e* R'o
/p vg'o, UNITED STATES
["
~j NUCLEAR REGULATORY COMMISSION g
- E WASHINGTON, D. C. 20555 DETROIT EDISON COMPANY WOLVERINE POWER SUPPLY COOPERATIVE, INCORPORATED DOCKET NO. 50-341 FERMI-2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 12 License No. NPF-43 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the Detroit Edison Company (the i
licensee) dated January 28, 1987, as superseded May 26, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the I
Commission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be_ conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, Paragraph 2.C.(10) of Facility Operating License No. NPF-43 is hereby amended to read as follows:
Emergency Diesel Generator (EDG) Engine Special Inspection Program (a) DECO shall perform gap checks on each EDG engine main bearing within seven days following every automatic, unprelubricated engine start, or every six months, whichever occurs first.
The six month check must be performed within six weeks of the six month interval due date.
The plant shall be in the appropriate Technical Specifications LC0 if the window of test performance is exceeded.
g7ja2 Q2 g h h l
D P
P
~
.g.
l.
(b) DECO shall obtain and analyze, once each month, an i
engine lube oil sample,from each EDG except when an l
.EDG is unavailable for service.
Should each of two l
consecutive samples' analyzed identify foreign I
matter / deposits which exceed DECO established limits and which could degrade crankshaft bearing performance, i
DECO shall inform the NRC immediately and, within 15 working days following such notification, submit a report _of analysis results and the detailed corrective action to be taken.
1 3.
This amendment is effective as of the date of issuance.
FOR THE NUCLEAR' REGULATORY COMMISSION
' Martin J.'Virgilio, Director Project Directorate III-1 Division of Reactor Projects - III, IV, V
& Special Projects l
Date of Issuance: December I6, 1987 1