Forwards Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted.Licensee Response to Feedwater Flow Venturi Instrument Line Crack Reflected Excellent Mgt Involvement Which,In Turn Resulted in Well Controlled & Coordinated Maintenance
ML20237E709
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/28/1998
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Edington R
ENTERGY OPERATIONS, INC.
Shared Package
ML20237E711 List:
References
50-458-98-15, NUDOCS 9809010124
Download: ML20237E709 (5)


See also: IR 05000458/1998015

Text

- _ - _ _ _ _ _ _ _ _ _ _

.

o

!p arc % UNITEo STATES

  • '

[ i , ,1 ' i NUCLEAR REGULATORY COMMISSION

" 8

'1 REGION 6V

S.,' [ 6119YAN PLAZA ORiVE SUITE 400

%, w ,,d' ' ARUNGTON TEXAS :'601t 8064

.....

AUG 281998

Randall K. Edington,- Vice President - Operations

River Bend Station  !

1

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775

SUBJECT: NRC INSPECTION REPORT 50-458/98-15

Dear Mr. Edington:

From June 28 through August 8,1998, an NRC inspection was conducted at your River Bend

Station reactor facility. The enclosed report presents the scope and results of that inspection.

During the 6-week period covered by this inspection, your conduct of activities at River Bend l

Station was generally characterized by safety-conscious operations, sound engineering and

maintenance practices, and effective radiological controls. Your response to a feedwater flow

venturi instrument line crack reflected excellent management involvement which, in turn,

resulted in well controlled and coordinated maintenance.

We also noted that you have identified two negative performance trends. First, Operations

personnel continued to make errors that have impacted plant performance. Your initial

corrective measures for this trend were not timely in that detailed crew performance briefings

were conducted approximately one month after the trend was identified. Second, you've

identified severalinstances of surveillance that were not performed when required. For both of

these performance trends we consider your planned and completed corrective measures

adequate and reasonable. Nonetheless, we encourage you to maintain effective managoment

oversight of these areas to prevent further recurrence.

'In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

1

\,

, Thomas P. Gwynn, irector

I Division of Reactor ojec

Docket No.: 50-458

License No.: NPF-47

l

L 9809010124 980828 ~

l PDR ADOCK 05000458

l

G PM

L - _ _-. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

_ _ _ _ . _ _ - _ _ - - - - - - - -

.

.

Entergy Operations, Inc. 1-

gg

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator Senior Resident inspector (Grand Gulf)

DRP Director DRS-PSB

Branch Chief (DRP/C) MIS System

Project Engineer (DRP/C) RIV File

Branch Chief (DRP/TSS) Resident inspector

. . . ,, p r e

v .:.\1 .) G ==

DOCUMENT NAME: R:\_RB\RB815RP.GDR

To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N* = No copy

RIV: SRI RI '

l C:DRS/PS l C:DRP/C l D:DRP , A.)

GDReplogie JKa en NPGarrett t?R/, BMurray*

'

^

CSMarschall* TPGwynn VT }

8/ A /98 1 a uh e.- 8/r- /98 c: %!n 8/26/98 8/26/98 8//f/98 /

  • previously concurred

OFFICIAL RECORD COPY

- _ _ _ _

- _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _

l'. 1

,

l

Entergy Operations, Inc. -2-

Enclosure:

NRC Inspection Report

50-458/98-15

cc w/ enclosure:

' Executive Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P.O.' Box 31995

,

Jackson, Mississippi 39286-1995

Vice President

Operations Support  ;

l

' Entergy Operations, Inc.

- P.O. Box 31995

Jackson, Mississippi 39286-1995

General Manager

Plant Operations

River Bend Station i

'

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775

- Director - Nuclear Safety

,

_ River Bend Station

Entergy . Operations, Inc.

' P.O. Box 220

St. Francisville, Louisiana 70775

Wise, Carter, Child & Caraway

E >

P.O. Box 651

Jackson, Mississippi 39205

Mark J. Wetterhahn, Esq.

Winston & Strawn -

,

1401 L Street, N.W.

. Washington, D.C. 20005-3502

Manager - Licensing

i. ,

River Bend Station ,

!  : Entergy Operations, Inc.

P.O. Box 220 '

St. Francisville, Louisiana 70775

l

u

c ~-

. -

_ _ -_ __ __ . __ . _ _ _ _ _ - _ _ - - _ _ _ _ _ - - - - _ _ _ _ _ _

-_ __ - __ _. _ - _ - _ _ _ _ _ _ _

.

..

Entergy Operations, Inc. -3-

l

The Honorable Richard P. leyoub

l Attorney General

Department of Justice

State of Louisiana

P.O. Box 94005

Baton Rouge, Louisiana 70804 9005

H. Anne Plettinger

3456 Villa Rose Drive

Baton Rouge, Louisiana 70806 .

1

!. . President of West Feliciana

l. Police Jury

. P.O. Box 1921

St. Francisville, Louisiana 70775

l

>

-William H. Spell, Administrator -

' Louisiana Radiation Protection Division -

- P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

.I

l

l

,

L _m ml_ m _ . _ _ _ . - -. _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ - _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ . . . _ , _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ .

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _______________

.

i

.

Entergy Operations, Inc. -1-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS) l

E-Mail report to Document Control Desk (DOCDESK)

, E Mail report to Richard Correia (RPC)

l E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator Senior Resident inspector (Grand Gulf)

DRP Director DRS-PSB .

Branch Chief (DRP/C) MIS System

l -. Project Engineer (DRP/C) ~ RIV File i

l Branch Chief (DRP/TSS) Resident inspector i

l 3

i

?

l

P

,

i

l

!.

t-

y

DOCUMENT NAME: R:\_RB\RB815RP.GDR

To receive copy of document, Indicate in box: "C' = Copy without enclosures *E' = Copy with enclosures "N' = No copy

l

RIV: SRI RI C:DRS/PS C:DRP/C D:DRP A) '

GDReplogie G)n (,n NPGarrett(%Ik, BMurray* CSMarschall* TPGwynn VT}

8/70/98 fu hicen 8/2# /98 Pu %k 8/26/98 8/26/98 8/M/98 /

- *previously concurred

OFFICIAL RECORD COPY  !

l

p