ML20237E761
| ML20237E761 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 12/21/1987 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Trevors G NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20237E763 | List: |
| References | |
| NUDOCS 8712290171 | |
| Download: ML20237E761 (2) | |
See also: IR 05000298/1987028
Text
. _ _ _ - _ - - - _ . _ - - _ _ _ -
-
_ _._ _ _ _.-. _ _ - .
__
's
a
a
.. ~ e
s
[..
,
DEC 211967
.In Reply-Refer To: .
Docket: 50-298/87-28
\\
'
-Nebraska Public Power District
.
'O
ATTN: George A. Trevors-
.
Division Manager - Nuclear Support
o
P.O. Box 499
Columous, NE
68601
Gentlemen:
I
This refers to the inspection conducted by Messrs. W. R. Bennett and
E. A. Plettner of this office during the period November 1-30, 1987, of
activities authorized by NRC Operating License DPR-46 for the Cooper Nuclear
' Station and to the discussion of our findings with Mr.
G.~ R. Horn and~other
members of your staff at the conclusion of the inspection.
v
Areas examined during the_ inspection included engineered safety feature
.
!
walkdown, monthly surveillance and maintenance observations, operational safety
!
verification, and radiological protection. Within these areas the inspection
i
consisted of selective examination of procedures and represe'cutive records,
interviews with personnel, and observations by the NRC inspectors. . The
inspection findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of.your activities were in
4
violation of NRC requirements. Consequently,-you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
We have also identified actions you'have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 2 of the enclosed report.
-h
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
\\
\\
RIV:RI pn/
'EAPIettner/s[n
RIV: SRI $/n/gvC:RPB/C jf2/q D:DRP
WRBennett
GLMadsen
LJCal1an
/p/e;/87
/Z / d/87
1 7 //s/87
pfzl/87
l
8712290171 B71221
~ <
ADOCK 0500029s 7
l
jfl
"*"
-
1
__-__ ___
N
_ , _ _
7
'
f
'y
e
i
,
\\
o
1
- r\\
,>
l
NebraskaPublicPowerDistrictM[
?-
,
s
.
,
k
Should you have any questions concerning this inspection, we will be pleased to
'
discuss them with you.
Sincerely,
Orighal Signed By
L J. Callan i y
i
L.J.CaDin/ilrect.or,'
/n
i
Reactor Projecti Division
i
'
'
\\
%
)
'
Enclosures:
('
1.
Appendix A - flotice of Violation
i
2.
Appendix B - NRC Inspection Report 3
50-298/87-28
[
cc/w enclosures:
5
Cooper Nuclear Station
(
ATTN: Guy R. Horn, Division Manager
'
'
(
of Nuclear Operations
,
,
P.O. Box 98
)
Brownville, Nebraska
68321
l
'
Kansas Radiation Control Program Director
'
,
Nebraska Radiation Control Program Director
<,
bec to DMB (IE01)
"
'
bcc distrib. by RIV:
,
\\
- RRI
s P,1 D. Martin, RA
9'
- Section Chief (DRP/C)
- Lil.a Shu , RM/ALF
RPSB-DRSS
- Mit System
- RIV File
- Project Engineer, DRP/C
- RSTS Operator
- W. Long, NRR Project Manager
- R. Hall
- DRS
- TSS
- DRP
'
- w/766
.<
.i
,
f
n
v7
iA
. _ _ _ _
___.____.___________._______1___._______.___w