Submits Seismic Analysis Results of X-330 Rail Cars, Including Any Necessary Mods & Associated Implementation Schedule,As Committed in
ML20236X132
Person / Time
Site: Portsmouth Gaseous Diffusion Plant
Issue date: 07/31/1998
From: Toelle S
UNITED STATES ENRICHMENT CORP. (USEC)
To: Knapp M
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
GDP-98-0157, GDP-98-157, NUDOCS 9808070160
Download: ML20236X132 (3)


Text

-

. ~ _

3 ped USEC

  • 7 A Global Energy Company l

l i

July 31,1998

)

GDP 98-0157 Dr. Malcolm R. Knapp Acting Director, Office of Nuclear Material Safety and Safeguards Attention: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 i

l Portsmouth Gaseous Diffusion Plant (PORTS)

Docket No. 70-7002 Certificate Amendment Request - Update the Application Safety Analysis Report - Submittal of Rail Car Seismic Analysis Results

Dear Dr. Knapp:

By letter dated October 31,1997 (see the reference), USEC submitted a certificate amendment request containing the Safety Analysis Report Update (SARUP) required by Issue 2 of DOE /ORO-2027, " Plan for Achieving Compliance with NRC Regulations at the Portsmouth Gaseous Diffusion Plant," (the Compliance Plan) for NRC review and approval. USEC's October 31,1997, letter contained the following commitment:

l The SARUP re-classifies the X-330 rail cars for tails cylinders as Q components. A seismic analysis will be performed to assess the capacity of the rail cars to withstand the evaluation basis earthquake event. The results of the analysis, including the identification of any necessary modifications and the associated implementation schedule, will be sobmitted to the NRC by

' August 3,1998.

In accordance with this commitment, the seismic analysis of the rail cars has been completed. A summary of the results follows.

The rail cars utilized at PORTS for handling ofliquid UF cylinders were evaluated for response to 6

seismic induced loads from the Evaluation Basis Event (EBE) earthquake analyzed in the SARUP submittal. The rail cars were determined to have intrinsic capccity, cased on typical railroad car standards, to meet the load demands of the EBE seismic event. Previous modifications made to the rail cars by PORTS to support liquid UF, cylinders, including the addition of cradles, were reviewed relative to the EBE seismic event. The analyses performed, which are available at the site for review, concluded that: (1) the cylinder cradles would remain attached; (2) the cylinders would remain in the f

I j

6903 Rockledge Drive, Bethesda, MD 20817 1818

~*4 Telephone 301-564-3200 Fax 301564-3201 http://www.usec.com 98080701609k0I31n fiverm re. CA Paducah, KY Portsmouth, OH Washington, DC PDR ADOCK 07007002 4M

]

C PDR

?

i l

Dr. Malcolm R. Knapp i

July 31,1998 GDP 98-0157, Page 2 cradles; and (3) the rail car would remain stable on the tracks. As such, there was no cylinder failure predicted as a result of an EBE seismic event. No further modifications to the rail cars are required.

I Based on the results of this seismic analysis, USEC will revise the boundary description of the rail cars in SARUP Table 3.8-1. The revised boundary description will be submitted to the NRC by November 20,1998.

Any questions regarding this matter should be directed to Steve Routh at (301) 564-3251. New commitments contained in this submittal are identified in the enclosure.

Sincerely, n

6. O

/

Steven A. Toelle Nuclear Regulatory Assurance and Policy Manager

Reference:

Letter from James H. Miller (USEC) to Dr. Carl J. Paperiello (NRC), Certificate Amendment Request - Update the Application Safety Analysis Report, USEC Letter GDP 97-0189, October 31,1997.

Enclosure:

Commitments Contained in this Submittal cc: Mr. Robert C. Pierson, NRC NRC Region III Office NRC Resident Inspector - PORTS NRC Resident Inspector - PGDP Mr. Randall M. DeVault, DOE

\\

Enclosure.

GDP 98-0157 Page1of1 Commitments Contained in this Submittal l

l l

1. By November 20,1998, USEC will revise the SARUP Table 3.8-1 boundary definition for rail l