Text
_ _ - - _ _ _ _ _ _ _ _ _ _ _ - -
United States Enrichment Corporanon 2 Democracy Center T-6903 nockiedoe Drive Bethesda, MD 20817 Tel: (301)$64 3200 rac(301)564 3201 JAutS H. mLLER or (301)564 3309 VicE PRESIDENT, PRODUCTION Far (301)5714279 October 31,1997 Dr. Carl J. Paperiello SERIAL: GDP 97-0187 Director, Office of Nuclear Material Safety and Safeguards Attention: Document Control Desk U.S. Nuclear Regulatory Commission
- Washington D,C. 20555-0001 Paducah G',cous Diffusion Plant (PGDP)
Portsmou.a Gaseous Diffusion Plant (PORTS)
Docket Nos. 70-7001 and 70-7002 Submittal of Plan for Update of Safety Analysis Report (SAR) Chapter 3
Dear Dr. Paperiello:
In accordance with the commitment contained in the United States Enrichment Corporation (USEC) letters GDP 97 0147 and GDP 97-0148 to the Nuclear Regulatory Commission (NRC) dated August 18,1997. USEC has completed the preparation of a detailed plan of action and schedule for updating Chapter 3 of the Paducah and Portsmouth Safety Analysis Reports (SARs), USEC's plan includes the creation of a dedicated team managed by a full time project manager in a dual plant effort beginning on November 3,1997.
Key milestones in the project schedule are provided below for information. USEC will periodically update the NRC regarding the status of the SAR Chapter 3 update effort.
Key Milestone Scheduled Completion Date Develop a detailed plan and schedule Complete Project Start November 3,1997 Form Project Team November 5,1997 Preparc Writer's Guide December 11,1997 Dran 3 sample sections March 31,1998 L
Meet with NRC to review sample sections April 15,1998 h
Q Comple.c remaining sections September 29,1999 PORC approval of updated SAR Chapter 3 October 31,1999
~
9711200116 971031 PDR ADOCK 07007001 w
_v Omces in Lhrmore, Cahfornia' Paducah, Kentucky Portsmouth, Ohio Washington, DC
______-____-a
)
l e
Dr. Carl J. Paperiello c
October 31,1997 GDP 97-0187 Page 2 As identified in USEC letters GDP 97-0147 and GDP 97-0148, the update project will:
Identify structures, systems, components (SSCs) and processes to be described in SAR Chapter 3 to support the accident analysis.
Develop an outline of the new SAR Chapter 3. For planning and writer assignment purposes, the new SAR Chapter 3 has been preliminarily divided into 28 sections.
Establish the level-of-detail and subsection breakdown. This will be acconmlished through the development of a writer's guide and will be designed to provide a level of detail that is commensurate with the importance of the SSC or process to safety and the hazards and accient analysis. Existing industry guidance such as regulatory guides and SARs for rea: tor end fuel cycle facilities will be considered in establishing the appropriate level of detail. The writer's guide and project instructions will define methods to be used for validation of the updated SAR Chapter 3 information through field walk-downs and document reviews and will denne standards for preparation of the revised SAR Chapter 3 sections.
USEC has devoted considerable efTort to planning a project that provides a high degree of quality and assurance of accuracy within a reasonable schedule. Once the SAR Chapter 3 update is complete on October 31,1999, the effort will continue to include resolution of any identified differences between the updated SAR Chapter 3 and the other sections of the SARUP (reference letters GDP 97-0188 and GDP 97-0189). This will include activities to update, as necessary, the SARUP supporting documents such as the Design Analysis and Calculations (DACs), Plant Safety Operational Analyses (PSOAS), and other related design documents or programs. USEC will make the necessary changes to the SARUP supporting documents and the SARUP submittal by no later than October 31,2000 as stated in USEC letters GDP 97-0147 and GDP 97 0148.
USEC would like to schedule a meeting with NRC to present the detailed plan of action and schedule for the SAR Chapter 3 update, and will contact your staff to arrange the meeting. There are no new commitments made in this letter. Any questions regarding this matter should be directed to Steve Routh at (301) 564 3251.
Sincerely, W
/
a les 11. Miller
' dice President, P,oduction ec:
NRC Region 111 Office NRC Resident inspector - PGDP NRC Resident inspector - PORTS DOE Regulatory Oversight Manager