Forwards Insp Rept 50-298/87-30 on 871116-20.No Violations or Deviations Noted
ML20236X622
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/04/1987
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20236X624 List:
References
NUDOCS 8712090333
Download: ML20236X622 (2)


See also: IR 05000298/1987030

Text

-. .. - .

_ _ . _

f

. DEC 4 - 1987

In Reply Refer To:

Docket: 50-298/87-30

Nebraska Public Power District

ATTN: George A. Trevors

Division Manager - Nuclear Support

P.O. Box 499

Columbus, NE 68601

Gentlemen:

This refers to the inspection conducted by Messrs. M. E. Skow and

D. M. Hunnicutt of this office during the period November 16-20, 1987, of

activities authorized by NRC Operating License DPR-46 for the Cooper Nuclear

Station, and to the discussion of our findings with Mr. Meacham and other

members of your staff at the conclusion of the inspection.

Areas examined during the inspection included followup of 10 CFR Part 21

reports, inspection and enforcement notices, bulletins sent for information,

generic letters, and licensee event reports. Within these areas, the inspection

consisted of selective examination of procedures and representative records, ,

interviews with personnel, and observations by the NRC inspectors. The

inspection findings are documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

We_have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

~0riginal Signed Dr

U. ]. Calbn

L. J. Callan, Director i

Division of Reactor Projects

Enclosure: (seenextpage) l

_

__

_

'

D:DRP

DRS:R /8! C:PS/C[

GLMadsen

C:0B

JEGagl(a'rdo

D:DRS

JLMilhdan LJCallan

MESkow;dp nicutt

I 2/V /87

it /1/87 12/~L/87 g / 9,/87 19/)/87

,

i >/3 j'87

f,

\

&2090333871204

ADOCK 0500op9g y \

o \

PDR

_ _-

-

- - - - - .

-

,

b

--.. ..

Nebraska'Public Power District -2-

Enclosure:

Appendix'- NRC Inspection. Report

50-298/87-30

cc.w/ enclosure:

Cooper Nuclear Station

' ATTN:- Guy Horn, Division Manager

'of Nuclear Operations

P.O. Box 98

Brownv111e, Nebraska 68321-

Kansas Radiation Control Program Director

Nebraska Radiation Control Program. Director

bec to DMB'(IE01)

,

~bec distrib. by RIV:

  • RRI R. D. Martin, RA
  • SectionChief(DRP/C) *Lisa Shea, RM/ALF

RPSB-DRSS * MIS System .

  • RIV File * Project Engineer, DRP/C-
  • RSTS Operator *W. Long .NRR Project Manager
  • R. Hall *DRS
  • TSS. *DRP
  • M. Skow