Fowards Updated Listing of Outstanding Licensing Issues W/ NRC to Which Written Response Expected.Util Prepared to Discuss Mods to Status Repts & Address Any NRC Questions Re Licensing Issues
ML20237D212
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/15/1987
From: Gucwa L
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
SL-3379C, NUDOCS 8712230111
Download: ML20237D212 (6)


Text

. _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _. _ - _ _ _ _ _

Georgra Fbwer Company 333 Piedmont Avenue Atlanta, Georgia 30308 Telephone 404 526 0526 Ma!!ag Address:

Post Office Box 4545 Atlanta, Georgia 30302 L

Georgia Power L T. Gucwa IT u"4"o twcros wm Manager Nuclear Safety

""d '""9 SL-3779c 1857C X7GJ17-H200

}

December 15, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control De!;k Hashington, D. C.

20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 0UTSTANDING LICENSING SUBMITTALS I

Gentlemen:

Enclosed for your information and use, please find updated listings of those items of correspondence with the NRC to which a written response is expected.

Enclosure 1,

tabulated chronologically by Georgia Power Company's submittal date, lists items which are ready for closure. prioritizes the five most significant outstanding submittals in terms of value to Georgia Power Company. is a listing of those items requiring submittal of additional information by Georgia Power.

Georgia Power is prepared to discuss modifications to these status reports and will promptly address any questions you may have regarding these licensing issues.

Sincerely, Y

152 J L. T. Gutwa y

JCJ/lc

Enclosures:

1.

Outstanding Licensing Submittals Requiring NRC Action 2.

Outstanding Licensing Submittals Prioritized List 3.

Outstanding Licensing Submittals Requiring Additional Information c:

(see next page)

\\

p&E2l DOCK 05000321 W

O111 B7121s ^

h PDR

\\ \\

k Georgia Power h U. S. Nuclear Regulatory Commission December 15, 1987 1

Page Two i

c:

Georaia Power Company Mr. J. P. O'Reilly, Sr. Vice President - Nuclear Operations Mr. J. T. Beckham, Jr., Vice President - Plant Hatch GO-NORMS U. S. Nuclear Regulatory Commission. Washington. D A Mr. L. P. Crocker, Licensing Project Manager - Hatch U. S. Nuclear Recu11 tory Comm.13sion. Region II Dr. J. N. Grace, Regional Administrator Mr. P. Holmes-Ray, Senior Rcsideat Inspector - Hatch

~

1857C 700775

7)

)

GeorgiaPower d ENCLOSURE 1 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 QUl$ LANDING LICEWSING SURilTI6LS_Bf3tjlBING NRC ACTION i

LETTER HATCH DAIE UNII SUMECI Key 0-APPN9 VAL OF ITEM REQUIRED FOR UPCOMING OUTAGE C-NRC 4CTI6N COMPLETE ON ITEM SINCE LAST REPORT s

N-ITEM ADDED SINt'E LAST REPORT l'

l 05/13/85 321,366 RE0142ST FOR ADDITIONA.L INFORMATION - SEISMIC SPCTRA BROADENING 01/06/86 366 PROPOSED CHANGE TO TECHNICAL SPECIFICATI0fiS -

DELETE REQUIREE NT FOR HYDR 0 GEN RECOMBINERS 01/06/86 321,366 C

FRCFOSED CHANGE TO TECHNICAL SPECIFICATIONS -

ALLOH OPERATING MRSFUNEl. TO HORK 12-HOUR SHIFTS 02/28/86 321,366 PROPOSED LICENSE EniNSION T0i 40 YEARS FROM OPERATING LICENSE VICE CONSTRUC; ION PERMIT 03/27/86 321,366

. PROPOSED CHANGE '70 TECHNICAL SPECIFICATIONS -

EQUALIZING REACTOR PROTECTION LYSTEM SPECIFICATIONS BETHEEN UNITS 09/09/86 321,366 CHANGE TO TECHNICAL SPECIFICATIONS - RIVER LEVEL l

10/24/86 321,366 PROF 0 SED TECHNICAL SPECIFICATION CHATGi FOR l

FIRE PROTECTION COMPLIANC.: - ADD REQUIREMENT OF PER/ORMING EVERY TH199 TEST OF EOUTPMENT CONTROLLED FROM REMOTE SHUTDOWN PMEL9 Fh(';M SAID PANELS 11/14/86 321,366

