. - _ _ _
. _ _ _ _ _ _ _ _ _ .,
DEC 181907
In Reply Refer To:
!
Dockets:
50-498/87-45
50-499/87-45
Houston Lighting & Power Compar.y
ATTN:
J. H. Goldberg, Group Vice
i
President, Nuclear
'
P.O. Box 1700
l
Houston, Texas
77001
I
'
Gentlemen:
This refers to the operational readiness inspection performed by an NRC team
during the period June 29 through July 2,1987, of activities authorized by NRC
Construction Permits CPPR-128 and CPPR-129 for the South Texas Project, and to
the discussion of our findings with members of your staff at the conclusion of
the inspection.
This NRC effort at the South Texas Project (STP) represents a new inspection
approach involving an assessment of the operational readiness of the STP staff.
This type of assessment is expected to be performed at future NT0Ls prior to
issuance of the low power license, prior to issuance of the full power license,
and prior to exceeding the 50 percent power plateau. The results of this
inspection were used as an input into the NRC decision to issue an operating
license for the STP Unit I facility. The basis of the inspection approach is
discussed in Section 2 of the report.
Particular attention was directed to
determining that an operational mentality had been developed in the areas of
the management team, the operations staff, the SAFETEAM organization,
surveillance testing efforts, maintenance activities, work / test controls, and
in the efforts to learn from operational experiences. The team also reviewed
the Quality Display Processing System and the use of the master completion
list.
The inspection findings are documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified, but a number of concerns were identified by the team and are
i
documented as observations in the report. The observations documented in the
report were communicated to you and your staff at the exit meeting.
You have
,
provided your position and the action taken for each of the observations in
,
your letters of July 15 and August 18, 1987 (Enclosures 3 and 4 to NRC). We
i
will review these actions during future inspections. Several concerns
identified in the enclosed inspection report were not specifically discussed
'
at the exit meeting. These concerns are identified as open items and will be
reviewed during a future inspection.
_ . _ _ _ . - _ _ _ _ _
._
- PS
NRR '
C:0Bt
D DR
stable p N /A bfgNCalho JEGag#k.1 ardo JMil oan
L Call
L
PKa
L /G /87
87 N/l\\A87 p./n /Q7
M//(g/87
g/(q/87
Nu w 94AM
\\
8712240156 871218
0
ADDCK 05000498
G
g
1
- _
_ _ _ _ - _ _ .
-
_ _ _ _ _ _ _ _ _ _ _ _ _
Houston Lighting & Power Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed By
L.L CaHan
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1
1.
Appendix A - NRC Inspection Report
50-498/87-45
50-499/87-45
2.
Appendix B - Persons Contacted
3.
Houston Lighting & Power letter
dated July 15, 1987
4.
Houston Lighting & Power letter
dated August 18, 1987
cc w/ enclosures:
Houston Lighting & Power Company
ATTH:
M. Wisenberg, Manager
Nuclear Licensing
P.O. Box 1700
Houston, Texas
77001
Houston Lighting & Power Company
ATTN:
Gerald E. Vaughn, Vice President
Nuclear Operations
P.O. Box 1700
Houston, Texas
77001
Central Power & Light Company
ATTN:
R. L. Range /R. P. Verret
P.O. Box 2121
Corpus Christi, Texas
78403
City Public Service Board
ATTN:
R. J. Costello/M. T. Hardt
.
P.O. Box 1771
'
San Antonio, Texas
78296
..
__
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _
_ _
._
_
_ _ _
_ _ _ _ _ _ _ _
-- __
_-
i
Houston Lighting & Power Company
-3-
City of Austin
ATTN:
M. B. Lee /J. E. Malaski .
P.O. Box 1088
78767-8814
Texas Radiation Control Program Director
bcctoDMB(IE01)
bec distrib. by RIV:
_
- DRP
- RRI-OPS
R. D. Martin, RA
- RRI-CONST.
- SectionChief(DRP/D)
RPSB-DRSS
,
- MIS System
- RIV File
l
- Lisa Shea, RM/ALF
- RSTS Operator
i
R. Bachmann, 0GC
- H.
Bundy
- P. Kadambi, NRR P.'oject Manager
- R. Taylor
- TSS
- R. Hall
- DRS
D. Powers
J. Calvo
l
- w/766
4
i
_ _ _ _ _ _ _