Submits four-year Simulator Certification Rept,Iaw 10CFR 55.45(b)(5)(ii) & (b)(5)(vi).Rept Contains No Uncorrected Performance Test Failures Nor Have Tests Previously Administered Changed Since Initial Certification Submittal
ML20237A779
Person / Time
Site: Comanche Peak  
Issue date: 08/10/1998
From: Terry C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC (Affiliation Not Assigned)
References
TXX-98184, NUDOCS 9808170098
Download: ML20237A779 (15)


Text

_ _ _ _

l

/

llllllllll7 "."-".

""" 7 1

.~*

Log # TXX 98184 r

Z File # 10305 7UELECTRIC Ref. # 10CFR55.45(b)(5)

August 10, 1998 C. Lance Drry Senior Mce President

& PrincipalNuclear Oficer U. S. Nuclear Regulatory Commission Attn: Director of Nuclear Reactor Regulation Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50 446 TRANSMITTAL OF THE CPSES 4-YEAR CONTROL ROOM SIMULATOR C TTIFICATION REPORT REF:

1) TU Elect:c Letter logged TXX-92166, from William J. Cahill, Jr. to NRC dated April 1, 1992
2) TU Electric hser logged TXX-94214 from William J. Cahill, Jr. to NRC dated August 8, 1994 Gentlemen:

In accordance with the provisions of 10CFR55.45(b)(5)(ii) and (b)(5)(vi).

TV Electric herein submits the four year Simulator Certification Report. As explained in Reference 1 above, this submittal represents the combined four-year certification activities for both Units 1 and 2.

TU Electric's last submittal of this required four-year report was per Reference 2.

There are no uncorrected performance test failures nor have the performance tests previously administered changed since the initial certification submittal. However, modifications to future malfunction tests as submitted with the enclosed NRC Form 474 " Simulation Facility Certification" will be in effect during the next four-year period, with approximately 25 percent of the performance tests administered per year. The simulator certification I

testing schedule remains the same as in Reference 2 except as noted in the enclosed Four Year Malfunction Test Schedule.

If you have any questions on this submittal, please contact Mr. Steve Falley at (254) 897 5343.

j s

_O 9808170098 980810 PDR ADOCK 05000445 P

PDR 1

'sn 4 sV4O COMANCllE PEAK STEAM ELECTRIC STATION P.O. Box 1002 Glen Rose, Tesas 76043 1002

l l

TXX-98184 Page 2 of 2 This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2.

Sincerely.

C. L. Terr By:

~ D. R. Woodlan Docket Licensing Manager CLW/grj Enclosure NRC Form 474 & Simulator Certification Test Schedule l

c-Mr. E. W. Merschoff Region IV (w/o encl)

Mr. John Pellet. Region IV (w/ encl)

Mr. J. I. Tapia. Region IV (w/o encl)

Mr. T. J. Polich NRR (w/o encl)

Document Control-Desk (w/ enc 1)

Resident Inspectors. CPSES (w/o encl) l l

l l

I

s

-..ms, e

e 4=-

s

-e

.s, s.

m

,T

.slMULATION FACILITY CERTIFICATION

.'.'",'*,gt,@,f,,'.ll"." "*"W,,M *gl*p,,llc,,,,,,,,,

ham see.t. *ussenenst oc anses. esme mar not ame ad ausse e es

, one s n

es e meses e, e esmannen a saammen womas 4 absense e assurey.

ings cae emeus saaseer.

gegTRUCTWeg nue tem n 9 to See ter s.ed eWWasen. susuqEast. p meseW1.id der my spaggs e e saundstun W putsansus gespig pen seen eher Weem ameneW gi n..,w,e

,e.me==,-

_ sw man se aspesus n.c. me-a. nemen en masas.

pACRJTY pOUIEET anJesgER 80-445 & 44f Comanche Peak Steam Electric Station Uniec 1 A '>

mu n<rz TU Electric g_p f n. amormet t n. as nonse==mr n===

m.mo e esmanen euer e-ma,, seer w.,s n

e om ame sw m.m.,.

w se een es.s.

2 Deswnenumen a s.nesses Ier estC son.s m sueuemum.th 90 CPR es esM

3. Tties samammen tasmsr meses me possue amemmut h Aesstumes M.9eus er Asessweg 3,s. tem..ua.ned br temC finodmany Onnes tide t

(

we

.e ear encarnous =e menssa.erm emn,cusonanse [ ].a nor.,seseum ses-.

y i

nua,.

