Forwards Insp Rept 50-333/98-03 on 980601-0712.No Violations Noted.Performance at Facility Appropriately Focused on Safety.Equipment Failures Identified & Includes Rod Position Info Power Supply Failure
ML20237C941
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/18/1998
From: David Lew
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Michael Colomb
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20237C943 List:
References
50-333-98-03, 50-333-98-3, NUDOCS 9808240259
Download: ML20237C941 (3)


See also: IR 05000333/1998003

Text

- _ _ _ _ _ _ _ - - - _ _ _ _ _ - _ - _

t

August 18, 1998

Mr. Michael J. Colomb

Site Executive Officer

New York Power Authority

James A. FitzPatrick Nuclear Power Plant-

' Post Office Box 41

Lycoming, NY 13093

SUBJECT:

NRC INTEGRATED INSPECTION 50-333/98-03

Dear Mr. Colomb:

On July 12,1998,the NRC completed an inspection at the James A. FitzPatrick Power

Plant. The enclosed report presents the results of that inspection.

During the 6-week period covered by this inspection, performance at the James A.

FitzPatrick reactor facility was appropriately focused on safety. Your staff responded

appropriately to a number of equipment failures. However, we noted a recent increase in

equipment failures that impacted plant operations. As documented in the enclosed

inspection report and NRC inspection report 50-333/98-02,some of these equipment

failures were preventable, and were caused by improper maintenance or ineffective

preventive maintenance. The f ailures included the rod position information power supply

failure, turbine bypass valve degradation and scram discharge instrument drain and vent

valve degradation. Your immediate corrective actions to the individual equipment failures

were adequate, and your current efforts to review potential broader implications of the

equipment failures are appropriate,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room.

Sincerely,

-

Original Signed by:

David C. Lew, Chief

Projects Branch 2A

Division of Reactor Projects

l

Docket No.: 50-333

License No.: DPR-59

\\

\\

Enclosure: Inspection Report 50-333/98-03 -

,

9008240259 980818

png

ADOCK 05000333

PDR

C

e

j.

0FFICIAL RECORD COPY

IE:01

I

E

_ - _ - _ - _ _-

- - _ _ . _ _ - _

_ _ - - - _ _ _ _ . . _ _

f7

't

' s*

l^

!

l

Michael J. Colomb

2

'

cc w/ encl:

C. D. Rappleyea, Chairman and Chief Executive Officer

j'

E. Zeltmann, President and Chief Operating Officer

'

R. Hiney, Executive Vice President for Project Operations

J. Knubel, Chief Nuclear Officer and Senior Vice President

H. P. Salmon, Jr.,'Vice President of Engineering

W.~Josiger, Vice. President - Engineering and Project Management .

'

J. Kelly, Director - Regulatory Affairs and Special Projects

j-

.T.; Dougherty, Vice President - Nuclear Engineering

R. Deasy, Vice President .- Appraisal and Compliance Services

- R. Patch, Director - Quality Assurance .

G. C. Goldstein, Assistant General Counsel

C. D. Faison, Director, Nuclear Licensing, NYPA

7

K. Peters, Licensing Manager

T. Morra, Executive Chair, Four County Nuclear Safety Committee

Supervisor, Town of Scriba

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

P. Eddy, Electric Division, Department of Public Service, State of New York

,

G. T. Goering, Consultant, New York Power Authority

_

J. E. Gagliardo, Consultant, New York Power Authority

E. S. Beckjord, Consultant, New York Power Authority

F. William Valentino, President, New York State Energy Research

and Development Authority

,

J. Spath, Program Director, New York State Energy Research

and Development Authority

l

,

I

[:

i

-

__ __ _ __ _j

_ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ - _

-1

/

1

Michael J. Colomb

3

Distribution w/ encl:

H. Miller, RA/W. Axelson, DRA (1)

Nuclear Safety Information Center (NSIC)

PUBLIC

NRC Resident inspector

Region i Docket Room (with concurrences)

D. Lew, DRP

J. Rogge, DRP

P. Kaufman, DRP

R. Junod, DRP

Distribution w/ encl: (VIA E-MAIL)

B. McCabe, RI EDO Coordinator

S. Bajwa, NRR

J. Williams, NRR

M. Campion, RI

Inspection Program Branch, NRR (IPAS)-

R. Correia,' NRR

F. Talbot, NRR

DOCDESK

,

l

DOCUMENT NAME: G:\\ BRANCH 2A\\FITZ9803. INS

To recri a a copy of this document, indicate in the box: "C" = Copy without

attachuant/ enclosure

"E" = Copy with attachment / enclosure

"N" = No copy

OFFICE

Rl/DRP

Rl/DRP

l

NAME

GHunegs g(- pn

DLew &

OATE

08/g /98

0843/98

OFFICIAL RECORD COPY

l