August 20, 1998
Mr. Leon J. Olivier
Senior Vice President - Nuclear
BEC Energy
Pilgrim Nuclear Power Station
600 Rocky Hill Road
Plymouth, Massachusetts 02360-5599
SUBJECT:
NRC INSPECTION REPORT 50-293/98-09
Dear Mr. Olivier:
The NRC conducted an inspection between July 13, and July 24,1998, at the Pilgrim
Nuclear Power Station. The inspection was focused upon engineering evaluations in
support of operability determinations, the corrective action (problem reporting) process,
and the effectiveness of actions associated with findings from previous NRC inspections.
,
The results of the inspection were discussed with Messrs. C. Goddard, T. Sullivan and
I
others of your staff at an exit meeting held on July 24,1998. Subsequent to that date,
resolution of the emergency diesel generator ambient temperature design issue was
discussed via telephone call with your staff on August 13,1998.
Operability questions were found to be appropriately resolved using engineering
evaluations, and management oversight of the process was evident. Corrective actions
associated with previous inspection findings were as stated in responses and reports
submitted to the NRC, and were appropriate.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure will be placed in the NRC Public Document Room.
Your cooperation with us is appreciated.
I
Sincerely,
ORIGINAL SIGNED BY:
,
Eugene M. Kelly, Chief
Systems Engineering Branch
7
Division of Reactor Safety
Docket No.: 50-293
/
License No.: DPR-35
Enclosure:
Inspection Report 50-293/98-09
^'
9808260303 980820
ADOCK 05000293
G
{
J
_ _ _ _ _ - _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ -
-.
.
,
i
Mr. Leon J. Olivier
2
cc w/ encl:
R. Ledgett, Executive Vice President - Operations
C. Goddard, Plant Department Manager
J. Alexander, Regulatory Relations
D. Tarantino, Nuclear Information Manager
R. Hallisey, Department of Public Health, Commonwealth of Massachusetts
The Honorable Therese Murray
The Honorable Joseph Gallitano
T. MacGregor, Mass. Dept. of Public Comm. & Energy
Chairman, Plymouth Board of Selectmen
Chairman, Duxbury Board of Selectmen
Chairman, Nuclear Matters Committee
Plymouth Civil Defense Director
P. Gromer, Massachusetts Secretary of Energy Resources
J. Miller, Senior issues Manager
J. Fleming
A. Nogee, MASSPIRG
Office of the Commissioner, Massachusetts Department of Environmental Quality
Engineering
Office of the Attorney General, Commonwealth of Massachusetts
T. Rapone, Massachusetts Executive Office of Public Safety
!
!
Chairman, Citizens Urging Responsible Energy
i
Commonwealth of Massachusetts, SLO Designee
I
!
l
l
L
L
_-_-_____ _ _
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ - _ _ - _ _ _ _ _ _ _
4
Mr. Leon J. Olivier
3
Distribution w/ encl:
)
Region I Docket Room (with concurrences)
i
Nuclear Safety Information Center (NSIC)
)
PUBLIC
'
NRC Resident inspector
l
C. Cowgill, DRP
i
R. Summers, DRP
'
C. O'Daniell, DRP
l
H. Miller, RA/W. Axelson, DRA
J. Wiggins, DRS
!
L. Nicholson, DRS
E. Kelly, DRS
1
J. Yerokun, DRS
DRS File
l
Distribution w/enci (VIA E-MAIL):
B. McCabe, OEDO
C. Thomas, NRR (COT)
- A. Wang, NRR
R. Correia, NRR .
F. Talbot, NRR
DOCDESK (ALL INSPECTION RPTS)
'
inspection Program Branch, NRR (IPAS)
!
DOCUMENT NAME: G:\\ SYSTEMS \\YEROKUN\\PILG9809. INS
l
T2 receive a copy of this document. Indicate in the box:
"C" = Copy without attachment / enclosure
"E" = Copy with attachment / enclosure
"N" = No
i
copy
OFFICE
Hi/DRS
,,l
Rl/DRS,
j l
Rl/DRP Q ls
l
l
NAME
JYerokunQ "f
EKelly WN
CCowgillQ }) W
DATE
08/11/98
/
08j7098
08Q98' (F
08/ /98
08/ /98
OFFICIAL RECORD COPY
l
l
l