ML20237B684

From kanterella
Jump to navigation Jump to search
Forwards First Page of Attachment 10-1 Inadvertently Omitted from Applicant Responses to New England Coalition on Nuclear Pollution First Set of Interrogatories & Request for Documents Re Contentions I.V & Iv.Related Correspondence
ML20237B684
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 12/10/1987
From: Selleck K
PUBLIC SERVICE CO. OF NEW HAMPSHIRE, ROPES & GRAY
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
CON-#487-5076 OL-1, NUDOCS 8712170056
Download: ML20237B684 (4)


Text

--

6676?

1 RELATED. CORRESPOND,WSMi j

i R O P E s & G R AY a q q,-

22S FRANKLIN STREET UWr L 1

BOSTON, MASSACHUSETTS O2110 I

< e ma3-eioo 87 DEC 15 P2 40

'~*^'"'~o'o~

.N.RumNu 30

  • E NNEDY PLAZ A TELEX NUMBER 940519 ROPGRALCR BSN IO OI TWE NTY-5 ECON D STR E ET, N W PROviOE NCE, R l 02 903 TELE A NUM8ER 95t973 ROPES GRAY BSN WASHINGTON. O C 20037

{

hhhg f

(202 42 9-'e 0 0

<400 s2 '-e 4 0 0 T E tE c O p1E Rs isi7, 4 2 3-2 377 tei71423 7e CPIER (202) 429-1629 TE LECOPIE R (4 011 5 2 f-09 :0 INTERNATIONAL'<617) 423-6905 ggdgk December 10, 1987 l

Office of the Secretary U.S.

Nuclear Regulatory Commission Washington, D.C.

20555 ATTENTION:

Docketing and Service Branch l

Re:

Public Service Company of New Hampshire, et al.

Docket Nos. 50-443-OL-1 & 50-444-OL-1

Dear Sir:

i It has come to our attention that the first page of 0-1 was inadvertently omitted from " Applicants' Responses to New England Coalition on Nuclear Pollution's First Set of Interrogatories and Request for Production of Documents to Applicants on NECNP Contentions I.V.

and IV."

Enclosed is one original and two copies of the missing page.

i Very truly yours, I

Kath yn A.

Selleck KAS/ajp Enclosures cc:

Service List f

k ADO G

35d

s I

1 ATTACRMENT 10-1 1.

Final Environmental Statement related to the ptoposed Seabrook Station Units 1 and 2, PSNH; U.S. Atomic Energy Commission Directorate of Licensing; December 1974; Docket Nos. 50-44 3 and 50-4 44, 2.

Seabrook Station Environmental Report - Operational License Stage, Public Service Company of New Hampshire; as revised.

l f

3.

Seabrook Station Environmental Report - Construction Permi t Stage, ?ublic Service Company of New Hampshire; as revised.

4 Final Envi ronmental Statement related to the operation of Seabrook Stations Units 1 and 2; PSNH, etal.; U. S. Nuclear Regulatory Commission; December 1982; NUREG-0895.

)

5.

Seabrook Station Pinal Saf ety Analysis Report; Public Service Company of New Hampshire; as amended.

6.

Seabrook Station National Pollutant Discharge and Elimination System (NPDMS) Pernic No. NH0020338; dated July 26, 1985.

7.

Normandeau Associaten, Inc. 197 7 Summa ry do cume n t :

Assenscent of Anticipated Impacts of Construction and operation of Seabrock Station on the estarine, coastal and offshore waters of Hampton -

Seabrook, Now Hampshire.

1 8.

Normandeau Associates, Inc. 1985; Seabrook Environtnental Studies, 1984. A Characterization of Baneline Conditions in the Hampton -

Seabrook Area, 1975-1984 Technical Report XVI-II.

9.

Normadeau Associates, Inc.,1987; Seabrook Environmental Studies,

1986. A Characterization of Baseline Conditions in the Hampton -

Seabrook Area, 1975-1986.

A Preoperational Study for Seabrook Station, Technical Report XVIII-II.

10.

Bayne, B. L., ed. (197 6).

Marine Mussels - their ecology and physiology.

Cambridge University Press, l

11.

Laogenated Hydrocarbon Production and the Potential of Bio-accumulation at Seabrook Station; K. W. Dow, February 1987; YAEC - 1576.

12.

USNRC Letter, dated April 10, 1981, "IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety System Components by Corbicula sp. (Asiatic Clam) and Mytilus sp. (Mussel)", B. H.

Grier to W. C. Tallman.

13.

PSNH Letter, dated July 8,1981, " Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety System Components by Corbicula sp. (Asiatic Clam) and Mytilus sp. (Mussel)", J.

Devincentis to B. H. Grier.

i f

i ATTACHMENT 10-1 1.