RESPONSE

TO VfRBAL1 REQUEST FOR ADDITIONAL INFORMATION - CA'LE TRAY SUPPORTS 12/23/86 321,366 DETAILED CONTROL ROOM DESIGN REVIEW 02/13/87 321,366 REQUEST TO REVISE REPORTING REQUIRihENT TECHNICAL 2 SPECIFICATIONS TO FIT LICENSEE EVENT REPORT REQUIREMENTS 1857C El-1 12/15/87 SL-3779 roo773

't I

c.,

e

,1 I

i s

l 7

4 4:

y GeorgiaPowerd

[

^

ENCLOSURE 1 (Continued) i-

,1

',[

QUISTANDING LICENSING S(BMITTALS REOUIRING FC ACTI93

'O

/

lei 1ER HATCH RA_TI UNIT SUBJECT T

03/04/87

-321.,366

/

REQUEST TR ADDITIONAL INFORMATION SEISMIC S0IL ANALYSI.S 03/20/87 366 PROPOSFD CHkNGE TO TECHNICAL SPECIFICATIONS -

HYDROGfN' WATER CHEMISTRY 05/01/87 321,366 Pr5 POSED CHA\\GE TO TECHNIC /i SPECIFICATIONS -

GASEOUS EFFLUENT RELEASE FOIN,IS 07/13/87 321 PROPOSED CHANGE TO TECHNICAL' SPECIFICATIONS -

L ELECTRICAL SURVEILLANCE INTERVAL

09/22/87 366 0

PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

STANDBY LIQUID CONTROL SYSTEM 00ERATION USING f

ENRICHED SODIUM PENTABORATE 10/08/87 121,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

FUZL THERMAL LIMITS AND ECCS REQUIREMENTS

-l S

I e

3 1867C El-2 12/15/87 SL-3779 im

q ~

u r

4 7

o

,l.GeorgiaPower A fi

(

Y ENCLOSURE 2 PLANT HATCH - UNITS 1, 2 i

NRC DOCKETS 50-321, 50-366 x

OPERATING LICENSES DPR-57, NPF-5 i

'J QUTSTAHDING LICENSING SUBMITTALS PRIORITIZED LIST r

4

'A REASOl SUBJECT FOR PlLQR_III

^

'?.

Preclude Potential PROPOSED CHANGE TO TECHNICAL

)

Future Problems SPECIFICATIONS - RIVER LEVEL 1

2; Rhrdware Installed PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - HYDR 0 GEN HATER CHEMISTRY

@;f L Unr.ecessary Plant PROPOSED CHANGE TO TECHNICAL Shutdown - Permit SPECIFICATIONS -

18 month cycles ELECTRICAL SURVEILLANCE INTERVAL 4.

NRC SER has been issued PROPOSED CHANGE TO TECHNICAL on Generic Topical SPECIFICATIONS - EQUALIZING REACTOR O

Report-PROTECTION SYSTEM SPECIFICATIONS BETHEEN' y

UNITS 5.

System-Hansgement PROPOSED LICENSE EXTENSION TO 40 YEARS FROM 4>.

Planning OPERATING LICENSE VICE CONSTRUCTION PERMIT Note: Sulwittal dates are listed on Enclosure 1.

a

)

l

.-)

  • f, 1857C E2-1 12/15/87 SL-3779 700775

1 Cleorgia Pcnver abL ENCLOSURE 3 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 0UTSTANDING LICENSING SBBMITTALS REOUIRING ADDITIONAL INFORMATION 1

I LETTER HATCH I

QAIE UN11 SUBJECT 06/25/85 321,366 PROPOSED CHANGES TO IST PROGRAM 07/17/86 321,366 REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATION AMENDMENT TO GASE0US EFFLUENT RELEASE POINTS VERBAL 321,366 REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED TECHNICAL SPECIFICATION CHANGE TO RPS INSTRUMENTATION SURVEILLANCE FREQUENCY VERBAL 321,366 REQUEST FOR ADDITIONAL INFORMATION(ON REGARDING PROPOSED TECHNICAL SPECIFICATION CHANGE TO RIVER LEVEL - ADD THROTTLING REQUIREMENT FOR PSH PUMPS AT LOW RIVER LEVELS 1857C E3-1 12/15/87 SL-3779 7m776

_ _ _ _ _