Documents 870804 Meeting W/Util Re Results of Salp. Viewgraphs,Summary Agenda & List of Attendees Encl
ML20237H034
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 08/11/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
References
NUDOCS 8708170024
Download: ML20237H034 (15)


Text

AUG 111987 In Reply Refer To:

Docket: 50-267 Public Service Company of Colorado ATTN.

Robert 0. Williams, Jr.

Vice President, Nuclear Operations P. O. Box 840 i

Denver, Colorado 80201-0840 f

Gentlemen:

'1 This documents the meeting between Public Service Company of Colorado and the NRC held August 4, 1987, at the Fort St.'Vrain site to discuss the results of l

the Systematic Assessment of Licensee Performance (SALP).

Attached are'a copy of the transparencies used, a summary agenda, and a list of principle attendees.

l Sincerely, I

Driginal sicned n,.

D. E. Gacilardo J. E. Gagliardo, Chief 1

Reactor Projects Branch J

Attachments: As stated cc w/ attachments:

Manager, Nuclear Production Division Fort St. Vrain Nuclecr Stat, ion 16805 WCR 101 1

Platteville, Colorado 80651 P. Tomlinson, Manager, Quality Assurance Division (same address)

Colorado Radiation Control Program Director Colorado Public Utilities Commission bcc to DMB (IE51) bcc w/ attachments distrib. by RIV:

RPB DRSP RRI R. D.' Martin, RA SectionChief(RPB/A)

RSB SectionChief(RSB/ES)

Project Inspector, RPB RPSB D. Weiss, RM/ALF MIS System R. Hall RSTS Operator K. Heitner, NRR Project Manager RIV File J. Calvo, NRR

[

C:RP(2;ardogon

  • oocx o m ag7 4

l(t s70s170024 870811 ch'RPB/A JEGelb?

1, aaueon:cs 8/pj 8/d /87.

...r g

l l-SALP' BOARD REPORT FORT' ST.

VRAIN-NUCLEAR GENERATING. STATION MAY 7,

198e THROUGH APRIL 30, 19g7 i

l i

l l

l l

l l

~

1 l

PLANT OPERATIONS

- l CONCLUSIONS o

- 1

  • IMPROVED PERFORMANCE
  • MANAGEMENT SUPPORT OF OPERATIONS EVIDENT
  • ' PERFORMANCE CATEGORY-2 AND IMPROVING RECOMMENDATIONS
  • ELIMINATE DEFICIENCY REPORT TAG ~ BACKLOG
  • ELIMINATE PROCEDURE DEVIATION REPORTS-
  • CONTINUE TO UPGRADE OPERATING PROCEDURES
  • CONTINUE TRAINING OF NEW OPERATORS-l-
  • WORK WITH ENGINEERING TO CLEAR-BACKLOG OF TEMPORARY l

CONFIGURATION REPORTS i

  • ELIMINATE UNNECESSARY ALARMS, STRIVE.FOR " BLACK BOARD" 1

l l

l d

i J -

1 l

- l I'

r l

i l

l RADIOLOGICAL CONTROLS I

CONCLUS10ES

  • RADIATION CONTROL PROGRAM AGGRESSIVE f
  • PERFORMANCE CATEGORY 1 j:

RECOMMENDATIONS

  • ESTABLISEi PERMANENT ALARA PROGRAM
  • PROVIDE TECHNICAL EXPERTISE FOR AUDITS OF CHEMISTRY AND l

RADIOCHEMISTRY l

  • RESOLVE WHY'CERTAIN ATMOSPHERIC TRITIUM SAMPLES WERE ABOVE NORMAL BACKGROUND LEVELS

w

,9

'i s

l i

)

1 j

l 1

MAINTENAh'CE CONCLUBIDMS

  • IMPROVED PERFORMANCE
  • SUBSTANTIAL PROCEDURE CHANGES l

1

  • PERFORMANCE CATEGORY 2 AND IMPROVING l

RECOMMENDATIONS

  • REDUCE MAINTENANCE BACKLOG l
  • COMPLETE MAINTENANCE PROCEDURE UPGRADE PROGRAM j

l 1

i l

I l

l l

I i

i l

1 l

1 SURVEILLANCE CONCLUSIONS SATISFACTORY PERFORMANCE

  • PERFORMANCE CATAGORY 2 RECOMMEN_DATIONS MANAGEMENT ATTENTION TO IMPROVE:

- TECHNICIAN PERFORMANCE l

- TRACKING OF SURVEILLANCE STATUS

- SURVEILLANCE PROCEDURES

  • PREPARE FOR NEW TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENTS FROM UPGRADE PROGRAM l

l 1

I

_________-__-__-_______N

l FIRE PROTECTION CONCI,USIONS l

PERFORMANCE CATEGORY 1 l

RECOMMENDATIONS l

  • CONTINUE EFFORTS TOWARD MEETING APPENDIX R SCHEDULE l

l 1

l l

i i

EMERGENCY PREPAREDNESS l

l l

1

)

QHCLUSIONS

  • WEAK PERFORMANCE THROUGH TO 1986 EXERCISE
  • IMPROVED PERFORMANCE BECAUSE OF INCREASED

]

MANAGEMENT INVOLVEMENT

  • PERFORMANCE CATEGORY 3 I

RE@ EMENDATIONS j

1 1

l i

l l

SECURITY l

CONCLUSIONS l

  • PERIMETER SECURITY SYSTEM IN FULL COMPLIANCE
  • PERFORMANCE CATEGORY 2 RECOMMENDATIONS l
  • DEVELOP SECURITY STAFF BASED ON CURRENT INITIATIVES l
  • SOLVE MORALE PROBLEM OF SECURITY FORCE

l l

l l

l OUTAGES l

CONCLUSIONS l

l

  • SUCCESSFULLY COMPLETED 11 MONTH OUTAGE
  • METHOD OF CONTROLLING OUTAGE ACTIVITIES CHANGED AND IMPROVED
  • PERFORMANCE CATEGORY 2 l

EFAQMMENDATIONS

  • EXAMINE AND ASSESS VARIOUS TECHNIQUES USE FOR OUTAGE CONTROL
  • FORMALIZE THOSE CONTROLS TO BE USED IN THE FUTURE 1

1 I

l

l l

l l

QUALITY PROGRAMS l

CONCLUSIONS

  • CONTINUED AND RAPID IMPROVEMENT SHOWN DURING LAST HALF OF PERIOD
  • PROBLEMS IN DESIGN CONTROL DECREASE RATING OF THE CATEGORY TO PERFORMANCE CATEGORY 2 RECOMMENDATIONS I
  • CONTINUE MANAGEMENT ATTENTION IN THIS AREA

\\

  • REDUCE BACKLOG OF CORRECTIVE ACTIONS YET TO BE ACCOMPLISHED 1

IMPROVE DESIGN CONTROL PROCESS i

l l

l t

i l

i l

I l

i l

i i

TRAINING AND QUALIFICATION l

EFFECTIVENESS CONCLUSSTONS i

  • PERFORMANCE CATEGORY 2 i

i

)

{

RECOMMENDATIONS i

  • IMPLEMENT CRAFT AND SYSTEMS TRAINING FOR ENGINEERING AND MAINTENANCE PERSONNEL l

1 i

i

l o

i i

i LICENSING i

CQHGLUSIONS CONTINUED IMPROVEMENT

  • HIGH LEVEL OF ATTENTION BY PSC AND STAFF REQUIRED
  • PERFORMANCE CATEGORY 2 i

RECOMMENDATIONS l

MAINTAIN ADEQUATE STAFF RESOURCES

  • IMPROVE INTEGRATION BETWEEN LICENSING, NUCLEAR j

ENGINEERING, AND PLANT OPERATIONS

  • IMPROVE ORGANIZATIONAL PROBLEM SOLVING ABILITIES I

I

1

SUMMARY

AGENDA 0F THE MEETING BETWEEN THE f

PUBLIC SERVICE COMPANY OF COLORADO AND THE.

i US NUCLEAR REGULATORY COMMISSION j

1 Date:

August _4, 1987

)

e I

Time 1:00 p.m. (MDT)

-]

Location:

Visitors Center, Fort St. Vrain, Platteville, Colorado l

Agenda:

Opening Remarks......... R. Martin, NRC l

Response By........... R. Walker, PSC Discussion of SALP Areas By... J. Gagliardo, NRC Closing Remarks By........ R. Williams, PSC l

i

l l

-4

)

LIST OF PRINCIPLE ATTENDEES SALP MEETING - AUGUST 4, 1987 i

PSC:

l R. Walker, Chairman of the Board R. Williams, Vice President, Nuclear L. Brey, Manager, Nuclear Licensing & Fuels D. Warembourg, Manager, Nuclear Engineering P. Tomlinson, Manager, Quality Assurance l

NRC:

.i R. Martin, Regional Administrator R. Bangart, Director, Division of Radiation Safety and Safeguards J. Gagliardo, Chief, Reactor Projects Branch J. Jaudon, Chief, Project Section A