Final Environmental Statement related to the proposed Seabrook Station Units 1 and 2, PSNH; U.S. Atomic Energy Commission Directorate of Licensing; December 1974; Docket Nos. 50-443 and 50-444.

2.

Seabrook Station Environmental Report - Operational License

)

Stage, Public Service Company of New Hampshire; as revised.

j l

1 3.

Seabrook Station Environmental Report - Construction Permit Stage, Public Service Company of New Hampshire; as revised.

4.

Final Environmental Statement related to the operation of Seabrook l

Stations Units 1 and 2; PSNH, etal.; U. S. Nuclear Regulatory l

Commission; December 1982; NUREG-0895.

5.

Seabrook Station Final Safety Analysis Report; Public Service Company of New Hampshire; as amended, f

6.

Seabrook Station National Pollutant Discharge and Elimination System (NPDKS) Permit No. NH0020338; dated July 26, 1985.

7.

Normandeau Associates, Inc.1977 Summary documenti As s es sme n t j

of Anticipated Impacts of Construction and Operation of Seabrook Station on the estarine, coastal and offshore waters of Hampton -

Seabrook, New Hampshire.

8.

Normandeau Associates, Inc. 1985; Seabrook Environmental Studies, 1

1984 A Characterization of Baseline Conditions in the Hampton -

l Seabrook Area, 1975-1984 Technical Report XVI-II.

9.

Normadeau Associates, Inc.,1987; Seabrook Environmental Studies,

1986.

A Characterization of Baseline Conditions in the Hampton -

I Seabrook Area, 1975-1986. A Preoperational Study for Seabrook Station, Technical Report XVIII-II.

10.

Bayne, B. L., ed. (197 6).

Marine Mussels - their ocology and physiology.

Cambridge University Press.

11.

Laogenated Hydrocarbon Production and the Potential of Bio-accumulation at Seabrook Station; K. W. Dow, February 1987; YAEC - 1576.

12.

USNRC Letter, dated April 10, 1981, "IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety System Components by Corbicula sp. (Asiatic Clam) and Mytilus sp. (Mussel)", B. H.

Grier to W. C. Tallman.

13.

PSNH Letter, dated July 8, 1961, " Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety System Components by Corbicula sp. (Asiatic Clam) and Mytilus sp. (Mussel)", J.

Devincentis to B. H. Grier.

ATTACRMENT 10-1 1.

Final Environmental Statement related to the proposed Seabrook Station Units 1 and 2, PSNH; U.S. Atomic Energy Conmission Directorate of Licensing; December 1974; Docket Nos. 50-443 and 50-444, 2.

Seabrook Station Environmental Report - Operational License Stage, Public Service Company of New Hampshire; as revised.

3.

Seabrook Station Environmental Report - Construction Formit Stage, Public Service Company of New Hampshire; as revised.

4.

Final Environmental Statement related to the operation of Seabrook Stations Unite 1 and 2; PSNH, etal.; U. S. Nuclear Regulatory i

Commission; December 1982; NUREG-U895.

3.

Seabrook Station Pinal Saf ety Analysis Report; Public Service Company of New Hampshire; as amended.

6.

Seabrook Station National Pollutant Discharge and Elimination System (NPDES) Permit No. NH0020338; dated July 26, 1985.

7.

Normandeau Associates, Inc.1977 Summary document:

As s es s ment of Anticipated Impacts of Construction and Operation of Seabrook Station on the estarine, coastal and offshore waters of Hampton -

Seabrook, New Hampshire.

i 8.

Normandeau Associates, Inc.1985; Seabrook Environmental Studies, 1984 A Characterization of Baseline Conditions in the Hampton -

Seabrook Area, 1975-1984 Technical Report XVI-II.

9.

Normadeau Associates, Inc.,1987; Seabrook Environmental Studies,

1986. A Characterization of Baseline Conditions in the Hampton -

Seabrook Area, 1975-1986 A preoperational Study for Seabrook Station, Technical Report XVIII-II.

10.

Bayne, B.

L., ed. (1976). Marine Mussels - their ecology and physiology.

Cambridge University Press.

11.

Laogenated Hydrocarbon Production and the Potential of Bio-accumulation at Seabrook Station; K. W. Dow, February 1987; YAEC - 1576.

i 12.

USNRC Letter, dated April 10, 1981, "IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety System Components by Corbicula sp. (Asiatic Clam) and Mytilus sp. (Mussel)", B. H.

Grier to W. C. Tallman.

13.

PSNH Letter, dated July 8,1981, " Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety System Components by Corbicula sp. (Asiatic Clam) and Mytilus sp. (Mussel)", J.

Devincentis to B. H. Grier.

-