Forwards Insp Rept 50-458/87-28 on 871001-21.Enforcement Conference Scheduled on 871214 in Region IV to Discuss Apparent Violations,Reasons for Occurrence & Corrective Actions
ML20237A809
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/07/1987
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
Shared Package
ML20237A811 List:
References
EA-87-229, NUDOCS 8712150278
Download: ML20237A809 (2)


See also: IR 05000458/1987028

Text

.

.

I

In Reply Refer To:

E

7 27

Docket:

50-458/87-28

EA 87-229

Gulf States Utilities

ATTN: Mr. James C. Deddens

Senior Vice President, (RBNG)

Nuclear Licensing

P. O. Box 220

St. Francisville, LA 70775

Gentlemen:

This refers to the inspection conducted by Messrs. D. D. Chamberlain and

W. B. Jones of this office during the period November 1-21, 1987, of activities

authorized by NRC Operating License NPF-47 for the River Bend Station, and to

the discussion of our findings with you and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included review of the licensee identified

problem with a misaligned instrument root valve, surveillance test observation,

maintenance observation, safety system walkdown and operational safety

verification.

Within these areas, the inspection consisted of selective

I

examination of procedures and representative records, interviews with personnel,

and observations by the NRC inspectors. The inspection findings are documented

in the enclosed inspection report.

!

During this inspection, it was found that certain of your activities appeared to

be in violation of NRC requirements. As dicussed in our telephone conversation

of December 2,1987 with you, we have scheduled an enforcement conference

in our office at 10:00 a.m. on December 14, 1987 to discuss your

understanding of these apparent violations, the reasons for occurrence, and your

corrective actions. We will also discuss the Enforcement Policy, if appropriate.

An agenda for this meeting is enclosed.

j

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items are identified in

paragraph 3 of the enclosed report.

Sincerely,

Origina; Q ned By

3

871215027e 871207

l 1 Catan

PDR

ADOCK 05000458

G

PDR

L. J. Callan, Director

Division of Reactor Projects

Enclosure:

(see next page)

RIV:SRlh

RIgg

AC:PS/qhus

E0h

D:DRP @

f\\

DDChamb'erlain/tw

WJones

GLMadsen

DAPowers

LJCallan

a /3 /87

A /.7/87

/ 2 /o /87

s/g/87

/ 2./ g /87

{ (; 7

J

-

_ _ _ _ _ _ _ _ - _ _ _ .

,

,

Gulf States Utilities

-2-

Enclosure:

Appendix - NRC Inspection Report

50-458/87-28

cc w/ enclosure:

Gulf States Utilities

ATTN:

J. E. Booker, Manager-

River Bend Oversight

P. O. Box 2951

Beaumont, Texas 77704

Louisiana State University,

Government Documents Department

Louisiana Radiation Control Program Director

bec to DM8 (IE01)

bec distrib. by RIV:

  • DRP
  • Resident Inspector

R. D. Martin, RA

  • Section Chief (DRP/C)
  • Lisa Shea, RM/ALF
  • MIS System

RPSB-DRSS

  • RSTS Operator
  • Project Engineer, DRP/C
  • RIV File

,

  • W. Paulson, NRR Project Manager
  • R. Hall

l

  • DRS
  • TSS
  • D.

Powers

  • w/766

!

i

i

l

,

.