Text
.n
.
,
h..
,
I
jIn Reply Refer To:
~
' Dockets:
50-498/87-55-
g
gg
i.
50-499/87-55-
[,
' Houston Lighting & Power Company
ATTN: .J. H. Goldberg
Group Vice President, Nuclear
lP. O. Box 1700
Houston, Texas 77001
Gentlemen:
-
,
This refers to the inspection conducted by Messrs. O, R. Carpenter,
E. Hildebrand, and .other raembers of this office during the period
' September 1-30, -1987, of activities authorized by NRC Operating License NPF-71
.I
and Construction Permit CPPR-129 for the South Texas Project, Units 1 and 2,
. respectively, and to' the discussion of our findings 'with Mr. W. H. Kinsey and
other members ~of your staff at the conclusion of the inspection.
Areas examined during the inspection included NRC Bulletins, incore
instrumentation system, status'of incomplete preoperational tests, Unit 2 test
1
program, component cooling water heat exchangers, power operated relief block
]
valves, station accountability drill, allegation followup, initial control rod
.
drop testing.and rapid refueling demonstration, pressure code safety valves,
and site tours. . Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with
personnel,'and observations by the NRC inspectors. The inspection findings are
documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 2.of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed By
I
L 1. CaHan
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
(see next page)
AC k
D:DRP P
R V: . I'
I/} P
/
C OR
'rpenter/lr gMidebrand p I/ 4/87
ndy
G
stable
MEEmerson
LJCallan
D
li/Lj/87
it/q/87
I
ll/i/87
D/Q/87
(t/1/87
[6C/
l
8712140339 871209
l-
ADOCK 05000498
"
\\
G
\\
_---
- _ _ - _ _ _ _ -_.
8
J
!
Houston Lighting & Power. Company
-2-
l
1
Enclosure:
Appendix - NRC Inspection Report
50-498/87-55
50-499/87-55
cc w/ enclosure:
Houston Lighting & Power Company
i
ATTN:
M. Wisenberg, Manager,
Nuclear Licensing
P. O. Box 1700
Houston, Texas
77001
Houston Lighting & Power Company
ATTN:
Gerald E. Vaughn, Vice President
Nuclear Operations
!
P. O. Box 1700
Houston, Texas
77001
Central Power & Light Company
1
'
ATTN:
R. L. Range /R. P. Verret
P. O. Boa 2121
Corpus Christi, Texas
78403
City Public Service Board
ATTN:
R. J. Costello/M. T. Hardt
P. O. Box 1771
San Antonio, Texas
78296
l
City of Austin-
'
ATTN:
M. B. Lee /J. E. Malaski
,
2
O. Box 108F
78767-8814
Texas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
iLDRP
'
- RRI-0PS
R. D. Martin, RA
- RRI-CONST.
- SectionChief(PS/D)
RPSB-DRSS
- MIS System
- RIV File
- Lisa Shea, RM/ALF
- RSTS Operator
R. Bachmann, 0GC
- H.
Bundy
- P. Kadambi, NRR Project Manager
- R. Taylor
- TSS
- R. Hall
M. Emerson (2)
440RS
- w/766