-isse LocAnou or saanAnom q P.O. Box 1002, Hwy. 56 - 5 miles north of Glen Rose, Glen Rose, TX 76043-1147 SedVL,afloof erAciLiff PenPoses>NCE TWsf AssTRACTs ATTMssue. pe r_

essm emunnsWis che poser amee ssfr 8e auss arsus esmassemeJ e

oesenenon or,._ _ m m...,.

e. <aans.an y.wmeeswnamesessa a,.sen r; Not Applicable

/

peastAnow FAcufrv psappeansecs Tsevese soHuguta Avemenso arw s men.rer_ _

. sr erpse.aus mas airpeer er sw asse, ear penas y

ce,ueensung use re tasse of siis smesses.eJ l

m, _, + o,. m.,.. To.E - + m

,J See Attached Test Schedule s

/ rentor.4ance TE:Tse PLAN canaes. spor e,-e e ses menay,wi.e.sw.. poem. am.esu

==.s See Attached Changes to the Four Year Malfunction Test Plan i

necenTmeATion loussaw so ses seas. son anunmeans er w messenn men,as emmes

.e ve em asanons emsn eesseursesme ss assesser ** massy se am ween e s.e==e>

Not Applicable e

A., nn.

m. m ant men,ere same et mer a.. ape i. ans w==*e ease i esar weer pensar
  • poper m si.

v.

m e,a an res is m== essest s

se wu - u,,_

.-we Tme,

e p

Vice President of Nuclear Operations er7M m

.. o.,z

- m 985 UsINTE flaff IllMTN SY D,Eaststy M Past90se temene yo y E NRC CPPICE AT*

19006 MMstWLLE Pus pv hsAll AOCstES$sD TO SEEC19R,9ps405 Op **'ru nas gngygg genggiigge US. IsWCLEnst segutATUIIY -

810ENIVE&B. as 11148080819u, DC EISB6dBM

~ - ~

'tM

k 1

l Changes to the Four Year Malfunction Test Plan 1)

Malfunctions have been added to a new catagory labeled " test prior to use".

These malfunctions are seldom if ever used ard do not reside in the CPSES Requal or Initial programs. Any malfunction labeled as " test prior to use"will not be accessible from the instructor station, but can be seen in the Malfunction Cause and Effects book. If a malfunction is labeled as " test prior to use", the instructor building the scenario must generate a Simulator Action Request to have the malfunction formally tested prior to use by any of the classes. Once a malfunction is tested in this manner, the test sheets will be added to the Annual Test Report and vaulted as part of the Annual Test Program documentation. A significant portion of the malfunctions (83 of 143) moved to this catagory were RM, radiation monitoring, and simply caused a detector to fail to a specified severity with the remaining malfunctions (60 of 143) from various system catagories not regularly used for training. These changes do not violate the requirements of ANSl/ANS-3.5,1985 standard, section 3.1.2 Plant Malfunctions.

2)

Three malfunctions numbers have been deleted from the annual test program.

CV25 - BCMS failure, tha BCMS system is no longer in use at CPSES.

FWO2 - Feedwater system leaks, this malfunction has been split into FW31A-D and FW32A-D to allow better training usage. Instead of simply having a feedwater leak inside containment, the instructor may now choose a location as well.

IA05 - Service Air Compressor trip, the service air compressor at CPSES was removed and a dual unit service air compressor installed. The new unit is only used between the hours of 07:00 and 15:30 Monday through Friday and this malfunction was deemed unnecessary.

J 3)

CPSES currently has 32 malfunctions "In Development". These malfunctions numbers have been selected as place keeping aides for the simulator group and will be implemented when our new containment, feedwater and heater drain models are compMted.

l f

l

FOUR YEAR MALFUNCTION TEST SCHEDULE MALF.#

. YEAR 1 YEAR 2 YEAR 3 YEAR 4 test prior to use AN01 X

AN02 X

ANO3 X

AN04 X

AN05 X

CC01 X

CC02 X

CC03 X

CH01 X

CH02 X

CH03 X

CH05 CH12 X

CR01 X

CR02 CR03 CS01 X

CS02 X

CS03 X

CSO4 X

CS05 X

CS06 X

CS07 X

CS08 X

l CS09 X

CV01 X

CV02 X

CV03 X

i CV04 X

CV05 X

i CV06 X

l CV07 X

CV08 X

j CV09 X

CV13 X

l CV14 X

l CV15 X

i CV16 X

CV17 X

CV18 X

l CV19 X

CV20 X

i 1

FOUR YEAR MALFUNCTION TEST SCHEDULE

)

