ML20203B659

From kanterella
Jump to navigation Jump to search
Provides twenty-eighth Update of Big Rock Point Integrated Plan.Operating License & Tech Specs for Defueled Configuration Being Reviewed by Nrc,Currently
ML20203B659
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 02/13/1998
From: Rang J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9802240382
Download: ML20203B659 (1)


Text

..

,s.

i A CMS Eregy Conyuny Bg M hwt Wieu f%nt K***** ! hN**'t 10X9 l&31 Ncsth Site General Marwper j

Ctwsw. w tgra February 13, 1998 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 - 0001 BIG ROCK POINT PLANT - INTEGRATED DOCKET 50-155 - LICENSE DPR-6 PLAN SEMI-ANNUAL UPDATE NTTMBER 2 8.

As required by the Big Rock Point Operating License, this letter provides the twenty-eighth pdate of the Big Rock Point Integrated Plan. There have oeen no changes to the Integrated Plan since the last update. On August 28, 1997, Semi-Annual Update Number 27 was forwarded to the Nuclear Regulatory Commission.

The letter stated that the twenty-seventh update would also be the final update of the Integrated Plan because Consumers Energy Company had decided to cease permanent operation of the facility, and that a change to the Operating License, along with the Technical Specifications was being prepared to delete the Integrated Plan to reflect a defueled plant configuration. Currently, the Operating License and Technical Specifications for the defueled configuration are being reviewed by the Nuclear Regulatory Commission.

\\

- ~.

W x%

ames S Rank k Business, Reg Watory and Administrative Manager CC:

Administrator, Region III, USNRC NRC Resident Inspector - Big Rock Point-NRR Project Manager - OWFN j'l["f. l.l['h. f)l'elfll"h' 9802240382 980213 DR ADOCK 050001S5 i