ML20237E190
| ML20237E190 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 08/21/1998 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Wadley M NORTHERN STATES POWER CO. |
| Shared Package | |
| ML20237E192 | List: |
| References | |
| 50-263-98-1, 50-263-98-11, NUDOCS 9808310026 | |
| Download: ML20237E190 (3) | |
See also: IR 05000263/1998011
Text
. - - . - _
_
-.
. . _ _ .
. _ - _ _ - _ _ _ --__--_.____ -._-_-_ -____-___- - - -
. . .
- * *
. .
,
- g aeruq'o
UNITED STATES
.
NUCLEAR REGULATORY COMMISSION
g
8..
REGION 111
o
d
g.
801 WARRENVILLE ROAD
LISLE, ILLINOIS 60532-4351
4 g *"
August 21, 1998
i
Mr. M. Wadley -
. President, Nuclear Generation
Northem States Power Company
414 Nicollet Mall
4
Minneapolis, MN 55401
l
- SUBJECT:
MONTICELLO INSPECTION REPORT 50-263/98011(DRP)
i
. Dear Mr. Wadley:'
l
On July.18,1998, the NRC completed an inspection at the Monticello reactor facility. The
j
enclosed report presents the results of that inspection.
During the 7-week period covered by this inspection, the conduct of activities r:t the Monticello
- facility was generally characterized by acceptable operational practices, sound engineering and
maintenance philosophies, and careful radiological work controls. Routine control room activities
were generally performed in accordance with administrative procedures.- However, although
operators were generally attentive to panels, we continue to identify examples of a lack of
attention-to-details regarding parameters and equipment status.
We noted your initiative to evaluate operator performance during the June 29,1998, loss of
! condenser vacuum transient. Your staff's critical review of the event initially identified that shift
management misread an abnormal procedure step._
l
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Sincerely,
S
~~
C
%
.
Ghoffrey E. G
Di
or
Division of Reactor Proje s
Docket Non ~ 50-263
License No.: DPR-22
i
!
. Enclosure:
Inspection Report 50-263/98011(DRP)
,
cc w/ encl:
Plant Manager, Monticello
' State Liaison Officer, State
of Minnesota
'
9808310026 980821
ADOCK 05000263
0
,
..
,
,
l~
August 21, 1998
Mr. M. Wadley
President, Nuclear Generation
Northem States Power Company
414 Nicollet Mall
(
Minneapolis, MN 55401
SUBJECT:
MONT! CELLO NRC INSPECTION REPORT NO. 50-263/98011(DRP)
' Dear Mr. Wadley-
,
.On July 18,1998, the NRC completed an inspection at the Monticello reactor facility. The
L.
enclosed report presents the results of that inspection.
. During the 7-week period covered by this inspection, the conduct of activities at the Monticello
facility was generally characterized by acceptable operational practices, sound engineering and
- maintenance philosophies, and careful radiological work controls. Routine control room activities
were generally performed in accordance with administrative procedures. However, although
Loperators were generally attentive to panels, we continue to identify examples of a lack of
attention-to-details regarding parameters and equipment status.
We are encouraged by your initiative to evaluate operator performance during the June 29,1998,
loss of condenser vacuum transient. Your staff's critical review of the event initially identified that
shift management misread an abnormal procedure step.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Sincerely,
)
!
/s/ G..E. Grant
i
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket No.: 50-263
License No.: DPR-22
Enclosure:
~ Inspection Report 50-263/98011(DRP)
.cc w/ encl:
Plant Manager, Monticello
State Liaison Officer, State
of Minnesots
! DOCUMENT NAME: G:\\Mont\\ mon 98011.drp
T.
i . n .e nii. 4
inac.i. w a w,n c - c n m .i .n.cewn.nu.a.i
r - con wm, .n.eeun.nu
i.
n - u.
w
OFFICE
Rlli
Rlli -
Kunowhh h Grant gyp
NAME
h
DATE
08 6/98 O ( \\
088 980 O
' OFFICIAL RECORD COPY
<
-
.
Q.,
-
,
i
-
M. Wadley
-2-
!
1
Distribution:
CAC (E-Mail)
Project Mgr., NRR w/ encl-
J. Caldwell, Rlll w/enci
C. Pederson, Rlli w/enci
1
' B. Clayton, Rill w/enci
SRI Monticello w/ encl
DRP w/enci
TSS w/enci
DRS (2) w/enci
' Rlli PRR w/ encl
t#UBLIC IE-01 w/enci
Docket File w/enci
' GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
I
Q
l
l
l
mou
- - - --- a