Text
7 y
L%,
,4 r
<g(
y (W
A DEC10 31987 t
Docket'No's.
50-277
- 50-278-Philadelphia" Electric" Company
- ATTN: Mr'.1 J. W. Gallagher' lVice. President ~
~
Nuclear. Operations.
2301 Market Street Philadelphia,' Pennsylvania 19101:
y Gentlemen:
Subject:
' QA Program Description Changes for Peach Bottom Atomic Power Station Units 2.and 3
References:
-(1)
Letter from J...W. Gallagher to William T. Russell dated' October 2,;1987-( 2 )..
Telephone conversations of November 30 and December'1, 1987, L. J.~ Prividy, NRC with D. L. Mcdonald, PECO, 'and
- t D. Rossman, PECO In'accordance with the. requirements'of 10 CFR 50.54,Lyou'provided to us.in Reference.(1) a-summaryfof'the changes to the quality assurance program description (QAPD) that were included in Revision 5 of the Peach Bottom' Atomic Power Stati.on Updated Final Safety' Analysis Report (UFSAR),
Revision 5 of the' 1
UFSAR included changes to the QAPD as of January,.1987.
The Region I staff has reviewed this submittal and determined that the concerns' identified in Attachme'nt 1 to this-letter need to be resolved prior
^
to our acceptance of the changes.
From-the-telephone' conversations of Reference (2) we understand that you intend to provide this office with a revised submittal by December 31, 1987 to
- resolve the concerns of Attachnient 1.
Also, you indicated that the QAPD changes. necessitated as a result of the' resolution of our concerns and other
-QAPD changes instituted since October,1987 would be' included in the next annual revision of the UFSAR.
If you have any further questions concerning the'above,.please contact Mr. L. J. Prividy of our staff on'(215) 337-5140.
by PDQ OFFICIAL RECORD COPY PB QA PROGRAM - 0001.0.0 12/01/87 1
i
mm n.
n OE p.
ai:]
yi LPhilhdelphiaLElectfic: Company y.< :
2._.
4 g:P r
x h
t i
r t
- , A ".
Your: coo'peratien in this regardiw~ 11 be appreciated [ f 1
^
Sincerely,-
gr orgipd NN f.
Wil11am.V. f Johnston,LActing Director
^
Division ofiReactor Safety g
0T
Enclosure:
- tAttachment.1 j
p cc.w/ enc 1:
' )l(V
'Dickinson M. Smith,' Manager, Peach Bottom' Atomic Power Station
' John lS.: Kemper, L Senio'r Vice President,. Engineering 'and Production.
Thomas S.1 Shaw, Jr.,; Vice President,; Production b
y, Troy B. - Conner, Jr., Esqui re.
- x W. H. _ Hirst, Director, Joint Generation Projects Department, Atlantic Electric-y G. Leitch, Nuclear.GenerationLManager H
_.. Eugene. J. Bradley, Esquire, Assistant General ~ Counsel (Without Report).
1 Raymond L. Hovish: Esquire _.
H Thomas Magette,.~ Power. Plant Siting,, Nuclear Evaluations-
._.= M. Alden, Engineer in Charge,- Licensing. Section W
' Doris'Poulsen, Secretary of Harford. County Council L<
'Public Document Room'(PDR)'
h
. Local Public Documen>. Room (LPDR)
L:
- Nuclear Safety;Inforniation Center (NSIC)
- NRC Resident?In>pector:
CommonwealthLof Pennsylvania becw/ enc 1:
- Region ILDock'et Room'(with concurrences)
Management' Assistant, DRMA (w/o enc 1) l Section Chief, DRP i
> Robert J.. Bores, DRSS
L'. J. Prividy P._K. Eapen d
RI S
RI S.
()12/7A7 1urphy Eapen 1
- Prividy
+
12/ 7 /87
< 12/ 2. /87
,l a
OFFICIAL RECORD COPY PB QA PROGRAM - 0002.0.0 i
12/02/87 l
1 i
b m _i_______
j
y ' ' J pm i f
W t
"o
.' Docket Nos. 50-277 J,g a;
50-2784 c
A i
ATTACHMENT l' ItemstTo Be Resolved-
'1.
In Section-17.2.1.4.1,1.a " specific" should be changed to'. special" for
- correctness.
2.
'Th'e detailed implementing requirement's for;the PEC0 NucleaE Fuel QA Program'previously 1n;Rev. 4, Section 17.2.1.3.1.1.a' through f. were
~
j deleted from the Rev. 5 submittal without justification.-
'3.
It is not clear what PECO group will-' assume detail'ed respons'ibility 'for:
0 the implementation of the PECO. Nuclear Fuel Qua11tyLAssurance Program.
4This responsibility was previously included in tha scope of the Nuclear 4
and Environmental. Section in the Engineerita and 'Research (E&R) organization ~However, the:11censee'sireorg nization prompted a change in. responsibilities for fuel activities.
Restsion 5 of the UFSAR states in.Section' 17.2fl.2.2;6..that the Fuel Management Sectionin Nuclear Operations:(NO) williimplement the.PEC0 Nuclear Fuel Quality' Assurance.
~
Program. Also,-Section 17.2.1.4.1.1 indicates that the Nuclear and:
L '<
Environmental Section in the E&R organization has interface;
?
. responsibilities' between the NO and E&R organizations for' activities E
, related to?special' nuclear material. 'Thus, it appears to be clear, that.
f
'the PEC0' Nuclear Fuel Quality Assuranc'e Program implementation.is now the-l responsibility of1the FueljManagement. Section in the' N0 organization.
L
- However, PECO indicated in its subraittal of 0ctober.2,-1987 that.this' R
. responsibility was still in the Nuclear and Environmental Section of the -
E&R organization.
I 4.
.Section - 17.2 J1'.3.1.3. and =17.2.1. 3.1.3. 3 delineate'the role of the' M
L
. Technical. Services Group in the Mobile Maintenance Section. But this-
'l group is'not.shown ori the Maintenance Department organization. chart H
.(Exhibit VI)..
j l
,)
5.
-Section 17.2.1.4 3 delineates that the Senior Engineer - QC reports.to I
the two Assistant General Superintendents. This is inconsistent with the
{
P organization chart for the Construction Division (Exhibit XI) which shows QC reporting to the General Superintendent.
6.
Section 17.2,4.3 - the addition of " preliminary" to this section requires j
- clari fication. Modification of this section to state that final j
requisition's are prepared by the Stores-Division and based on preliminary requests from.the ordering group appears to be inappropriate.
'7.
Section D.12.2.7.d - Minor maintenance work audits previously listed as a responsibility of the Plant Operations Review Committee were deleted without justification.
0FFICIAL RECORD COPY PB QA PROGRAM - 0003.0.0 J
12/02/87
=
_ _ - _ _ _