Text
1
k'
!
1
In Reply Refer To:
Docket:
50-267/87-31
DEC 101967
l
!
Public Service Company of Colorado
ATTN: Robert O. Williams, Jr.
j
Vice President, Nuclear
Ooerations
2420 West '6th Avenue, Suite 15c
l
2
Denver, Colorade
80211
j
Gentlemen:
This refers to the inspection conducted by Mr. R. E. Farrell of this office
I
during the period October 30 through November 3,1987, of activities authorized
by NRC Operating License DPR-34 for the Fort St. Vrain Nuclear Generating Station,
and to the discussion of our findings with you and other members of your staff
!
at the conclusion of the inspection.
l
The area examined during the inspection was licensee action on NRC
Violation 267/8619-03 (corrective action request program). Within this area,
i
the inspection consisted of selective examination of procedures and
j
representative records, interviews with personnel, and observations by the
j
NRC inspector.
The inspection findings are documented in the enclosed inspection
report.
Significant progress to correct deficiencies in your corrective action program
)
l
were noted during this inspection period.
You have instituted an aggressive
l
audit and identification program, and have demonstrated the ability to take
'
l
effective comprehensive corrective action.
While the progress made and work
demonstrated is commendable, management attention should be directed to the
long time span between identification of deficiencies and the commencement of
effective, thorough corrective action. We will continue to monitor your
progress in establishing a fully satisfactory corrective action program and
your actions to bring this matter to a closure.
I
Within the scope of the inspection, no violations or deviations were
identified.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
l
8712150024 871210
Original Ffened ply
)
i
ADOCK 05000267
L. J. Clum
l
G
L. J. Callan, Director
Division of Reactor Project
Enclosure:
(see next page)
,
RIV: SRI M @
PS/B D
D:DRP
hOf
J
e
REFarrell/ld 7 * g
TFWesterman
LJCallan
11/2f/87
U/
g/p/87
1)/10/87
-
-
,,.
--.
,
,
Public Service Company of Colorado
-2-
Enclosure:
Appendix - NRC Inspection Report
50-267/87-31
cc w/ enclosure:
Manager, Nuclear Production Division
Fort St. Vrain Nuclear Generating Station
16805 WCR 19 1/2
Platteville, Colorado
80651
P. Tomlinson, Manager, Quality
Assurance Division
(Same Address)
Colorado Radiation Control Program Director
Colorado Public Utilities Commission
bcc to DM8 (IE01)
bcc distrib. by RIV:
- RRI
R. D. Martin, RA
- Section Chief (DRP/8)
- Project Engineer, DRP/B
RPSB-DRSS
- Lisa Shea, RM/ALF
- MIS System
- RSTS Operator
- K. Heitner, NRR Project Manager
- RIV File
- R. Hall
- DRS
- TSS
- DRP
,
- w/766
1
1
i
L -
- ..-
.