ML20198E311
| ML20198E311 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 11/25/1992 |
| From: | Pulsifer R Office of Nuclear Reactor Regulation |
| To: | Leslie Liu IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT |
| Shared Package | |
| ML20198E317 | List: |
| References | |
| REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-87-02, GL-87-2, TAC-M69444, NUDOCS 9212070013 | |
| Download: ML20198E311 (3) | |
Text
F3 mo ug h-c O'
n UNITED STATES
.i NUCLEAR REGULATORY COMMISSION c, k.
f WASHINoTON, D.C. 20%5 g
f November 25, 1992 Docket No. 50-331 Mr. Lee Liu Chairman of the Board and Chief Executive Officer lowa Electric Light and Power Company P. O. Box 351 Cedar Rapids, Iowa 52406
Dear Mr. Liu:
SUBJECT:
EVALUATION OF DUANE ARNOLD ENERGY CENTER, 120-DAY RESPONSE TO SUPPLEMENT NO. 1 TO GENERIC LETTER 87-02 (TAC NO. M69444)
The enclosure provides the staff's evaluation of the Iowa Electric Light and Power Company's, the licensee, rasponse to Supplement No. I to Generic letter (GL) 87-02 for the Duane Arnold Energy Center (DAEC), which was submitted to the staff in a letter dated September 21, 1992.
Supplement No. I to GL 87-02 required that all addressees provide, within 120 days of the issue date of the supplement, either e commitment to use both the Seismic Qualification Utility Group (SQUG) commitments and the implement-ation guidance described in the Generic Impiementation Procedure, Revision 2 (GIP-2), as cortected on February 14, 1992, and as supplemented by the staff's Supplemental Safety Evaluation Report No. 2 (SSER No. 2) on GIP-2, or provide an alternative method for responding to GL 87-02.
The supplement also required that those addressees committing to implement GIP-2 provide an imple-menation schedule, and provide the detailed information as to what procedures and criteria were used to generate the in-structure response spectra to be used for USl A-46, in addition, the staff requested in SSER No. 2 that the licensees inform the staff in the 120-day response if they intend to change their licensing basis to reflect a commitment to the USI A-46 (GIP-2) methodology for verifying the seismic adequacy of mechanical and electrical equipment, prior to receipt of the staff's plant-specific safety evaluation resolving USI A-46.
A telephone call was held with members of your staff on November 18, 1992 to discuss your submittal. As a result of that discussion to clarify your respanse, the NRC staff finds your 120-day response to be acceptable.
I
'\\
\\
9212070013 921125 PDR ADOCK 05000331 pq
<,'f.
P ppg n a:
L-v a._ r,sy
- , u u 5
Mr. Lee Liu Novenber 25, 1992 The impiantation schedule proposed by the licensee is within the 3-year response period requested by the staff in Sup)1ement No. I to GL 87-02 and is therefore acceptable.
The acceptability of tie licensee's in-structure response spectra was also addressed by the staff and was found acceptable.
Sincerely, Olighaltignedby Robert M. Pulsifer, Project Manager Project Directorate 111-3 Division of Reactor Projects Ill/IV/V Office of Nuclear Reactor Regulation
Enclosure:
As stated cc: See next page DISTRIBUTION Docket File NRC & Ltscal PDRs PDill-3 Reading JRoe TKing JHannon PKreutzer RPulsifer 0GC JNorberg MMcBrearty l
HAsher ACRS(10)
PDIll-3 Gray l
Region III, DRP l
l//
l OFFICE PD3-3:LA PD3-3:PM NR[/ h h PD3dPD[
NAME PKreut$$I RPulsi/$I[rp JNYrberg JHannon[
j DATE il / 7/92
/l3/92
// /U/92 I//J)/92 gp gjrug0FFICIALRECORD
&//f (A+.ostA*-
^'
1 t
DOCUME6 NAME:
g:\\duanearn\\dua69444.ser ~M
s 2
Mr. Lee Liu lowa Electric Light and Power Company Duane Arnold Energy Center i
i cc:
i Jack Newman,-Esquire Kathleen H. Shea, Esquire i
Newman and Holtzinger j
1615 L Street, N.W.
Washington, D.C.
20036 1
i Chairman, Linn County 1
Board of Supervisors-Cedar Rapids, Iowa 52406 i-Iowa Electric Light and Power Company 1.
ATTN: David L. Wilson Plant Superintendent, Nuclear 1
3277 DAEC Road l
Palo, Iowa 52324 h
Mr. John F. Franz, Jr.
Vice President, Nuclear Duane Arnold Energy Center 3277 DAEC Road l -
Palo, _ Iowa 52324 Mr. Keith Young Manager, Nuclear Licensing Duane Arnold Energy Center i
3277 DAEC Road Palo, Iowa 52324 J
U.S. Nuclear Regulatory Commission Resident Inspector's Office Rural Route #1 Palo, Iowa 52324 Regional Administrator, Region III U.S. Nuclear Regulatory Comission 799 Roosevelt Road Glen Ellyn, Illinois 60137 i
Mr. Stephen N. Brown
' Utilities Division i
Iowa Department-of Commerce-
-Lucas Office Building, 5th Floor i
Des Moines, Iowa 50319 i
i 4
.--ne,-,
,,-+,------,,-
-..--,e
,.--,,m,,-,~ww-v
-, - - -, + -,,,, er,-
,,w+
we
, ~ < - - - y
---r--s--,, g e n k w