Forwards Safety Evaluation Accepting Licensee Response to Suppl 1 to GL-87-02,committing to Entire GIP-2,including Both SQUG Commitments & Implementation Guidance
ML20198E311
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 11/25/1992
From: Pulsifer R
Office of Nuclear Reactor Regulation
To: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20198E317 List:
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-87-02, GL-87-2, TAC-M69444, NUDOCS 9212070013
Download: ML20198E311 (3)


Text

_

mo ug

, c h-n O' .

UNITED STATES

'$ NUCLEAR REGULATORY COMMISSION F3

.i c, k. f WASHINoTON, D.C. 20%5 g *** f November 25, 1992 Docket No. 50-331 Mr. Lee Liu Chairman of the Board and Chief Executive Officer lowa Electric Light and Power Company P. O. Box 351 Cedar Rapids, Iowa 52406

Dear Mr. Liu:

SUBJECT:

EVALUATION OF DUANE ARNOLD ENERGY CENTER, 120-DAY RESPONSE TO SUPPLEMENT NO. 1 TO GENERIC LETTER 87-02 (TAC NO. M69444)

The enclosure provides the staff's evaluation of the Iowa Electric Light and Power Company's, the licensee, rasponse to Supplement No. I to Generic letter (GL) 87-02 for the Duane Arnold Energy Center (DAEC), which was submitted to the staff in a letter dated September 21, 1992.

Supplement No. I to GL 87-02 required that all addressees provide, within 120 days of the issue date of the supplement, either e commitment to use both the Seismic Qualification Utility Group (SQUG) commitments and the implement-ation guidance described in the Generic Impiementation Procedure, Revision 2 (GIP-2), as cortected on February 14, 1992, and as supplemented by the staff's Supplemental Safety Evaluation Report No. 2 (SSER No. 2) on GIP-2, or provide an alternative method for responding to GL 87-02. The supplement also required that those addressees committing to implement GIP-2 provide an imple-menation schedule, and provide the detailed information as to what procedures and criteria were used to generate the in-structure response spectra to be used for USl A-46, in addition, the staff requested in SSER No. 2 that the licensees inform the staff in the 120-day response if they intend to change their licensing basis to reflect a commitment to the USI A-46 (GIP-2) methodology for verifying the seismic adequacy of mechanical and electrical equipment, prior to receipt of the staff's plant-specific safety evaluation resolving USI A-46.

A telephone call was held with members of your staff on November 18, 1992 to discuss your submittal. As a result of that discussion to clarify your respanse, the NRC staff finds your 120-day response to be acceptable.

I

\

'\

9212070013 921125 PDR  !

ADOCK 05000331 P ppg <,'f.

pq ,, ,, __

n a: L- .. v a ._ r,sy ;, u u 5

Mr. Lee Liu Novenber 25, 1992 The impiantation schedule proposed by the licensee is within the 3-year response period requested by the staff in Sup)1ement No. I to GL 87-02 and is therefore acceptable. The acceptability of tie licensee's in-structure response spectra was also addressed by the staff and was found acceptable.

Sincerely, Olighaltignedby Robert M. Pulsifer, Project Manager Project Directorate 111-3 Division of Reactor Projects Ill/IV/V Office of Nuclear Reactor Regulation

Enclosure:

As stated cc: See next page DISTRIBUTION Docket File NRC & Ltscal PDRs PDill-3 Reading JRoe TKing JHannon PKreutzer RPulsifer 0GC JNorberg MMcBrearty l HAsher

ACRS(10)

PDIll-3 Gray l Region III, DRP l

l//

l OFFICE PD3-3:LA PD3-3:PM , NR[/ h h PD3dPD[

j NAME PKreut$$I RPulsi/$I[rp JNYrberg JHannon[

DATE il / 7/92 /l3/92 // /U/92 I//J)/92 1

gp gjrug0FFICIALRECORD

^'

&//f (A+.ostA*-

t DOCUME6 NAME: g:\duanearn\dua69444.ser ~M

s Mr. Lee Liu 2

lowa Electric Light and Power Company Duane Arnold Energy Center i

i cc:

i Jack Newman,-Esquire Kathleen H. Shea, Esquire i Newman and Holtzinger j 1615 L Street, N.W.

Washington, D.C. 20036 1

i Chairman, Linn County 1 Board of Supervisors-

Cedar Rapids, Iowa 52406 i- Iowa Electric Light and Power Company
1. ATTN: David L. Wilson

! Plant Superintendent, Nuclear 1

3277 DAEC Road l Palo, Iowa 52324 h Mr. John F. Franz, Jr.

Vice President, Nuclear

Duane Arnold Energy Center 3277 DAEC Road

,.- Palo, _ Iowa 52324

Mr. Keith Young Manager, Nuclear Licensing
Duane Arnold Energy Center i 3277 DAEC Road

, Palo, Iowa 52324 J U.S. Nuclear Regulatory Commission

! Resident Inspector's Office

! Rural Route #1 Palo, Iowa 52324

Regional Administrator, Region III U.S. Nuclear Regulatory Comission
799 Roosevelt Road

" Glen Ellyn, Illinois 60137 i Mr. Stephen N. Brown i

' Utilities Division Iowa Department-of Commerce-

-Lucas Office Building, 5th Floor i Des Moines, Iowa 50319 i

i 4

  • - - - - , - - - - , . -----.--ne,-, ,,-+,------, ,- -..--,e , ,.--,,m,,-,~ww- -.. v - , - - - , + - , ,,, er ,- ,,w+ , we , ~ < - - - y ---r--s--,, g e n k w