these proposed changes.: The proposed change is intended to improve the reliability / availability of Catawba.
Attachment I contains the proposed revision to the Technical Specifications..
Attachment II contains the Justification and Safety Analysis in support of the proposed change. Attachment III provides a determination that the proposed change would not involve any significant hazards consideration as defined by 10CFR 50.92.
It should be noted that the same proposed changes have already been reviewed and.
approved for the McGuire Nuclear Station (see letter dated September 30,1986 from.
Mr. Darl Hood, NRC/0NRR, to Mr. H.B. Tucker, Duke Power Company, transmitting amendments Nos 64 and 45 to Facility Operating Licenses NPF-11 and NPF-17, respectively).
ppy o@9y4 i
pygut W&
P.
i
I n..
Document Control Desk July 31, 1987 Page 2 This request involves one application for amendment to Catawba's Technical Specifications.. Accordingly, pursuant to 10CFR 170, 5170.12, please find enclosed a check in the amount of $150.00 for the application fee.
Pursuant to 10CFR 50.91(b)(1), the appropriate South Carolina State Of ficial is I
being provided a copy of this amendment request.
Very truly yours,
- Mb
?
Hal B. Tucker JGT/36/j gc Attachments xc:
Dr. J. Nelson Grace Mr. Heyward Shealy, Chief Regional Administrator Bureau of Radiological Health U.S. Nuclear Regulatory S.C. Dept. of Health and Commission - Region II Environmental Control 101 Marietta St. NW 2600 Bull Street Suite 2900 - Atlanta, GA 30323 Columbia, S.C.
29201 American Nuclear Insurers INP0 Records Center c/o Dottie Sherman, ANI Library Suite 1500 The Exchange, Suite 245 1100 circle 75 Parkway 270 Farmington Avenue Atlanta, GA 30339 l
Farmington, CT 06032 Mr. P.K. Van Doorn M&M Nuclear Consultants NRC Resident Inspector 1221 Avenue of the Americas Catawba Nuclear Station New York, NY 10020 1
1
se o
Document Control Desk July 31,.1987 Page 3 I
HAL E. TUCKER, being duly sworn, states that he is Vice President of Duke Power l
Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this revision to the Catawba Nuclear Station License Nos. NPF-35 and NPF-52 and that all statements and matters set forth therein are true and correct to the best of his knowledge.
(
4 /
'M
- WeIc. -.
~Hal B. Tucker, Vice President l
l Subscribed and sworn to before me this 31st day of July,1987.
Notary Public l
My Commission Expires:
x}to Lo
} 9 {9 1
l