ML20237A566
| ML20237A566 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 08/10/1998 |
| From: | Grobe J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Patulski S WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20237A569 | List: |
| References | |
| 50-266-98-16, 50-301-98-16, NUDOCS 9808140184 | |
| Download: ML20237A566 (3) | |
See also: IR 05000266/1998016
Text
_ - - _ - __ _ _ _ _ _ _ _ _ _ ___ ___ - _ - _ - __-___ _ _ - - _ _ _ -__ _ _-_ _ _- __ - - _-
+-
.
.
.
August 10,1998
Mr.,S. A. Patuiski
Site Vice President
Point Beach Nuclear Plant
6610 Nuclear Road
- Two Rivers, WI 54241
SUBJECT:
NRC POINT BEACH SECURITY INSPECTION REPORTS 50-266/98016(DRS);
50-301/98016(DRS)
Dear Mr. Patulski:
On July 17,1998, the NRC completed an inspection at your Point Beach Nuclear Plant. The
enclosed report presents the results of that inspection.
)
Areas examined within your security program are identified in the report. Within those areas,
the inspection consisted of a selective examination of procedures and representative records,
observation of performance, and interviews with staff. The objective of the inspection effort was
to determine whether activities authorized by the license were conducted safely and in
accordance with NRC requirements.-
Based on the results of this inspection, no cited violations of NRC requirements were identified.
However, we are concemed that security management was not effective in resolving two
potentially significant security problems in a timely manner. ln both cases long term
compensatory measures were required to be implemented that strained security officer
_
resources. We acknowledged your awareness of the management monitoring problems and
. your action to implement improvements to ensure that security issues are addressed and
resolved in a timely manner.
The overall effectiveness of your security program was fundamentally sound. Except for the
. findings noted in this report, on-duty security personnel demonstrated proper implementation of
security requirements. Security equipment functioned as designed.
\\
,
l
I
)
.
L
9808140184 980810
E
gDR
ADOCK 05000266
i
'
eor
i
_
-
______-____-_-_-_--__m
. _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _
_ __
.
S. Patuiski
2
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
enclosure will oe placed in the NRC Public Document Room (PDR).
Sincerely.
Original Signed by John A. Grobe
John A Grobe, Director
Division of Reactor Safety
Docket Nos.: 50-266;50-301
Enclosure:
Inspection Reports 50-266/98016(DRS); 50-301/98016(DRS)
cc w/ encl:
R. Grigg, President and Chief
Operating Officer, WEPCO
M. Sellman, Chief Nuclear Officer
M. Reddeman, Plant Manager
J. O'Neill, Jr., Shaw, Pittman,
{
Potts & Trowbridge
'
K. Duveneck, Town Chairman
.
Town of Two Creeks
l
B. Burks, P.E., Director
Bureau of Field Operations
J. Mettner, Chairman, Wisconsin
'
Public Service Commission
l
S. Jenkins, Electric Division
l
Wisconsin Public Service Commission
State Liaison Officer
'
DOCUMENT NAME: G:\\DRS\\ pol 98016.DRS
To receive a co py of this document, indicate in the box "C" = Copy w/o attach /end "E" = Co)y w/ attach /end "N" = No copy
OFFICE
Rlh,
g<J))(N
ld
Rill
E
Rill
ar4 I
l
NAME
TMJ4bds:jp
W eed
MKurfwski
JGrot6N
i
DATE
f/ 4 /98
$ (o /98
%/ G 198
7/p /9p
OFFICIAL RECORD COPY
,
1
l
L
J
_ _ _ _ _
. _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _
_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ - _ _ _ _ _
.
.
.
S. Patuiski
3
Distribution:
l
. CAC (E-Mail)
Project Mgr., NRR w/enci
J. Caldwell, Rlli w/encI
i
. C. Pederson, Rlli w/enci
B. Clayton, Rlli w/ encl
SRI Point Beach w/ encl
DRP w/ encl
TSS w/ enc!
'
DRS (2) w/enci
Rlli PRR w/ nct
PUBLIC 1
w/ encl
i
Docket File w/enci
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
I
l
'
,
I
l
i
l
140035