ML20237C632

From kanterella
Jump to navigation Jump to search
Confirms 880111-15 NRC Environ Qualification Insp of Electrical & Instrumentation Equipment at Facilities.Listed Documents Required from Licensee No Later than 880104
ML20237C632
Person / Time
Site: Byron  
Issue date: 12/18/1987
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8712220044
Download: ML20237C632 (3)


Text

i i

7 I

l DEC 181987 1

Docket No. 50-454 Docket No. 50-455 Commonwealth Edison Company ATTN:

Mr. Cordell Reed Senior Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

SUBJECT:

EQUIPMENT QUALIFICATION INSPECTION - BYRON NUCLEAR PLANT This letter confirms the dates of January 11 through 15, 1988, for the NRC Environmental Qualification (EQ) Inspection of electrical and instrumentation equipment, at the Byron Station, Units 1 and 2.

These dates were established during a December 11, 1987, telephone conversation between Mr. S. Hunsader of your staff and Mr. A. S. Gautam of my staff. The inspection will be performeo by a six member inspection team with Mr. A. S. Gautam of the Region III office as lead inspector.

The following areas will be inspected:

Implementation of corrective action commitments addressed in the final Byron EQ Safety Evaluation Report.

Compliance to EQ regulations of 10 CFR 50.49, including Program Procedures, Master Equipment List, Maintenance, Procurement, Upgrading of Replacement Equipment, Quality Assurance and Employee Training.

Adequacy of equipment qualification files, including responses to relevant NRC Information Notices and Bulletins.

Installation and maintenance of selected plant EQ equipment.

A management entrance meeting is scheduled for 2:00 p.m. on January 11, 1988, at the plant site. A plant walkdown inspection of selected EQ equipment is scheduled for January 13, 1988, and an NRC exit meeting is scheduled for 11:00 a.m. on January 15, 1988. To facilitate NRC preparation for this inspection your staff has been requested to submit the following EQ documents no later than January 4, 1988.

1.

Licensee's response to Generic Letter 84-24 (D. G. Eisenhut to licensees and applicants dated December 27, 1984;

Subject:

Certification of Compliance to 10 CFR 50.49).

87122g[g I 1p pa ne

y s-~

m%

DEC 181987 Commonwealth Edison Company 2

2.

a)-

Master List, version in effect at the time of the inspection.

b)

Licensee's current System Component Evaluation Worksheets (SCEW Sheets).

3.

Licensee's procedures applicable to EQ (EQ Program, procurement of qualified equipment, maintenance of. qualified equipment, and modifications to plant that could affect qualified equipment).

4.

Final NRC EQ SER = including Regulatory Guide 1.97 SER issued to the plant, and any appropriate licensee responses to the SER'.s.

The licensee is requested to make a presentation at the entrance meeting to address:

a.-

Organization Chart with EQ applicability.

- b.

Overview of-EQ Program.

i c.

Overview of EQ documentation file organization such as how files address meeting EQ criteria (10 CFR 50.49, DOR, NURGE 0588), instrument accuracy, and submergence.

d.

Arrangements for. plant walkdown (the NRC team leader will identify i

selected equipment samples at the entrance).

- Your cooperation with us during this inspection will be appreciated.

In particular please arrange to have all inspectors escorted as visitors to avoid l

delays due to formal radiation training.

Should you have any questions regarding this inspection, please contact Mr. R. N. Gardner at (312) 790-5524 l

or Mr. A. S. Gautam at (312) 790-5523.

i Sincerely, j

i l

L.'SGIHAl 5!DNED BY HDBEAT J. f,HREa j

Hubert J. Miller, Director l

Division of Reactor Safety j

i See Attached Distribution g/G II RII I

RI RIII-Aser R'M w

A Gautam/ib Gardner f4Hin s Harriyon 1 iss6timos 1

'11l 8 '

\\W l2/Iyg7 altil8 jh9 l

.~

A Commonwealth Edison Company 3

DEC 181987 Distribution cc w/ enclosure:

T. J. Maiman, Vice President, PWR Operations D. Butterfield, Nuclear Licensing Manager R. E. Querio, Plant Manager DCD/DCB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Byron Resident Inspector, RIII Braidwooa D. W. Cassel, Jr., Esq.

Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division Diane Chavez, DAARE/ SAFE L. Olshan, NRR LPM H. S. Taylor, Quality Assurance Division U. Potapovs, VPB, NRR