Rev 6 to UEO-1041, Radioactive Matl Packaging & Transportation QA Program
ML20236W564
Person / Time
Site: 07100832
Issue date: 07/30/1998
From:
UNITED STATES ENRICHMENT CORP. (USEC)
To:
Shared Package
ML20236W561 List:
References
UEO-1041, UEO-1041-R06, UEO-1041-R6, NUDOCS 9808060067
Download: ML20236W564 (7)


Text

-__--_ _ _- - __-___ _-___-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

GDP 98-0155 1 Page Total Proposed Revision 6 Radioactive Material Packaging and Transportation Quality Assurance Program USEC Document UEO-1941 Removal / Insertion Instructions i

i Remove Pages Insert Pages

)

l Page iii Page iii Page ix Page ix i

Page 2 Page 2 l

1 l

l 1

l I

I I

1 9808060067 990730 1

PDR ADOCK 07100032 C

PDR l

!k___________.___.

l.

\\

l l

1 l

GDP 98-0155 1

Proposed Revision 6 to the 4

Radioactive Material Packaging and Transportation Quality Assurance Program l

1 i

)

UEO-1041 PROPOSED Rev.6 LIST OF EFFECTIVE PAGES Pages Revision

iii 6

iv 4

.v 4

vi 4

vii 4

- viii 4

J ix 6

i j.

x 4a l.

1 4

l 2

6 3

4

!~

'4 4a l

5 4a 6

4 l

7 4

j l

8 5

l l-9 4

10 4

l 11 4

12' 4

l 13 4

l 14 4

15 4

16 4

17 4

18 4

19 4

L 20 4

i 21 4

22 4

'23 4

24 4

25 4

I 26 4

i i

iii l

I u_______._____-_______.__.

UE0-1041 PROPOSED l

Rev.6 Revision Summary Page Revision.

Revision Summary

'4a Revision 4a includes changes to pages 4 and 5. These changes are identified by revision bars. These change's were approved for inclusion in Revision 4 but were inadvertently omitted.

Revision 4a also adds this Revision Summary Page.

5 Revision 5 revises section 2.5.2 to change the responsibility at PGDP for the'

- system of preparation, review, approval and use of procedures and instructions from the Training and Procedures Manager to the Procedures Manager.

6; Revision 6 revises section 2.1.1 to remove reference indicating that USEC is a wholly owned corporation of the United States. It also removes reference to the lease agreement between USEC and the Department of Energy (DOE) for operation of the gaseous diffusion plants (GDPs) and reference to USEC's use of an operating contractor which is redundant to information contained in the Safety Analysis Report (SAR).

l L

i l

J l

I ix L-______-__-_

UE0-1041 PROPOSED Rev.6

2. REQUIREMENTS 2.1 ORGANIZATION 2.1.1 Structure The USEC organizational structure is described in the Safety Analysis Reports (SARs) for the GDPs.

l 2.1.2 Responsibilities The positions having principal responsibility for activities covered under the scope of the Radioactive Material Pacbging and Transportation Quality Assurance Program (PTQAP) are described in the Safety Analysis Reports (SARs) for the GDPs.

2.1,2.1 Section deleted 2.1.2.2 Section deleted 2.1.2.3 Section deleted 2.1.2.4 Section deleted 2.1.2.5 Section deleted 2.1.2.6 Section deleted 2.1.2.7 Section deleted 2.2 QUALITY ASSURANCE PROGRAM 2.2.1 General l

The PTQAP complies with the applicable provisions of 10 CFR 71 Subpart II and is established, maintained, and executed as described in this document.

I 2