GEORGIA POWER COMPANY M O NTH LY OPERATING DATA REPORTS PLANT HATCH UNITS 1
AND 2
a c
a llTM/
' ' ~ ~
y m uni.iiiiil; y tillII Ill
\\
\\
'r>.
1 s...... J G 's 1
P" mn :nr,
PDk
i I
(;conJJa Power b l
l ENCLOSURE 1 i
TABLE OF CONTENTS PLANT HATCH - UNIT 1 l
NRC DOCKET DPR-57 MONTHLY OPERATING REPORT SEPTEMBER 1931 NARRATIVE REPORT Page El-1 OPERATING DATA REPORT Page El-2 AVERAGE DAILY POWER LEVEL Page El-3 UNIT SHUTD0HNS AND POWER REDUCTIONS Page El-4 l
i I
i I
a 0166C rmns i
NARRATIVE REPORT DOCKET NO.
50-321 uni? :
DATE:
OCT 2.
1957 COMPLETED EY:
,, CICwALD50N
' E L E : -C aiE :
1121
- t'- E.
- 5'?
September 1 0000 Mainta; :n; ; ^% poaer.
September 4 2140 Reducing load to e00 MWe for Week 1y Turbine Valve / Aux 111 artes Test, CRD Exercise, and MSIV trip test.
September 5 0004 Returning to 100% power.
September 12 0035 Reducing load to 740 MWe for Weekly Turbine Valve / Aux 211 aries Test and CRD Exercise.
September 12 0115 Returning to 100% power.
September 18 2357 Reducing load to 740 MWe for Weekly Turbine Valve / Auxiliaries Test and CRD Exercise.
t September 19 0037 Return:ng to 100% power.
September 23 1745 Reducing 1 cad to 730 MWe to verify position of rod 34-19 due to Inability to obtain position indication on four-rod display at position 24 Rod was inserted one notch to position 22 for indication and vert'ication and then withdrawn back to positson 24.
September 23 1945 Returning to 100% power.
September 25 2332 Reducing load to 710 MWe for Weekly Turbine Valve / Auxiliaries Test, Monthly Control Valve Test, CRD Exercise, and Safety Relief Valve Operability.
September 26 0240 Returning to 100% power.
September 26 1200 Banging noise identified in Torus area occuring every 5 to 6 seconds.
Determined to be caused by slight leah-by at
'K' SRV.
Maintaining
'B' loop of RHR in Torus Spray sode to eliminate banging by condensing tne steas before reaching SRV tailpipe.
September 30 2400 Maintaining 100% power.
I l
El-1
OPERAT'N3 0;TA CEFORT 00CtET NO. 56-21 CA7E:
CCT 2, 1;5'
- 0MFLETED By: J.
H.
~ :'0;D60N
{
TELEFh0NE: (912) 367-7781 ::278 0PERATING STATUS
- 1. UNIT NAME:
E.
1.' HATCH UNIT 1
.2.
REPORT PERIOD:
SEPTEMBER 1987
~3.
LICENSED. THERMAL POWER (MWt):
2436
- 4. NAMEPLATE RATING (GROSS MWe):
950
- 9. DESIGN ELECTRICAL RATING'(NET MWe):
776.3
- 4. GAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
783 7.
MAXIMUM DEPENDrBLE CAPACITY (NET MWe):
750
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 71 SINCE LAST REPORT GIVE REASONS:
NO CHANGES
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY:
N/A THIS. MONTH YR. TO DATE CUMULATIVE
=11.. HOURS.IN REPORTING PERIOD:
720 6551 102902
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.00 4982.66 72630.16
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.00 0.00 0.00-414 HOURS GENERATOR ON-LINE:
720.00 4836.96
.68562.36 19.-UNIT RESERVE SHUTDOWN HOURS:
0.00 0.00 0.00
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
1750464 11160599-147632510
- 17. GROSS ELEC. ENERGY GENERATED (MWHl:
564390 3595070 47662420
'18. NET ELEC. ENERGY BENERATID (MWH):
540470 3425101 45268011
- 19. UNIT SERVICE FACTOR:
100.00%
73.84%
66.58%
- 20. UNIT AVAILABILITY FACTOR:
100.00%
73.04%
66.50%
- 21. UNIT CAPACITY FACTOR (USING MDC NET):
100.09%
69.71%
58.61%
- 22. UNIT-CAPACITY FACTOR (USING DER NET):
96.70%
67.35%
56.25%
- 23. UNIT FORCED OUTAGE RATE:
0.00%
3.13%
15.67%
24 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): N/A
' 29. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A
- 26. UNITS IN TEST STATUS ( PRIOR TO COMMERCIAL OPERATIONis.
N/A 4
El-2
UNIT 1 AVERAGE DAILY DOCKET NO.
50-321 POWER LEVEL DATE:
OCT 2.
198~
- P T _ " c r_ :
!. : s_ -
'HPL. T : '., PY-
. ;'. agr:qq
..u
- , : ; -.; s4.c.
