Forwards Amend 98-01 to Third Ten Year Interval ISI Plan, for NRC Review & Approval
ML20237D640
Person / Time
Site: Pilgrim
Issue date: 08/20/1998
From: Ted Sullivan
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20237D642 List:
References
BECO-2.98.089, NUDOCS 9808270102
Download: ML20237D640 (4)


Text

_ _ _ _ _ _. _

,Y3 b,,

10 CFR 50.55 Boston Edison Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360 T.A. Sullivan General Manager Production and Station Director August 20, 1998 BECo Lir.2.98.089 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 l

Docket No. 50 293 i

License No.DPR-35 Amendment 98-01 To The Third Ten Year Interval inservice Inspection Plan

References:

1. BECo Letter 95-091, dated 9/1/95. E.T. Boulette to NRC, " Third Ten-Year Inservice inspection P PNPS (ISI)".
2. BECo Letter 96-009 dated 2/15/96. " Boston Edison Company Response to NRC Request for Additional Information on Pilgrim Third Ten-Year ISI Program (TAC No. M93398)".
3. BECo Letter 90-035, dated 4/16/96. E.T. Boulette to NRC," Revised Table Related to RPV Nozzle Examination, Pilgrim Plant Relief Request (PRR) 9, Third Ten-Year ISI Program (TAC No. M9339
4. BECo Letter 96-067, dated 7/12/96. E.T. Boulette to NRC," Revised PRR-24, Pilgrim Third Ten-Year ISI Program".
5. BECo Letter 97-015, dated 02/10/97. E.T. Boulette to NRC, " Withdrawal of PRR -7, Pilgrim Third

~ Ten-Year ISI Program".

6. NRC Letter 97-026, dated 3/20/97. P.D. Milano to E.T. Boulette, " Evaluation of the Third Te Interval Inspection Program Plan, and Associated Requests for Relief for Pilgrim Nuclear Power

/

Station".

/

Discussion k

In accordance with 10CFR50.55(a)(g)(5)(i), Amendment 98-01 to the Pilgrim inservice Inspection (ISI)

Program is submitted for your review and approval. This amendment incorporates changes to the Pilgrim ISI Program as submitted in Reference 1 and reflects changes as presented to the NRC in Reference 2,3,4, and 5 as well as NRC approval of the plan presented in Reference 6. We are request!1g deletion of penetrations X-21, X-46E, and X-228A from the ISl Plan based on a modification that will be performed in Refueling Outage 12 to cap and seal weld the piping lines at these penetrations. Piping associated with penetration X-46E is being evaluated for use by another plant modification. If the piping line passing through penetration X-46E is modified other than by cutting and capping, it will be included in the ISI Program which may require additional relief. This amendment also includes Pilgrim Relief Request (PRR) 13, Revision 2, incorporating ASME Code Case N-522 with alternative provisions from draft Regulatory Guide DG-1050. Additionally, this amendment includes

(

minor clarifying changes to PRR-11, Revision 2 which incorporates a reference to periodic IST testing 9908270102 990820 PDR ADOCK 05000293 l

0 PM

t

,-[

inst;Id of quistriy 1: sting end clarifirs tha salt sarvico wat:r syst:m pump typ3. Thess chang 3s are i

cdministrativa in n tura and do not aff:ct th3 t:chnical content of the request.

If you have questions.or-comments regarding this submittal, please direct them to Mr. Robert S.

Sheridan at (508) 830-8291.

/ T.A. ullivan RLC-298089

Enclosures:

Inservice Inspection Program Amendment 98-01

. Inservice inspection isometric Drawings cc:

Mr. Alan B. Wang, Project Manager Project Directorate 1-3 Office of Nuclear Reactor Regulation Mail Stop: OWFN 14B2 U. S. Nuclear Regulatory Commission 1 White Flint North -

11555 Rockville Pike Rockville, MD 20852 U. S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia PA 19406.

Sr. NRC Resident inspector - w/o attachments t

i-

/

Pilgrim Station 3rd Interval Inservice Inspection Plan

]

Program Amendment 98-01 INSERVICE INSPECTION PROGRAM AMENDMENT ISI 98-01 Ihis Amendment makes the following changes:

i L

I 1.

Revises Pilgrim Relief Request PRR-13 (requires NRC approval) 2.

Withdraws Pilgrim Relief Request PRR-22 1

3.

Withdraws Pilgrim Relief Request PRR-7 4.

. Withdraws Pilgnm Relief Request PRR-18 5.

Revises Pilgrim Relief Request PRR-24 (previously approved) 6.

Revises Pilgnm Relief Request PRR-11 (previously approved)

L.

7.

Adds reference to ASME XI, Subsection IWE, in the basis of the plan.

I i

l 8.

Adds Table 3.2, Components Scheduled for Fv=mination, to Program 1

9.

Revises Table 3.1, Summary Table, to reflect:

l

[

Category C-F-1 and C-F-2 weld total increases due to augmented requirements for I

I Class 2 pipe welds with thickness less than 0.375".

l l

1

' Class 2 pipe supports Category F-A were increased in population due to inclusion of-

==MM thin-wall welds in program Category B-K-1 and C-C integral =*=chmant welds were decreased when integral

=*=rh=aat welds with component base metal thickness ofless than 0.63" and 0.75",

respectively, were excluded from program I

Category C-G valve body welds decreased due to valve replacements.

Category B-F welds increased due to various exempted welds being included as part i<

of the total.

Category B-H welds changed due to augmented exammation requirements.

l" Category D-hvelds were adiusted to reflect current counting methodology.

1 Pilgrim Station 3rd Inttrval Inservice Inspection Plan Program Amendment 98-01 REMOVE-REVISION 0, PAGES INSERT-AMENDMENT 98-01, PAGES iii iii iv iv l-1 & 1-2 1-1 & 1-2 2-3 to 2-7 2-3 to 2-7 l

3-1 to 3-9 3-1 to 3-9 3-10 to 3-57 1

4-4 & 4-5 4-4 l

4-16 to 4-18 4-16 to 4-18 4-26 to 4-28 4-26 to 4-28,4-28a,4-28b 4-35 to 4-37 4-35 to 4-37 4-42 to 4-43 4-42 to 5-43 446 2 447 446 0447 i

l 5-2 & 5-3 1

l