AUG 111987 In Reply Refer To:
Docket: 50-267 Public Service Company of Colorado ATTN.
Robert 0. Williams, Jr.
Vice President, Nuclear Operations P. O. Box 840 i
Denver, Colorado 80201-0840 f
Gentlemen:
'1 This documents the meeting between Public Service Company of Colorado and the NRC held August 4, 1987, at the Fort St.'Vrain site to discuss the results of l
the Systematic Assessment of Licensee Performance (SALP).
Attached are'a copy of the transparencies used, a summary agenda, and a list of principle attendees.
l Sincerely, I
Driginal sicned n,.
D. E. Gacilardo J. E. Gagliardo, Chief 1
Reactor Projects Branch J
Attachments: As stated cc w/ attachments:
Manager, Nuclear Production Division Fort St. Vrain Nuclecr Stat, ion 16805 WCR 101 1
Platteville, Colorado 80651 P. Tomlinson, Manager, Quality Assurance Division (same address)
Colorado Radiation Control Program Director Colorado Public Utilities Commission bcc to DMB (IE51) bcc w/ attachments distrib. by RIV:
RPB DRSP RRI R. D.' Martin, RA SectionChief(RPB/A)
RSB SectionChief(RSB/ES)
Project Inspector, RPB RPSB D. Weiss, RM/ALF MIS System R. Hall RSTS Operator K. Heitner, NRR Project Manager RIV File J. Calvo, NRR
[
C:RP(2;ardogon
- oocx o m ag7 4
l(t s70s170024 870811 ch'RPB/A JEGelb?
1, aaueon:cs 8/pj 8/d /87.
...r g
l l-SALP' BOARD REPORT FORT' ST.
VRAIN-NUCLEAR GENERATING. STATION MAY 7,
198e THROUGH APRIL 30, 19g7 i
l i
l l
l l
l l
~
1 l
PLANT OPERATIONS
- l CONCLUSIONS o
- 1
- IMPROVED PERFORMANCE
- MANAGEMENT SUPPORT OF OPERATIONS EVIDENT
- ' PERFORMANCE CATEGORY-2 AND IMPROVING RECOMMENDATIONS
- ELIMINATE DEFICIENCY REPORT TAG ~ BACKLOG
- ELIMINATE PROCEDURE DEVIATION REPORTS-
- CONTINUE TO UPGRADE OPERATING PROCEDURES
- CONTINUE TRAINING OF NEW OPERATORS-l-
- WORK WITH ENGINEERING TO CLEAR-BACKLOG OF TEMPORARY l
CONFIGURATION REPORTS i
- ELIMINATE UNNECESSARY ALARMS, STRIVE.FOR " BLACK BOARD" 1
l l
l d
i J -
1 l
- l I'
r l
i l
l RADIOLOGICAL CONTROLS I
CONCLUS10ES
- RADIATION CONTROL PROGRAM AGGRESSIVE f
- PERFORMANCE CATEGORY 1 j:
RECOMMENDATIONS
- ESTABLISEi PERMANENT ALARA PROGRAM
- PROVIDE TECHNICAL EXPERTISE FOR AUDITS OF CHEMISTRY AND l
RADIOCHEMISTRY l
- RESOLVE WHY'CERTAIN ATMOSPHERIC TRITIUM SAMPLES WERE ABOVE NORMAL BACKGROUND LEVELS
w
,9
'i s
l i
)
1 j
l 1
MAINTENAh'CE CONCLUBIDMS
- IMPROVED PERFORMANCE
- SUBSTANTIAL PROCEDURE CHANGES l
1
- PERFORMANCE CATEGORY 2 AND IMPROVING l
RECOMMENDATIONS
- REDUCE MAINTENANCE BACKLOG l
- COMPLETE MAINTENANCE PROCEDURE UPGRADE PROGRAM j
l 1
i l
I l
l l
I i
i l
1 l
1 SURVEILLANCE CONCLUSIONS SATISFACTORY PERFORMANCE
- PERFORMANCE CATAGORY 2 RECOMMEN_DATIONS MANAGEMENT ATTENTION TO IMPROVE:
- TECHNICIAN PERFORMANCE l
- TRACKING OF SURVEILLANCE STATUS
- SURVEILLANCE PROCEDURES
- PREPARE FOR NEW TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENTS FROM UPGRADE PROGRAM l
