ML20237C576
| ML20237C576 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 12/15/1987 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20237C578 | List: |
| References | |
| NUDOCS 8712220006 | |
| Download: ML20237C576 (2) | |
See also: IR 05000267/1987033
Text
-
_ _ _ _ _ _ _ _ _
_ _ _ _
,
!l
!
DEC 151987
,
In Reply Refer To:
Docket:
50-267/87-33
_ . . _ . . .
Public Service. Company of Colorado
ATTN:
Robert 0. Williams, Jr.
Vice President, Nuclear Operations
en er,
rd
52
],
Gentlemen:
This refers to the inspection conducted by Mr. G. A. Pick of this office during
the period November 16-20, 1987, of activities authorized by NRC Operating
License DPR-34 for the Fort St. Vrain Nuclear Generating Station, and to the
discussion of our findings with members of your staff at the conclusion of the
inspection.
-
Areas examined during the inspection included the activities of the onsite and
offsite review committees.
Within these areas, the inspection consisted of
,
selective examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspector.
The inspection findings are
documented in the enclosed inspection report.
4
Within the scope of the inspection, no violations or deviations were
identified.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed By
A.D. Beach
L. J. Callan, Dirc.-tar
Division of Reactw Projects
Enclosure:
Appendix
NRC Inspection Report
50-267/87-33
k
cc:
(see next page)
-
f
/
RIV:RI */
C:0P
t, C:PSB
C:0 i
.M
,9
D:
g
GAPick;dfj
WCSeidle TFWesterman
JE gliardo
LMi
can LJ a lan
'
h1/cf/87
IL/cg/87
l4/87
,yj*/87
lit /87
lZ /sp/87
I
Reconcur
WCSeidl'g .
Q22$$DCK h h67
I
06
O
.._
/A /6 /87
DR
O
'
.
-
__
_ _ - _ - - - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _
_ _ _
_ _ _ - - - _ _
- .l.(o ,
Public Service Company of Colorado
.-2-
cc w/ enclosure:
Fort St. Vrain Nuclear Station
Manager, Nuclear Production Division
,
16805 WCR 19
Platteville, Colorado
80651
Fort St. Vrain Nuclear Station
P. Tomlinson, Manager, Quality
Assurance Division
(same address)
Colorado Radiation Control Program Director
Colorado Public Utilities Commission
bec to DMB (IE01)
bec distrib. by RIV:
- RRI
R. D. Martin, RA
- Section Chief (DRP/B)
- Project Engineer, DRP/B
RPSB-DRSS
- Lisa Shea, RM/ALF
- MIS System
- RSTS Operator
- K. Heitner, NRR Project Manager
- RIV File
- R. Hall
- DRS
- TSS
- DRP
D. Powers
- G. Pick
I
- w/766
l
l
l
e
i
l
l
I
l
s