ML20237B743

From kanterella
Jump to navigation Jump to search
Confirms Enforcement Conference on 871222 in Glen Ellyn,Il to Discuss Two Violations of 10CFR50.59 & Inadequate Design of LPCI Electrical Swing Bus,Per 871210 Telcon
ML20237B743
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/11/1987
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sylvia B
DETROIT EDISON CO.
Shared Package
ML20237B745 List:
References
NUDOCS 8712170110
Download: ML20237B743 (1)


Text

I p

p**80eq UNITED $T ATES

  • 8 NUCLEAR REGULATORY COMM!sslON i

f S

REClON lil 1

. 7.

8 fee noostvrLt noAo I

CLEN ELLYN, ILLINOl5 60l37 s *... *.-

1 DEC 11 1987 i

Docket No. 50-341 I

The Detroit Edison Company J

ATTH:

B. Ralph Sylvia Group Vice President.

Nuclear Operations 6400 North Dixie Highway

{

Newport, M1 48166 i

Gentlemen:

1 This confinns our plans as discussed on December 10, 1987, between you and myself to conduct an Enforcement Conference at 10:00 a.m., (CST) on Tuesday, December 22, 1987, at the Region 111 Office in Glen Ellyn, Illinois. The i

coiference is to discuss (1) violation of 10 CFR 50.59 on two separate occasions when t'se feedwater heaters and meisture separator reheaters were removed from service; and (2) inadequate design of the low pressure coolant I

injection electrical swing bus.

We will gladly discuss any questions you may have concerning this matter.

Sincerely, i

)

k Edward G. Greenman, Deputy Director

\\

Division of Reactor Projects cc w/ enclosure:

Patricia Anthony, Licensing P. A. Marquardt, Corporate Legal Department DCD/DCB (RIDS)

Licensingdee Management Branch Resident inspector, R111 Ronald Callen, Michigan Public Service Connission Harry H. Voight, Esq.

Michigan Department of Public Health i

Honroe County Office of I

Civil Preparedness l

J. Lieberman, OE l

J. Taylor, DEDRO T. Murley, NRR l

/

8 9

f,6.e1217o110 871211

-coees, m

u

_