l 1
I
_________-__-__-_______N
l FIRE PROTECTION CONCI,USIONS l
PERFORMANCE CATEGORY 1 l
RECOMMENDATIONS l
- CONTINUE EFFORTS TOWARD MEETING APPENDIX R SCHEDULE l
l 1
l l
i i
l l
1
)
QHCLUSIONS
- WEAK PERFORMANCE THROUGH TO 1986 EXERCISE
- IMPROVED PERFORMANCE BECAUSE OF INCREASED
]
MANAGEMENT INVOLVEMENT
- PERFORMANCE CATEGORY 3 I
RE@ EMENDATIONS j
- MAINTAIN MANAGEMENT ATTENTION TO EMERGENCY PREPAREDNESS i
1 1
l i
l l
SECURITY l
CONCLUSIONS l
- PERIMETER SECURITY SYSTEM IN FULL COMPLIANCE
- PERFORMANCE CATEGORY 2 RECOMMENDATIONS l
- DEVELOP SECURITY STAFF BASED ON CURRENT INITIATIVES l
- SOLVE MORALE PROBLEM OF SECURITY FORCE
l l
l l
l OUTAGES l
CONCLUSIONS l
l
- SUCCESSFULLY COMPLETED 11 MONTH OUTAGE
- METHOD OF CONTROLLING OUTAGE ACTIVITIES CHANGED AND IMPROVED
- PERFORMANCE CATEGORY 2 l
EFAQMMENDATIONS
- EXAMINE AND ASSESS VARIOUS TECHNIQUES USE FOR OUTAGE CONTROL
- FORMALIZE THOSE CONTROLS TO BE USED IN THE FUTURE 1
1 I
l
l l
l l
QUALITY PROGRAMS l
CONCLUSIONS
- CONTINUED AND RAPID IMPROVEMENT SHOWN DURING LAST HALF OF PERIOD
- PROBLEMS IN DESIGN CONTROL DECREASE RATING OF THE CATEGORY TO PERFORMANCE CATEGORY 2 RECOMMENDATIONS I
- CONTINUE MANAGEMENT ATTENTION IN THIS AREA
\\
- REDUCE BACKLOG OF CORRECTIVE ACTIONS YET TO BE ACCOMPLISHED 1
IMPROVE DESIGN CONTROL PROCESS i
l l
l t
i l
i l
I l
i l
i i
TRAINING AND QUALIFICATION l
EFFECTIVENESS CONCLUSSTONS i
- PERFORMANCE CATEGORY 2 i
i
)
{
RECOMMENDATIONS i
- IMPLEMENT CRAFT AND SYSTEMS TRAINING FOR ENGINEERING AND MAINTENANCE PERSONNEL l
1 i
i
l o
i i
i LICENSING i
CQHGLUSIONS CONTINUED IMPROVEMENT
- HIGH LEVEL OF ATTENTION BY PSC AND STAFF REQUIRED
- PERFORMANCE CATEGORY 2 i
RECOMMENDATIONS l
MAINTAIN ADEQUATE STAFF RESOURCES
- IMPROVE INTEGRATION BETWEEN LICENSING, NUCLEAR j
ENGINEERING, AND PLANT OPERATIONS
- IMPROVE ORGANIZATIONAL PROBLEM SOLVING ABILITIES I
I
1
SUMMARY
AGENDA 0F THE MEETING BETWEEN THE f
PUBLIC SERVICE COMPANY OF COLORADO AND THE.
i US NUCLEAR REGULATORY COMMISSION j
1 Date:
August _4, 1987
)
e I
Time 1:00 p.m. (MDT)
-]
Location:
Visitors Center, Fort St. Vrain, Platteville, Colorado l
Agenda:
Opening Remarks......... R. Martin, NRC l
Response By........... R. Walker, PSC Discussion of SALP Areas By... J. Gagliardo, NRC Closing Remarks By........ R. Williams, PSC l
i
l l
-4
)
LIST OF PRINCIPLE ATTENDEES SALP MEETING - AUGUST 4, 1987 i
PSC:
l R. Walker, Chairman of the Board R. Williams, Vice President, Nuclear L. Brey, Manager, Nuclear Licensing & Fuels D. Warembourg, Manager, Nuclear Engineering P. Tomlinson, Manager, Quality Assurance l
NRC:
.i R. Martin, Regional Administrator R. Bangart, Director, Division of Radiation Safety and Safeguards J. Gagliardo, Chief, Reactor Projects Branch J. Jaudon, Chief, Project Section A