MALF.#

YEAR 1 YEAR 2 YEAR 3 YEAR 4 testprior to use CV21 X

CV22 X

CV23 X

CV24 X

CV26 X

1 CV27 X

l CV28 X

{

CV29 X

j CWO1 X

l CWC2 X

CWO3 X

CWO4 X

ED01 X

ED02 X

ED03 X

ED04A X

ED04B X

ED04C X

l ED04D X

ED04F X

ED04G X

ED04H X

ED04i X

I ED05A X

ED05B X

ED05C X

ED05D X

ED05E X

ED05F X

ED05G ED06A X

ED06B X

ED06C X

ED06D X

ED06E X

ED06F X

ED06G X

eda 7A X

ED07B X

ED07C X

ED07D X

ED07E X

2

i FOUR YEAR MALFUNCTION TEST SCHEDULE MALF.#

YEAR 1 YEAR 2 YEAR 3 YEAR 4 test prior to use ED07F X

ED07G ED07H ED071 X

ED07J ED07K EF07L ED08A X

ED08B X

ED08C X

ED08D X

ED08E X

ED08F X

ED08G X

ED08H X

ED081 X

ED08J X

ED08K X

ED08L X

ED08M X

ED08N X

ED080 X

ED08P X

ED09 X

ED10 X

ED11 X

ED12 X

ED13 X

ED14 ED15 ED16 l

ED17

)

