ML20236W805
| ML20236W805 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 12/03/1987 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
| Shared Package | |
| ML20236W807 | List: |
| References | |
| NUDOCS 8712080242 | |
| Download: ML20236W805 (2) | |
See also: IR 05000482/1987028
Text
-
._
'
~
3 1987
I;'
In Reply Refer To:
Docket:
STN 50-482/87-28
Wolf Creek Nuclear Operating Corporation
ATTN:
Bart D. Withers
Preside'nt and Chief Executive Officer
P. O. Box 411
Burlington, Kansas
66839
Gentlemen:
This refers to the inspection conducted by Mr. H. D. Chaney of this office
during the period October 26-30, 1987, of activities. authorized by NRC Operating
License NPF-42 for the Wolf Creek Generating Station, and to the discussion of
our findings with Mr. G. D. Boyer and other members of your staff at the
conclusion of the inspection.
Areas examined during the inspection included radiation protection activities
during a refueling outage.
Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspector.
The inspection findings are
documented in the enclosed inspection report.
During this inspection, it was found that certain of jour activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on specifics contained in the Notice of Violation
enclosed with this letter.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
The re'ponse directed by this letter and the accompanying Notice is not subject
s
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
'
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
'
Drlginal BIgned B3
,
A. B. Beach
'
L. J. Callan, Director
Division of Reactor P
'ects
Enclosures:
(see next page)
'
,
RIV: FRPS
C:FR S
C:RPS
AC [
'C . D /A
Q
HDCh3ney/tw
BMur
I l.'an
rson
P udon
LJCallan
MEEmg/87
\\1/ /87
p/z,/87
W/f)/87
f/f/87>
>/p /87
o/t
8712080242 871203
b
b
l
ADOCK 05000482
p
l
ry y
o
eon
r
-
,
l
.
..
i-
I'
Wolf Creek Nuclear Operating Corp.
--2 -
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B:- NRC Inspection Report
50-482/87-28
cc w/ enclosures:
Wolf Creek Nuclear Operating Corporation
ATTN: Otto'Maynard, Manager
of Licensing
P.' O. Box 411
Burlington, Kansas
66839
Wolf Creek Nuclear Operating' Corporation
_ ATTN: Gary Boyer,.P1 ant Manager
.P. 0. Box 411
Burlington, Kansas
66839
Kansas Corporation Commission
ATTN: Mr. Robert D. Elliott, Chief Engineer
Fourth Floor, Docking State Office Building
Topeka, Kansas
66612-1571
Kansas Radiation Control Program Director
bec to DMB (IE06)
bec distrib. by RIV:
- DRP/A
Myron Karman, ELD, MNBB (1)
- RRI
R. D. Martin, RA
- Section Chief.(DRP/A)
RPSB-DRSS
W. L. Forney, RIII
- RIV File
Resident Inspector, RIII
- MIS System
- RSTS Operator
- Project Engineer, DRP/A
- R. Hall
- Lisa Shea, RM/ALF
- P. O'Connor, NRR Project Manager-
- TSS
M. E. Emerson (2)
- H.
D. Chaney
- B. Murray
R. L. Bangart
i
'
- w/766
l
!
. _- - -_ -