ML20237D509

From kanterella
Jump to navigation Jump to search
Expresses Appreciation for Fine Briefing on Plant Operation & Plant Tour During 871118 Visit.Reemphasizes Importance of Performing 10CFR50.59 Analysis & Review for Any Facility Changes
ML20237D509
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 12/16/1987
From: Knighton G
Office of Nuclear Reactor Regulation
To: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
References
NUDOCS 8712230311
Download: ML20237D509 (2)


Text

_ _ _ _ _ __-

December 16 1987 i

0 i

i Docket No. 50-344

~ DISTRIBUTION EDocket File 11 NRC & Local PDRs GKnighton Mr. David W. Cockfield DCrutchfield Vice President, Nuclear GHolahan Portland General Electric Company TChan 121 S.W. Salmon Street JLee Portland Oregon 97204 l

Dear Mr. Cockfield:

I would like to express my appreciation for the fine briefing on plant operation and plant tour that I received during my November 18, 1987 visit to Trojan

+

Nuclear Plant. The depth of knowledge which your staff demonstrated regarding operational history and planned programs within their specific discipline, is an excellent base for Portland General Electric Company's efforts to improve its regulatory, engineering and operational performance. Your staff in attendance should be commended.

During my visit we also had a productive discussion regarding " changes, tests and experiments," described in 10 CFR 50.59. Although differing opinions exist 1

regarding the threshold at which a 10 CFR 50.59 analysis needs to be performed, I want to reemphasize the importance of (1) performing the 50.59 for any changes to the facility and (2) including appropriate analyses and reviews that are conducted to determine whether a proposal or condition requires approval, in accordance with the provision (s) of 10 CFR 50.59(a) prior Consnission (1), as part of l

PGE's formal 10.CFR 50.59 package.

You should be sensitive to the possibility that unreviewed safety questions may in fact exist, despite cc.npliance with the Technical Specifications since the acceptability of the Technical Specifications is based only upon the facility design having received a staff review during licensing and subsequent licensing activities.

i Feel free to call me if I can be of further assistance.

j i

Sincere?v, original signed by George W. Knighton, Director Project Directorate V Division of Reactor Projects - III.

IV, V and Special Projects Office of Nuclear Reactor Regulation

  • See previous concurrence
  • DRSP/PDV
D DV
TChen
GK ton
12/14/87
12/ /87 0FFICIAL RECORD COPY

)

Oh 05000344 871216 i

PDR t

i

w i

1<

Docket'No. 50-344-Mr. David W. Cockfield

'Vice President, Nuclear-Portland General Electric Company 121 S.W. Salmon Street-Protland, Oregon' 97204-

Dear'Mr. Cockfield:

I would like to express my appreciation for the fine briefing on plant operation I recei ed during my November 18, 1987 visit to Trojan N ear. Plant. The 1

knowledge ich your. staff possessed regarding operatic history and planned programs wi i n.their specific discipline,'is a ref1 tion of Portland General Electric. Comp

's efforts to improve its regulato

, engineering and operational performance..Yo taff in attendance should be ommended.

- During my visit we al productive die ssion regarding " changes, tests j

and experiments," or 10 CF D r9.

Altho,

differing opinions exist i

regarding.the' threshold at which C

50.59 analysis needs to be

{

performed, I want to reemphasize the rtance of including analyses and i

reviews'that are conducted to det iine w ether a proposal or condition requires prior Comission appro

, in accorda

= with the provision (s) of 10 CFR 50.59(a)(1), as part PGE's formal 10 CF 59 package, and to be sensitive to the pcssibil that unreviewed safety que ns may in fact exist, despite com)1ia

.with the Technical Specifications o the acceptability of tie echnical Specifications.is based.only upon sues having received a staff re 1ew.

. Feel free to call me if'I can be of further assistance.-

)

Sincerely,

-l George W. Knighton, Director Project Directorate V-Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Pegulation j

' DISTRIBUTION Docket File DMCrutchfield GMHolahan NRC & local PDRs TChan GKnighton JLee OFC :DRSP/

DRSP/D:PDV :ADR/DRSP
DRP/DRSP NAME':TChan ?
GKnighton
GMHolahan
DMCrutchfield i DATE :12/l4 / 7 '
12/ /87
12/ /87
12/ /87

]

0FFICIAL RECORD COPY

!