ML20236X651

From kanterella
Jump to navigation Jump to search
Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam at Facility on 981007.GFES Will Consist of 100 Questions.Max Time Allowed to Complete exam,3 Hours & Passing Score 80 Percent
ML20236X651
Person / Time
Site: Arkansas Nuclear  
Issue date: 08/03/1998
From: Pellet J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
References
NUDOCS 9808100167
Download: ML20236X651 (4)


Text

- _ - _ - - _ _ _ - _ _ - - _ - _ - _ - _ _ - - _ - - _ - _ - _ _ _ _ _ _ _ _.. - - _ _. _ _ -. _. _ - - _ - - - - - - - -. _ -

km etag J

0, UNITED STATES.

i h

E h.

NUCLEAR REGULATORY COMMISSION

V 3

'.C REGION IV 0,

if 611 RYAN PLAZA DRIVE, SUITE 400 D

%.9

,o ARLINGTON TEXAS 76011 8064 4...

AUG 3 1998 l

l

. C.' Randy Hutchinson, Vice President l

. Operations l

Arkansas Nuclear One L

Entergy Operations, Inc.

l 1448 S.R. 333 l

Russellville, Arkansas 72801-0967

SUBJECT:

GENERIC FUNDAMENTALS SECTION OF THE WRITTEN OPERATOR l

LICENSING EXAMINATION

\\

Dear Mr. Hutchinson:

l The NRC plans to administer a Generic Fundamentals Examination Section (GFES) of the written operator licensing examination at your facility on October 7,1998. The GFES will.

consist of 100 questions. The maximum time allowed to complete the examination is 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and the passing score will be 80 percent.

)

in order to nominate candidates, an authofized representative from your facility must submit a letter listing the names of candidates for the examination to the appropriate NRC Regional i

Administrator and to the Chief, Operator Licensing and Human Performance Branch. The letter must be received both in the Region and at NRC Headquarters by September 4,1998, in order to allow us to assign ~ docket numbers to the candidates and to make preparations for shipping

~

the examinations to you for administration. The letter must certify that the candidates will have

- completed their fundamentals training by the date of the examination and are enrolled in your training program leading to an NRC operator or senior operator license. The letter must also l

list the names of personnel you will be using to proctor the examination and the address to j

which the examinations should be sent. A sample registration letter is enciosed.

.The address for the Operator Licensing and Human Performance Branch Chief is as follows:

I Robert M. Gallo, Chief Operator Licensing and Human Performance Branch l

U.S. Nuclear Regulatory Commission l

Mail Stop OWFN 9 D25 Washington, DC 20555 l

O l

l l

i 9808100167 980803 PDR ADOCK 05000313 V

PDR 1

4

v' I

Entergy Operations, Inc. Approximately 2 weeks prior to the examination administration date, your designated facility contact will be sent a letter delineating examination particulars (i.e., proctor responsibilities, student I.D. numbers, etc.)

Sincerely, John L. Pellet, Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-313 50-368 License Nos.: DPR-51 NPF-6

Enclosure:

As stated cc w/ enclosure:

Sherrie Cotton, Training Manager Arkansas Nuclear One Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72801 cc w/o enclosure:

Executive Vice President

& Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286 Manager, Washington Nuclear Operations ABB Combustion Engineering Nuclear Power l

12300 Twinbrook Parkway, Suite 330 l

Rockville, Maryland 20852

l 9

Entergy Operations, Inc. l l

County Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801 Winston & Strawn 1400 L Street, N.W.

Washington, D.C. 20005-3502 David D. Snellings, Jr., Director Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street, Mail Slot 30 Uttle Rock, Arkansas 72205-3867 Manager Rockville Nuclear Licensing Framatome Technologies i

1700 Rockville Pike, Suite 525 Rockville, Maryland 20852 I

i l

L.

\\

l1 Entergy Operations, Inc.

-4 l

bec to DCB (IE42) bec distribution by RIV:

DRP Branch Chief Resident inspector W. Reckley, NRR (OWFN 13-G-8)

RIV file l

L. Miller, TTD E. W. Merschoff, RA L. A. Hurley, GFES file l

I DOCUMENT NAME: GFES1

(

Te r i n et su== t. A in hec c - c.,, en.w.ca e - c.,, mih enei s - n. c,,

RIV:OB1A /) /

N C:OB

//

i LAHurleyM JLPellet M 07$/98(/ '

07$/98 "

/ /98

/ /98 OFFICIAL RECORD COPY

!