ML20237G877
| ML20237G877 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 08/25/1987 |
| From: | Thadani M Office of Nuclear Reactor Regulation |
| To: | Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| References | |
| GL-87-08, GL-87-8, NUDOCS 8709030009 | |
| Download: ML20237G877 (3) | |
Text
-
i AUG 1) 1987 Docket No. 50-387/388 Mr. Harold W. Keiser Vice President, Nuclear Operations Pennsylvania Power & Light Company I
2 North Ninth Street Allentown, Pennsylvania 18101
Dear Mr. Keiser:
This is to acknowledge receipt of the Pennsylvania Power and Light Company letter dated November 21, 1986, which transmitted a proposed amendment to the Susquehanna Steam Electric Station Physical Security Plan in response to the Miscellaneous Amendments and Search Requirements.
The submitted document has been reviewed and we have determined that additional information and revisions to the plan are required prior to our approval.
The j
enclosed comments are based upon pertinent NRC regJ1ations and published guidance describing methods, acceptable to the NRC staff, for implementing specific parts of those regulations.
j It is requested that you provide your response to these comments within 30 days from receipt of this letter.
The reporting and/or record keeping requirements contained in this letter i
affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Should you have any questions concerning the enclosed comments, please contact the reviewer, Robert F. Skelton, at (301) 492-4533.
Sincerely, I
I l
Mohan C. Thadani, Project Manager i
Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
)
Enclosure:
DISTRIBUTION W/ ENCLOSURES:
Physical Security Plan Comments RSGB rf Sec rf RFSkelton CBuracker (2) cc w/ enclosure:
Region I P0'Brien See next page MThadani LDocketl File ~50-387/388' Case File NRC'POR' RErickson w/o encl Local PDR LBush w/o enci
. //.
. /M
/N j
- PD I 2
)
OFC :RSGB
- RSGB
- RSGB
- RSGB
_ _ _ _ _ _ :,_J' p___
_/I W
, 7 y__.______
__.$__S0" S.S
___!.SI______!_
___SS___!-
S_ _ _ _ ! _ $ $_" _ _ _ _..I. _ _ 5. _
_ 8/h87
$8/0/87
$8/ /87
$8/(/87
$8 7
$8/2f/87
$8/[87 DATE 0FFICIAL RECORD COPY 8709030009 870825 i
PDR ADOCK 05000387 p
]
p n
Mr. Harold W. Keiser Susquehanna Steam Electric Station l
Pennsylvania Power & Light Company Units 1 & 2 l
i f
cc:
Jay Silberg, Esq.
Mr. W. H. Hirst, Manager Shaw, Pittman, Potts & Trowbridge Joint Generation 1
2300 N Street N.W.
Projects Department I
Washington, D.C.
20037 Atlantic Electric P.O. Box 1500 Bryan A. Snapp, Esq.
1199 Black Horse Pike Assistant Corporate Counsel Pleasantville, New Jersey 08232 Pennsylvania Power & Light Company 2 North Ninth Street Regional Administrator, Pegion I Allentown, Pennsylvania 18101 U.S. Nuclear Regulatory Comission 631 Park Avenue l
Mr. E. A. Heckman King of Prussia, Pennsylvania 19406 I
Licensing Group Supervisor Pennsylvania Power & Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 l
Mr. Loren Plisco Resident Inspector P.O. Box 52 Shickshinny, Pennsylvania 18655 l
Mr. R. J. 'Benich Services Project Manager l
General Electric Company 1000 First Avenue l
King of Prussia, Pennsylvania 19406 Mr. Thomas M. Gerusky, Director Bureau of Radiation Protection Resources Commonwealth of Pennsylvania P. O. Box 2063 Harrisburg, Pennsylvania 17120 Robert W. Alder, Esquire Office of Attorney General P.O. Box 2357 l
Harrisburg, Pennsylvania 17120 Mr. Jesse C. Tilton, III Allegheny Elec. Cooperative, Inc.
21? Locust Street P 0, Box 1266 Harrisburg, Pennsylvania 17108-1266 l
l
f,
.,\\
Docket No. 50-387/388 i
COMMENTS ON PHYSICAL SECURITY PLAN CHANGES (MISCELLANE0US AMENDMENTS AND SEARCH REQUIREMENTS)
SUSQUEHANNA STEAM ELECTRIC STATION
'1 Provide a schedule for implementing the amended safeguards requirements within i
180 days after Commission approval of the proposed security plan.
Reference 10 CFR 73.55.
State that vital area access controls will not be drcpped for life threatening l
situations not involving public health and safety.
Reference 10 CFR 50.54(x) l and (y) and Generic Letter 87-08 (Q&A #3).
Provide a commitment that the search requirements will be implemented within 60 l
days after Commission approval of the proposed revisions.
Reference 10 CFR 73.55(d)(1).
Provide a commitment that in the case of an individual's involuntary termination for cause, the individual's unescorted facility access will be revoked, and identification badge and other entry devices shall be retrieved prior to or i
simultaneously upon notification of termination.
Reference 10 CFR 73.55(d)(7)(1)(C).
1 1
Provide a commitment to ensure prompt access to vital equipment to accommodate the potential need fer rapid ingress or egress of individuals during emergency conditions or situations.
Indicate how this prompt access will be ensured (e.g., by issuing override keys to appropriate operators and security force I
members at the start of each shift, or by other acceptable means).
Reference 10 CFR 73.55(d)(7)(ii) and Generic Letter 87-08 (Q&A #6).
Revise the commitment on pages 11-1 and 15-1 to periodically (annually) review physical security and contingency plans and procedures to evaluate their potential impact on plant and personnel safety.
Reference 10 CFR 73.55(d)(7)(ii)(B) and Regulatory Guide 5.65.
Rev'se the commitment on page 2-10 that all keys, locks, combinations, and related access control devices used to control access to protected and vital areas shall be changed or rotated from " annually" at least every 12 months. Reference 10 CFR 73.55(d)(9).
Provide a specific commitment that the secono ry power supply systems for non-i portable communications equipment shall be located within a vital area.
Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08 (Q&A #16).
Provide a commitment to maintain a log indicating name, badge number, time of entry, and time of exit of all individuals granted access to a vital area except those individuals entering or exiting the reactor control room.
Reference 10 CFR 73.70(d).
l l