7.
5&L.293
,. yey y
t UNITED ST/.TES j
NUCLEAR REGULATORY COMMISSION
's y
f WASHINGTON, D.C. 30006 4001
-,,...../
August 21, 1998 Mr. Leon J. Olivier Vice President - Nuclear / Station Director Boston Edison Company Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road Plymouth, MA 02360
SUBJECT:
PILGRIM NUCLEAR POWER STATION DESIGN INSPECTION
Dear Mr. Olivier:
During the time period of September 28 through October 23,1998, the NRC has scheduled a
' design inspection of the Pilgrim Nuclear Power Station. The Boston Edison Company (BECo) has indicated that there are no major conflicts with onsite activities during this period. Per BECo's request, risk insight as well as BECo's ongoing design basis reviews were considered in the system selection process. We will contact BECo to request material needed to support the on-site and off site reviews. The team leader and another member of the team are scheduled to visit the site between September 9 and 10,1998, to identify any additional documentation required for the in-office review and on-site inspection.
Recent NRC inspections at nuclear power reactor facilities have identified numerous findings where the actual plant configuration or operations were inconsistent with the design basis, licensing basis, or the Updated Final Safety Analysis Report (UFSAR). Thus, the purpose of this inspection is to evaluate the capability of the systems to perform safety functions required by their design and licensing bases and to verify consistency of the as built configuration and plant operations with the UFSAR. Inspection Procedure 93801, " Safety System Functional Inspection" will be used to perform the design inspection.
Mr. Morris Branch, Team Leader, NRR, will interface with BECo regarding all matters related to this inspection. The inspection will be performed by a team of NRC and Stone and Webster (S&W) Corporation engineers who have been contracted by the NRC for this purpose.
I l
l
\\o I
- 2. y m x
Ib L bue. ymn y,b cC e LLliom T)\\
,n c
9909260249 990821 PDR ADOCK 05000293 l
G PDR
.m L
N I.
l L. Olivier l We will be in contact with BECo regarding additional details for the inspection. Should you have any questions, please contact Mr. Branch at (301) 415-1279 or myself at (301) 415-2040.
Sincerely, L
original signed tsy Ronald Eaton for Cecil O. Thomas, Director Project Directorate 1-3 Division Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-293 cc: See next page DISTRIBUTION:
Docket File AWang CCowgill, RI PUBLIC TClark MConner NRC Resident inspector H. Miller, RA.
Waxelson ACRS OGC JZwolinski DOCUMENT NAME: G:\\ PILGRIM \\AE.INP
- Previous CONCURRENCE T + receive a copy of this document. Indicate in the box: "C" = Copy without enclosures "E" = Cop'r with enclosures "N" = No copy OFFICE PDI-3.PM E
LA:PDI-3 E
DRPM PECB*
E DRPM.PECB*
E D P$// /
N NAME ABwang pgp TLciark &
MBranch DNorkin CThornasj@
DATE oegime osdise os/issa 08/18s8 osg)ss
- OFFICIAL RECORD COFY
____-----__2----_
Mr. Leon J. Olivi r Bost;n Edison Crmp:ny Pilgrim Nucber Pow:r St1 tion cc:
Mr. Ron Ledgett Mr. Jack Alexander Executive Vice President Manager, Reg. Relations and Quality 800 Boyleston Street Assurance Bostori, MA 02199 Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road Resident inspector Plymouth, MA 02360 U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Mr. David F. Tarantino Post Office Box 867 Nuclear Information Manager Plymouth, MA 02360 Pilgrim Nuclear Power Station RFD #1, Rocky Hill Road Chairman, Board of Selectmen Plymouth, MA 02360 11 Lincoln Street Plymouth, MA 02360 Ms. Kathleen M. O'Toole i
Secretary of Public Safety Chairman, Duxbury Board of Selectmen Executive Office of Public Safety Town Hall One Ashburton Place 878 Tremont Street Boston, MA 02108 Duxbury, MA 02332 Mr. Peter LaPorte, Director Office of the Commissioner Attn: James Muckerheide Massachusetts Department of Massachusetts Emergency Management Environmental Protection Agency One Winter Street 400 Worcester Road Boston, MA 02108 P.O. Box 1496 Framingham, MA 01701-0317 Office of the Attorney General One Ashburton Place Chairman, Citizens Urging 20th Floor Responsible Energy Boston, MA 02108 P.O. Box 2621 Duxbury, MA 02331 Mr. Robert M. Hallisey, Director Radiation Control Program Citizens at Risk Massachusetts Department of P.O. Box 3803 Public Health Plymouth, MA 02361 305 South Street Boston, MA 02130 W.S. Stowe, Esquire Boston Edison Company Regional Administrator, Region 1 800 Boyleston St.,36th Floor U. S. Nuclear Regulatory Commission Boston, MA 02199 475 Allendale Road King of Prussia, PA 19406 Chairman Nuclear Matters Committee Ms. Jane Fleming Town Hall 8 Oceanwood Drive 11 Lincoln Street Duxbury, MA 0233 Plymouth, MA 02360 Mr. James Keyes Mr. William D. Meinert Acting Licensing Division Manager Nuclear Engineer Boston Edison Company Massachusetts Municipal Wholesale 600 Rocky Hill Road Electric Company Plymouth, MA 02360-5599 P.O. Box 426 Ludlow, MA 01056-0426
_ - _ _ _ _ _ _ _ _ _ _ _. _ _ _