ED18 l

ED19 EG01 X

EG02 X

EG03 X

EG04 X

(

EGOS X

EG06 X

i EG07 X

l EG08 X

l 3

t L_________.___._

FOUR YEAR MALFUNCTION TEST SCHEDULE MALF.#

YEAR 1 YEAR 2 YEAR 3 YEAR 4 test prior to use EG09 X

EG10 X

EG11 X

EG12 X

EG13 X

EN01 X

FWO1 X

l FWO2 X

FWO3 X

FWO4 X

FWOS X

FWOS X

FWO7 X

FWO8 X

FWO9 X

FW10A X

FW10B X

FW10C X

FW10D X

FW11 A X

FW11B X

FW11C X

FW11D X

FW12A X

FW12B X

FW17C X

FW12D X

FW14A X

FW148 X

FW15 X

FW16 X

FW17 X

FW18 X

FW19 X

FW20 X

FW21 X

FW22 X

l FW23 X

FW24 X

FW25 X

FW31 X

FW32 X

4

FOUR YEAR MALFUNCTION TEST SCHEDULE 4

MALF.#

YEAR 1 YEAR 2 YEAR 3 YEAR 4 test prior to use FW33 X

FW34 X

FW35 X

FW36 X

FW37 X

FW38 X

IA01 X

IA02 X

IA03 X

IA04 X

IA06 X

LP01 X

LP02 X

LP03 X

MS01 X

MS02 X

MS03 X

MS04 X

MS05 X

MS06 X

MS07 X

MS08 X

1 MSO9 X

MS10A1/B1/C1/D1 X

1

MS10A2/B2/C2/D2 X
MS10A3/B3/C3/D3 X
MS10A4/B4/C4/D4 -

X MS10A5/B5/C5/D5 X

MS11 X

MSir X

MS13 X

3 N101 X

I N102 X

N103 X

N104 X

j NIOS X

NIO6 X

j N107 X

N108 N109 X

N110 X

l N111 X

l 5

L----_-----_-----------------------

FOUR YEAR MALFUNCTION TEST SCHEDULE 1

MALF.#

YEAR 1 YEAR 2 YEAR 3 YEAR 4 test prior to use NI12 X

N113 X

N114 X

PC01 X

PCO2 X

PC03 X

PC04 X I PC05 X

PC06 X

PC07 X

RC01 X

RC02 X

RC03 X

RC04 X

RC05 X

RC06 X

RC07 RC08A1/B1/C1/D1 X

RC08A2/B2/C2/D2 X

I RC09A1/B1/C1/D1 X

l RC09A2/B2/C2/D2 X

RC10 X

RC11 X

RC12 X

RC13 RC14 RC15 X

l RC16 i

RC17 RC18 j

RC19 RC20 RC21 RC22 l

RC23 l

RD01 X

RD02 X

l RD03 RD04 X

l RDOS X

RD06 X

RD07 X

6

KilR YEAR MALFUNCTION TEST SCHEDULE MALF.#

YEAR 1 Y~AR 2 YEAR 3 YEAR 4, test prior to use RD08 X

RD09 X

RD10 X

RD11 X

RD12 X

RD13 X

RD14 X

RH01 X

RH02 X

RH03 X

RH04 X

RHOS X

i RH06 X

RH07 RH08 RM01A X

RM01B X

RM02A1 X

RM02A2 X

RM02A3 X

RM02A4 X

RM02A5 X

RM02A6 X

RM02A7 X

RM02A8 X

RM02A9 X

RM02B1 X

RM02B2 X

RM02B3 X

RM02B4 X

RM02B5 X

RM02B6 X

RM02B7 X

RM02C1 X

RM02C2 X

RM02C3 X

RM02C4 X

RM02C5 X

RM02C6 X

RM02C7 X

l l

RM02C9 X

RM02C10 X

7 l

--.,5 FOUR YEAR MALFUNCTION TEST SCHEDilLE MALF.#

YEAR 1 YEAR 2 YEAR 3 YEs d 4 test prior to use RM02C11 X

RM02D1 X

RM02D2 X

RM02D3 X

RM02D4 X

RM02D5 X

RM02D6 X

RM02E2 X

RM02F1 X

RM0JA1 X

RM03A2 X

RM03A3 X

RM03A4 X

RM03A5 X

RM03A6 X

RM03A7 X

RM03A8 X

RM03A9 X

RM03A10 X

RM03A11 X

RM03A12 X

RM03A13 X

RM03A14 X

RM03B1 X

RM03B2 X

RM03B3 X

RM03C1 X

RM03C2 X

RM03C3 X

RM03C4 X

RM03D X

RM03E X

RM03F X

RM03G X

RM03Q X

l RM03R X

RM03U1 X

RM03U2 X

I l

RM03U3 X

l RM03U4 X

RM03V X

RM03H X

8

FOUR YEAR MALFUNCTION TEST SCHEDULE MALF.#

YEAR 1 YEAR 2 YEAR 3 YEAR 4 test prior to use RM031 X

RM03J1 X

RM03J2 X

RM03J3 X

RM03K1 X

RM03K2 X

RM03L X

RM03M X

RM03N X

RM030 X

RMO3P3 X

RM03S X

RM03T X

RM04 X

RP01 X

RP02 X

RP03 X

RPO4 X

RP05 X

RP06 X

RP07 X

RP08 X

RP09 X

RP10 X

RP11 X

RP12 X

RP13 X

RP14 X

RP15 X

RP16 X

RP17 X

RP18 X

RP19 X

RP20 X

RP21 X

RP22 X

RP23 X

j RP24 X

RX01 X

RX02 X

RX03 X

RX04 X

t f

9 i

1 I

FOUR YEAR MALFUNCTION TEST SCHEDULE l

l l

MALF.#

YEAR 1 YEAR 2 YEAR 3 YEAR 4 test prior to use l

RX05 X

RX06 X

i i

RXO7 X

RX08 X

i RX09 X

l RX10 X

l RX11 X

I RX12 X

l RX13 X

RX14 X

RX15 X

RX16 X

l RX17 X

RX18 X

l RX19 X

SG01 X

SG02 X

S101 X

S10 2 X

S10 3 X

S104 X

SWO1 X.

l SWO2 X

SWO3 X

TC01 X

TC02 X

TC03 X

TC04 X

TC0!i X

TC03 X

TC07 X

TC08 X

TC09 X

TC10 X

TC11 X

TC12 X

TP01 X

TPC2 X

TP03 X

TP04 X

1 TP05 X

X TP06 X

l 10

y I

1 i

l FOUR YEAR MALFUNCTION TEST SCHEDULE

)

l MALF.#

YEAR 1 YEAR 2 YEAR 3 YEAR 4 test prior to use TUO1 X

X TUO2

~

X X

TUO4 X

X l.

TU0S X

X 1

TUO6 X

X WD01 l

X X

' Malfunction Test Distribution ;

Totalneeding testing prior to Year 1 65 25%

use Year 2 70 26.9 %

Year 3 64 24.6 %

143 Year 4 61 23.5 %

i TotalIn Use 260 100 %

, in Development Deleted #'s 1

~

CC04 FW26 CH13 MS15 CH04 FW27 CH14 MS16 CV25 i

CHOS FW28 CH15 MS17 FWO2 CH07 FW29 CH16 S10 5 IA05 CH08 FW30 CH17 SS01 l

CH09 IA07 CS10 SS02 i

CH10 lA08 CV30 SS03 l

CH11

'MS*

  • CV31 WD02 I

Totalin'Dev.

^

32 11 L___________

_ _ _. _ _