DEC 3
1987
Docket Nos. 50-327
and 50-328
Tennessee Valley Authority
ATTN:
Mr. S. A. White
Manager of Nuclear Power
6N 38A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT:
INSPECTION REPORT NOS. 50-327/87-31 AND 50-328/87-31
1
This letter forwards the results of a special inspection of TVA's Design
Baseline and Verification Program (DBVP) for the Sequoyah Nuclear Power
Plant, conducted at the plant site and in your Cedar Bluffs Offices between
l
June 29 and July 24, 1987.
The NRC inspection team was comprised of a multi-
.
discipline team of personnel from the Office of Nuclear Reactor Regulation
l
from consulting firms, and from the Region II Office.
The team concentrated on
'
the resolution and corrective action for the findings of the DBVP.
The team
also reviewed the corrective actions resulting from independent oversight of
this program by TVA's Engineering Assurance group and evaluated TVA's actions
in response to previous NRC design control and DBVP inspection reports.
internal reports (1) EA-0R-001, Engineering Assurance Oversight Review Report,
"Sequoyah Nuclear Plant - Unit 2 Design B3seline and Verification Program,"
dated April 29, 1987, and (2) the SQN DBVP Unit 2 Phase I report, dated May 29,
1987, characterize the program, its findings, and the Engineering Assurance
oversight effort.
These reports were also reviewed during this inspection.
As a result of the inspection, the NRC team concluded that the DBVP was generally
conducted in accordance with the program plan.
Implementation by bc'th DBVP
personnel and the Engineering Assurance oversight group appears to have been
adequate in most instances sampled by the inspection team within the scope of
_
the program areas inspected to date.
As noted in the report, implementation of corrective actions for DBVP findings
was still in progress at the time of the inspection, as was Engineering
Assurance (EA) sampling and verification of implementation.
We note that a
supplemental report addressing EA oversight of the DBVP has been submitted to
the NRC (R. Gridley letter dated October 23, 1987).
In order for the NRC to
assess the adequacy of the DBVP effort to support plant restart, the supplemen-
tal Engineering Ass.urance Oversight Report remains to be reviewed by the NRC.
Results of the inspection are presented in the enclosure.
8712090264 871203
ADOCK 05000327
G
.
l-
t
Tennessee Valley Authority.
-2-
DEC 3
1987
,
TVA provided a written response (R. Gridley letter dated October 27, 1987)
addressing the observations identified in Appendix A of the enclosed report in
advance of the issuing of this report.
The substance of these observations had
been communicated verbally to TVA during the inspection.
An additional NRC
inspection (Report 327, 328/87-64) was conducted on October 26-30, 1987.
This
subsequent inspection addressed many of the open observations addressed in the-
enclosed report. .The NRC's evaluation of your response to this letter will be
documented in inspection report 327, 328/87-64.
Any observations remaining
open at restart will require an evaluation _ of acceptability for such restart by
both TVA and the NRC.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC Public Document Room.
Should you have'any questions concerning this inspection, please contact me or
Mr. Gene Imbro, (301) 492-9664.
Sincerely,
) /
s
/
(b /M
l C,
V
Stewart D. Ebneter, Director
TVA Projects Staff
Office of Special Projects
Enclosure:
-Inspection Report 50-327/87-31
and 50-328/87-31
cc w/ enclosure:
See next page
l
l
l
4
i
-- __ _ __ _
. _ - _ _ _ -
4
Mr. S. A. White
'
Tennessee Valley Authority
Sequoyah Nuclear Plant
,
cci
General Counsel
Regional Administrator, Region II
Tennessee Valley Authority
U.S. Nuclear Regulatory Commission
400 West Summit Hill Drive
101 Marietta Street, N.W.
E11 B33-
Atlanta, Georgia 30323-
Knoxville, Tennessee 37902
Resident Inspector /Sequoyah NP
Mr. R. L. Gridley
c/o U.S. Nuclear Regulatory Commission
Tennessee Valley Authority
2600 Igou Ferry Road
SN 157B Lookout Place
Soddy Daisy, Tennessee 37379
Chattanooga, Tennessee 37402-2801
Mr. Richard King
Mr. H. L. Abercrombie
c/o U.S. GA0
Tennessee Valley Authority
1111 North Shore Drive
Sequoyah Nuclear Plant
Suite 225, Box 194
P.O. Box 2000
Knoxville, Tennessee 37919
Soddy Daisy, Tennessee 37379
Tennessee Department of
Mr. M. R. Harding .
Public Health
Tennessee Valley Authority
ATTH: Director, Bureau of
Sequoyah Nuclear Plant
Environmental Health Services
P.O. Box 2000
Cordell Hull Building
Soddy Daisy, Tennessee 37379
Nashville, Tennessee 37219
Mr. D. L. Williams
Mr. Michael H. Mobley, Director
' Tennessee Valley Authority
Division of Radiological Health
400 West Summit Hill Drive
T.E.R.R. A. Building
W10 B85
150 9th Avenue North
Knoxville, Tennessee 37902
Nashville, Tennessee 37203
County Judge
Dr. Henry Myers, Science Advisor
Hamilton County Courthouse
Conmittee on Interior
Chattanooga, Tennessee 37402
and Insular Affairs
U.S. House of Representatives
Washington, D.C.
20515
,
I
l
.
--._____.m.
_ _ _ . _ _
. - - -
__.
_
_
_ _ _ _
.
' Tennessee Valley Authority
-4
DEC 3
1987
Distribution: (w/ encl)
- DCS (Docket No.- 50 327/328).
LPDR
DRIS Reading
SIB Reading
,
l
EVImbro, NRR
BXGrimes, NRR
JGPartlow, NRR
REArchitzel, NRR
SEbneter , OSP
JAxelrad, OSP
SRichardson, OSP
GZech, OSP
BDLiaw, OSP
FMcCoy, RII
KBarr, RII
BBHayes , 01
SRConnelly, DIA
ELJordan, AE0D
Inspection Team (8)
JFair, OSP
Resident Inspector
NSIC'
OGC-Beth
Central Files
OSP Reading
FMiraglia
ACRS (10) da
TVA-Bethes
/
\\
/
y
- D:TVA
__:_______. W.flB :NR :DRI : SIB:DD R //:D:
- DD:
A
'
. . . . _ _ : . . /. ,t ;/
- NRR:DRIS-
OFC :NRR:DRIS:SI.
...:... . .....:. .
.......
.....:...
__.
_....:...... ___
. ' id
artlow
- SRich rdson :SDEbneter
NAME :REArchitzel
- EVImbro A :CJHa ghney :
...__:.__ .......___:. __ .._____ :.. __ ......:....._____. :...__.__..__:......_____.:.__.7,/87
.__
DATE :11/f /87
- 11///87
/
97
- 11// /87
- 11///87
- 11/W/87
- 11/7
'
/
_ . . . . . . .
__.
__