ML20237G886
| ML20237G886 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 08/28/1987 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | James O'Reilly GEORGIA POWER CO. |
| Shared Package | |
| ML20237G889 | List: |
| References | |
| NUDOCS 8709030013 | |
| Download: ML20237G886 (2) | |
See also: IR 05000424/1987047
Text
_
.-
_
_ _ _ _ _ _
_
_ - -
,c
W
.
AUG 2 B N
Docket Nos. 50-424, 50-425
License Nos. NPF-68, CPPR-109
Geprgia Power Company
LATTN: Mr. James P. O'Reilly
Senior Vice President-
Nuclear Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-424/87-47 AND 50-425/87-34
This refers to the Nuclear Regulatory Conrnission (NRC) inspection conducted by
G. A. Hallstrom on August 3-6, 1987.~ The inspection included a review of
activities authorized for your Vogtle facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
. ithin
W
these areas, the inspection consisted of selective examinations _ of procedures
_
and representative records, interviews with personnel, and observation of
activities. in progress.
Within the scope of the inspection, no ' violations or deviations were
identified.
,
In accordance with 10 CFR 2.790(a), a copy of this letter and enclosure
will be placed in the NRC Public Document Room unless you notify this office
by telephone within 10 days of the date of this letter and submit written
application to withhold infonnation contained therein within 30 days of the
date of this letter.
Such application must be consistent with the requirements
of 2.790(b)(1).
Should you have any questions concerning this letter, please contact us.
Sincerely,
Q90ggggg{g$$$24
NA
N Alan R. Herdt, Chief
G
Engineering Branch-
Division of Reactor Safety
Enclosure:
NRC Inspection Report
4
cc w/ enc 1:
(See page 2)
i
,
l $
y
.
'
y
-
!
's
j
"
AUG 2 81987
I
,
Georgia Power Company
2
1
cp w/ encl:
(P. D. Rice, Vice President, Project
Director
cCT W. Hayes, Vogtle Quality
Assurance Manager
4.' Bockhold, Jr. , General Manager,
.
j
Nuclear Operations
J< Gucwa, Manager, Nuclear Safety
{
and Licensing
i
(J,'A. Bailey, Project Licensing
Manager
j
Er W. Churchill, Esq., Shaw,
t
Pittman, Potts and Trowbridge
L :' E. Joiner, Troutman, Sanders,
J
Lockerman and Ashmore
1
LDf' Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
L: Feig, Georgians Against
D
. Nuclear Energy
(M7 B. Margulies, Esq. , Chainnan,
Atomic Safety and Licensing Board
, Panel
_
'D'r. O. H. Paris, Administrative Judge
(
Atomic Safety and Licensing Board
Panel
'
tG.' A. Linenberger, Jr. , Administrative Judge
Atomic Safety and Licensing Board
1
Panel
bec w/ enc 1:
tE'. Reis, 0GC
f. Miller, NRR
i.,M. , Si n kul e , R I I
tNRC Resident Inspector
,
Document Control Desk
State of Georgia
i
i
f/h/
RII j[d
RII
j
GRHallstrom:er
B1pke
MVSinkule
08/r//87
845 /87
08/ff/87
!
.
i
1
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
______ ______
_ _ _ _
_
}