ML20236X772
| ML20236X772 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 11/25/1987 |
| From: | Pate R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Cockfield D PORTLAND GENERAL ELECTRIC CO. |
| Shared Package | |
| ML20236X774 | List: |
| References | |
| NUDOCS 8712100257 | |
| Download: ML20236X772 (2) | |
See also: IR 05000344/1987034
Text
-
.:
.
.
,
..
,-
NOV 251987
Docket No. 50-344
Portland General Electric Company
121 S. W. Salmon Street
1
Portland, Oregon 97204
Attention:
Mr. David W. Cockfield
Vice President, Nuclear
SUBJECT: .NRC INSPECTION OF THE TROJAN NUCLEAR PLANT
This refers to the unannounced routine inspection conducted by Mr. C. Ramsey
j
of this office on September 21 through 25, 1987, of activities c 3.horized by
NRC license No. NPF-1 and to the discussion of our findings hela with members
of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report.
Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
Your
response to this Notice is to be submitted in accordance with the provisions
of 10 CFR 2.201.
Furthermore, although the efforts you are taking to achieve compliance with
the requirements of Appendix R to 10 CFR 50 are recognized by the NRC, a
number of other issues raised in this report regarding implementation of your
fire protection program are considered to be significant.
We wish to
re emphasize to you the importance that the NRC places on effective
implementation of the routine fire protection program.
You are requested to
include in your response your position regarding the following additional
issues discussed in the report:
1.
Fire pump testing in accordance with governing code design criteria
(paragraph 3.B(2)).
2.
Use of the offsite Fire Department to provide a backup water supply to
the Service Water System (paragraph 48).
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
The response directed by this letter and the accompanying Not ke is not
i
subject to the clearance procedure of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
8712100257 871125'
ADOCK 05000344
\\\\
G
ZE01
_
__ _
_ - _ - _ - _ - _ - - _
_
,
,
j
l
NOV 251987
!
I
-2-
!
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sincerely,
,
h k &'J. Pate,
'
'
Robert
hief
Reactor Safety Branch
Enclosures:
A.
B.
Inspection Report No. 50-344/87-34
cc w/ enclosures:
C. Olmstead, PGE
J. W. Durham, PGE
W. Dixon, DOE
bcc w/ enclosures:
RSB/ Document Control Desk (RIDS) (IE01)
D. Persinko, NRR
Project Inspector
Resident Inspector
G. Cook
B. Faulkenberry
J. Martin
Docket File
bcc w/o enclosure B:
LFMB
M. Smith
Region V
[ RE VEST COPY ] 3EQUEST COPY ] REQUEST C PY ] JEQUEST COPY ]
[ ES / NO
]/YES) / NO
] YES / NO
](YES)/ N0
]
-
u
v
[ SEND TO POR ]
p
[ @ / NO ]
k.-
k
ca_
CRamsey/ norma
icha ds
AJohnson
RPatet</mE
11/4//87
11/M/87
lig/87
11/2 r/87
l
1
]
l
'
!
l