1 December 15, 1987 I

l Docket No. 50-285 Mr. R. L. Andrews Division Manager - Nuclear Production Omaha Public Power D M rict 1623 Harney Street Omaha, Nebraska 68102

Dear Mr. Andrews:

SUBJECT:

WATER INTRUSION INTO THE INSTRUMENT AIR SYSTEM As we indicated in our minutes of the meeting, dated November 13, 1987, the I

staff concluded that they were satisfied with Omaha Public Power District (OPPD) work scope and response relative to the incidents of water ingress into the Instrument Air System.

In addition, as a result of this meeting, OPPD I

submitted additional information on the docket dated November 20, 1987, which we reviewed.

The staff has concluded from this review that as a result of OPPD placing heavy emphasis on removing the water from the Instrument Air System and corrective actions planned, defined, and scheduled, the plant is back to its original configuration and safe to operate.

Your continued valve cycling program and operator teardowns should detect any long term effects of residue or residual water.

Therefore, the staff has concluded that Fort Calhoun Station, Unit 1 can continue its operation.

Our conclusion with s

respect to the longer term seismic qualification problem will be addressed in a forthcoming letter in the near future.

Sincerely, Jose A. Calvo, Director Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects cc:

See next page DISTRIBUTION.

Docket =Filea NRC POR Local PDR PD4 Reading DR4A/J. Collins J. Calvo P. Noonan A. Bournia OGC-8ethesda E. Jordan J. Partlow J. Craig ACRS (10)

PD4 Plant File

  • See previous concurrences:

PD4/LA*

PD4/PM*

SPLB*

PD4/D /b PNoonan ABournia:sr JCraig JCalvo 12/15/87 12/15/87 12/15/87 12/15/87 l

l 8712240087 871215 PDR ADDCK 05000285 P

PDR i

p-

(.

' e

' Docket No. 50-285

' ' W Mr.-R.'Li Andrews Di. vision Manager'- Nuclear Production

. Omaha Public Power District 1623 Harney. Street L0maha,' Nebraska-68102

Dear Mr. Andrews:

SUBJECT:

WATER' INTRUSION INTO THE' INSTRUMENT' AIR SYSTEM I

As we indic'ated 'in our minutes' of the meeting, dated November 13, 1987, th.

j staff concluded that they were satisfied with Omaha'Public Power District i

(OPPD) work scope and response relative to the incidents of water ingre'ss into-the Instrument Air. System.

In' addition, as a result of this' meeting /0 PPD submitted additional information'on the docket dated November 20,-1987, which we reviewed.

The staff has concluded from this review that as'a r6sult of-OPPD placing heavy' emphasis on removing the water from'the Instru' ment Air' System and corrective-actions planned, defined, andfscheduled.,t',he plant is

~

back to.its original configuration'and safe.to operate.. Your/ continued valve

.i cycling program and operator.teardowns will_ detect any long, term effects of-1 residue or residual water.

Therefore,.the' staff has concluded that~ Fort-j Calhoun. Station, Unit-1:can' continue its operation.

Our, conclusion with respect' to the' longer term seismic qualification problem'will be addressed in a forthcoming letter in the near future.

/

/

sincerely, f-JoseA;j5alvo, Director.

,d Project' Directorate - IV' Division of Reactor Projects'- III, IV, V and Special. Projects cc:

See next page

/

DISTRIBUTION

/

Docket File NRC PDR

[

Local PDR PD4 Reading

-DR4A/J. Collins J. Calvo P. Noonan A. Bournia 0GC-Bethesda E. Jordan J. Partlow J. Craig

-I ACRS (10)-

PD4 Plant File f

+m i

il

/

wk j

f PD4/LA

/

PD4/PM SPLB PD4/D l

PNoonan

/

ABournia:sr a

JCraig JCalvo 12/f(/87 12/19/87-12/($87 '

12/ /87

,/

d e

i

______-___________-_________-.________-______-O

Mr. R. L, Andrews Fort Calhoun Station Omaha Public Power District Unit No. I cc:

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, D.C.

20036 Mr. Jack Jensen, Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Mr. Phillip Harrell, Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 309 Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations C-E Power Systems 7910 Woodmont Avenue Bethesda, Maryland 20814 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Harold Borchert, Director Division of Radiological Health Department of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509 W. G. Gates, Manager For-t Calhoun Station P. O. Box 399 Fort Calhoun, Nebraska 68023 1

i l

(

!