Forwards Insp Repts 50-445/87-14 & 50-446/87-11 on 870708-0804.No Deviations or Violations Noted
ML20237G579
Person / Time
Site: Comanche Peak  
Issue date: 08/26/1987
From: Warnick R
NRC OFFICE OF SPECIAL PROJECTS
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20237G582 List:
References
NUDOCS 8709020314
Download: ML20237G579 (3)


See also: IR 05000445/1987014

Text

. - .

. .

. ..

.

.. ..

..

.

.. ..

.

.

..

..

---

.

.;

.

In Reply Refer To:

Dockets:

50-445/87-14

50-446/87-11

TU Electric

ATTN:

Mr. William G. Counsil

Executive Vice President

400 North Olive Street, Lock Box 81

Dallas, Texas

75201

Gentlemen:

This refers to the inspection conducted by Mr. H.

S.

Phillips of

the Comanche Peak Project Division during the period July 8 through

August 4, 1987, of activities authorized by NRC Construction

Permits CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric

Station, Units 1 and 2, and to the discussions of our findings with

you and other members of your staff during and at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection.

Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the

inspector.

Within the scope of the inspection, no violations or deviations

were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

1

1

1

.

R.

F. Warnick, Assistant Director

l

for Inspection Prograns

Comanche Peak Project Division

Office of Special Projects

Enclosure:

Inspection Report

50-445/87-14; 50-446/87-11

OSP:CPPD:IP: SRI

AD:IP RFR)

SPhillips

RWarnick

8/24 /87

8/aG/87

i

)

8709020314 870826

ADOCK05000gS

PDR

G

_ _ _ _ _ _

l

'

o

UNITED STATES

' , ,

["

g

NUCLEAR REGULATORY COMMIMilON

r E

WASHINGTON, D C. 20555

%

c

4 * . . . + $~

j

%

In Reply Refer To:

'

Dockets:

50-445/87-14

50-446/87-11

TU Electric

ATTN:

Mr. William G.

Counsil

Executive Vice President

400 North Olive Street, Lock Box 81

Dallas, Texas

75201

Gentlemen:

This refers to the inspection conducted by Mr. H. S. Phillips of

the Comanche Peak Project Division during the period July 8 through

August 4, 1987, of activities authorized by NRC Construction

Permits CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric

Station, Units 1 and 2, and to the discussions of our findings with

l

you and other members of your staff during and at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection.

Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the

inspector.

Within the scope of the inspection, no violations or deviations

were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

R F idd

R.

F. Warnick, Assistant Director

for Inspection Programs

Comanche Peak Project Division

Office of Special Projects

Enclosure:

Inspection Report

!

!

50-445/87-14; 50-446/87-11

I

'

l

_ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ . - - _ _ _

_ _ _ -

- - -

!

_

_ _ - _ _ _ - - - - _

'

TU Electric

2

cc w/ enclosure:

G.

S. Reeley

Bureau of Radiation Control

Manager, Nuclear Licensing

State of Texas

TU Electric

1100 West 49th Street

Skyway Tower

Austin, Texas

78756

400 North Olive Street, L.B.81

,

Dallas, Texas

75201

Nancy H. Williams

CYGNA Energy Services

Juanita Ellis

Suite 390

President - CASE

2121 N. California Blvd

1426 South Polk Street

Walnut Creek, CA

94596

Dallas, Texas

75224

Renea Hicks, Esq.

Assistant Attorney General

Environmental Protection Division

P.O.

Box 12548, Capitol Station

Austin, Texas

78711-2548

Administrative Judge Peter Bloch

U.S. Nuclear Regulatory Commission

Washington,

D.C.

20555

Elizabeth B. Johnson

Administrative Judge

Oak Ridge National Laboratory

Post Office Box X, Building 3500

Oak Ridge, Tennessee

37830

Dr. Kenneth A. McCollom

1107 West Knapp

Stillwater, Oklahoma

74075

Dr. Walter H. Jordan

Administrative Judge

881 West Outer Drive

Oak Ridge, Tennessee

37830

Anthony Z. Roisman, Esq.

Suite 600

1401 New York Avenue, N.W.

Washington, D.C.

20005

Ms. Billie Pirner Garde

Government Accountability Project

Midwest Office

104 East Wisconsin Avenue

Appleton, Wisconsin

54915-8605

_ _ _ _ _ - _ _ - _ _