Forwards Insp Rept 50-285/87-30 on 871102-06.Violations Noted.Separate Correspondence Will Address Required Licensee Response
ML20237A626
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/10/1987
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20237A627 List:
References
EA-87-210, NUDOCS 8712150137
Download: ML20237A626 (2)


See also: IR 05000285/1987030

Text

_

'

  • A

OEC 10 1987

l

In Reply Refer To:

Docket: 50-285/87-30 )

EA 87-210 l

!

l

Omaha Public Power District I

ATTN: R. L. Andrews, Division Manager- l

Nuclear Production i

1623 Harney Street

Omaha, Nebraska 68102

Gentlemen:

This refers to the special inspection conducted by Messrs. W. C. Seidle,

J. R. Boardman, and J. I. Tapia of this office during the period November 2-6,

1987, of activities authorized by NRC Operating License DPR-40 for the Fort

Calhoun Station, and to the discussion of our findings with you and members of

your staff at the conclusion of the inspection.

The area examined during the inspection was licensee corrective actions in I

response to water intrusion into the Instrument Air System. Within this area,

the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the NRC

inspectors. The inspection findings are documented in the enclosed inspection

report.

During this inspection, it was found that certain activities under your license

appeared to be in violation of NRC requirements. The violation reported in

paragraph 2.c of the enclosed inspection report does not require a written

response at this time. Your response to this matter will be addressed in

separate correspondence.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Sigac<t By

A. II. Deach

1

'

L. J. Callan, Director

Division of Reactor Projects

Enclosure:

l Appendix - NRC Inspection Report

1

50-285/87-30 8712150137 871210 n

PDR ADOCK 05000285 U

cc w/ enclosure: G PDR , i

Fort Calhoun Station / '

ATTN: W. G. Gates, Manager

P.O. Box 399

Fort Calhoun, Nebraska 68023

i RI Qh PE C:0PS C:PSB T C:0B / E0 N D: k

l JBodPdman/c WSeidle TWesterman JGaglia do' ilhknDPowers LCallan

il Mo /87 JTapij/87

ll/g5 N /30/87 /1-/f 81 Q /7 /87 r1/cl /87 [Z,/$87

l /2/ /0 /87

.

- _ _ _ _

. .

Omaha Public Power District -2-

Harry H. Voigt Esq. 4

LeBoeuf, Lamb Leiby & MacRae

'

1333 New Hampshire Avenue, NW

Washington, D. C. 20936

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director l

bcc to DMB (IE01)

l

bcc distrib. by RIV: i

R.D. Martin, RA RPSB-DRSS

  • Section Chief (DRP/B) * MIS System
  • RIV File *DRP l
  • RSTS Operator * Project Engineer, DRP/B l
  • Lisa Shea, RM/ALF *T. Bournia, NRR Project Manager ,
  • R. Hall *DRS l
  • TSS *RRI 1
  • J. Boardman D. Powers
  • J. Tapia *W. Seidle  ;

1

I

  • w/766

l

i

l

,

i