Forwards Equipment Qualification Insp Rept 50-341/87-39 on 870921-1109 & Notice of Violation.Deficiencies Re Implementation of Program to Meet 10CFR50.49 Requirements Under Consideration for Possible Enforcement Action
ML20237A235
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/08/1987
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sylvia B
DETROIT EDISON CO.
Shared Package
ML20237A236 List:
References
NUDOCS 8712140349
Download: ML20237A235 (2)


See also: IR 05000341/1987039

Text

_

._

__ __ ___ - ___- - _ _

-

.

DEC 8

19p

1

Docket No. 50-341

The vetroit Edison Company

ATTN:

B. Ralph Sylvia

i

Group Vice President

l

Nuclear Operations

6400 North Dixie Highway

Newport, MI 48166

Gentlemen:

This refers to the special Equipment Qualification (EQ) safety inspection

conducted by Mr. A. S. Gautam and other NRC representatives of this office on

September 21 through November 9,1987, of activities at Fermi 2 Nuclear Power

Station authorized by NRC License No. NPF-43 and to the discussion of our

findings with Mr. Quong Dong at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements as specified in the enclosed Notice. A written response

is required.

Although the inspection determined that you have implemented a program to meet

the requirements of 10 CFR 50.49, two significant deficiencies in the program

implementation were observed.

These findings are classified as Potentially

Enforceable / Unresolved Items and an ongoing NRC review is being performed to

evaluate these findings in regard to possible future enforcement action.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Ma" .gement and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

B712140349 973pog

PDR

ADOCK 05000341

G

PDR

\\

V\\

\\

I

___________f___

3

.

.

b

The Detroit Edison Company

2

DEC8

1987

'

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C?icird Sigr.:d by J. J. IF .

.,

J. J. Harrison, Chief

Engineering Branch

Enclosures:

1.

Notice of Violation

2.

Inspection Report

No. 50-341/87039(DRS)

cc w/ enclosures:

Lewis P. Bregni, Licensing

P. A. Marquardt, Corporate

Legal Department

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Harry H. Voight, Esq.

Michigan Department of

Public Health

Monroe County Office of

Civil Preparedness

J. Stefano, Project-Manager, NRR

M. Kopp, RIII

P. R. Pelke, RIII

E. Greenman, RIII

U. Potapovs, NRR

L. Bustard, Sandia

h

RIII

RIII

RIII

RIII

RI

-

Gautam/mnj

Kopp

Gre

ri

G

ner

H ri on

a

,z e

y,p

g9

- - - - - _