~, r - -
- z.,,.::_
[A<
Net "a 749 e
.g1 751 4
743 5.........
744 6.........
750 7
747 0.........
749 9.........
750 10.........
751 11 747 12.........
746 751 14 750 15.........
751 16.........
748 17 749 18.........
749 19.........
747 20.........
752 21 755 22.........
759
,,2 7e9 s
24 761 25.........
759 26.........
748 27.........
754 28.........
752 29.........
750 30.........
749 El-3 l
l l
[.
UNIT SHUTDOWNS AND POWER PEDUCTIONS DOCKET NO.
50-321 i
DATE:
OCT 2. 1987 UNIT.NAME:_
E.!. d'TCH 1 C0"FLETED BY: 'J.H.
EICHARDSON d
"E.E N NE:
( 11 h7-751
- 579-I l
REFORT MONTW SE:'ErEER lo37 l
i R
o 4
1 l
.: E!E
! Y l
l-
! Tl l A.: T l LICENSEE! SC 1
l l:
l Y t.
l'S l Hl EVENT
- T 0 l COMPONENT CAUSE & CORRECTIVE i
i P l DURATION! 'i l 0 l' REPORT i E D 1 CODE l-ACTION TO l
NO.
1 DATE i E-l(HOURS) : N : D NUMBER I M E !(SUBCODE):
PREVENT RECURRENCE
.i i
l
____a.
t i
i i
i l
l l
lNo significant power l
l l
l l reductions during September. l l
l l
l l
l I
i l
l l
l l
l l
l l
l l
1 l
l 1
1 i
l l
l l
l
-l l
l l
l l
l l
l l
1 t
l 4-1 l
t l
l l
l 1
1 1
-l t
l l
l l
l l
l l-1 l
l 1
l l
l
'l l
l l
l l
-l l
1 l
l 1
i I
l l
l l
1 l
l-l l
l l
l I'
i l
1 1
i t
l t
l l
l l
i l
l l
t I
l l
l l
l l
l l
l l
i l
i i
l l
l l
l l
1 t
l l
l l
l l
I l
l l
1 l
l
......l...l....__...
...l...'.
+
F FORCED REASON:
METHOD:
EVENTS REPORTED INVOLVE
.St ~ SCHEDULED A-EDUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%
B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY PONER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEEDING 24 HOURS.
E-0PERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-0THER (EXPLAIN)
El-4
l' 1
l l
L st'1 't ui,t POWCT l
EtiCLOSURE 2 TABLE OF CCNTENTS t
PLANT HATCH - UNIT 2 i
NRC DOCKET NPF-5 MONTHLY OPERATING REPORT SEPTEMBER 1932 NARRATIVE REPORT Page E2-1 OPERATING DATA REPORT Page E2-2 AVERAGE DAILY POWER LEVEL Page E2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page E2-4 1
0166C
OPERATING DATA REPORT DOCFET NO. 50-366 DATE:
OCT 2, 1997 CCMGLETED BY: J.
H.
RICHA;: 50N-TELE m0NE: ' 12) 367 '?51 2576
.0PERATING STATUS:
- 1. UNIT NAME:
E.
I. HATCH UNIT 2
- 2. REPORTING PERIOD:-
SEPTEMEER 1987
- 3. LICENSED THERMAL-POWER-(MWt):
2436 4
NAMEPLATE RATING (GROSS MWe):
850
- 5. DESIGN ELECTRICAL RATING (NET NWe):
794
- 6. HAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
794
- 7. MAXIMUM DEPENDABLE CAPACITY-(NET MWe):
761
'O.LIF CHANGES DCCUR-IN CAPACITY RATINGS
-(!TEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NO CHANGES 9.' POWER LEVEL TO WHICH RESRTICTED, IF ANY (NET MWe):
91% (710 NMWel
- 10. REASONS FOR RESTRICTION, IF ANY1 ADMINISTRATIVE - TO LIMIT OFFGAS ACTIVITY THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
720 6551 70608
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
720.00 6310 64 50333.94
- 13. REACTOR RESERVE SHUTDOWN HOURS:.
0.00 0.00 0.00-14 HOURS GENERATOR ON LINE:
720.00 6181.37 48221.17
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.00 0.00 0.00
- 16. GROSS THERMAL ENER6Y GENERATED (MWH):
1586400 13995081 104095016
- 17. GROSS ELEC. ENERGY GENERATED (MWH):
522270 4603510 34198720
- 10. NET ELEC. ENER6Y GENERATED (MWH):
499232 4400709 32550588
- 19. UNIT SERVICE FACTOR:
100.00%
94.36%
68.29%
- 20. UNIT AVAILABILITY FACTOR
100.00%
94.36%
68.29%
- 21. UNIT CAPACITY FACTOR (USING MDC NET):
91.11%
80.27%
60.35%
- 22. UNIT CAPACITY FACTOR (USING DER NET):
88.44%
85.68%
50.80%
- 23. UNIT FORCED OUTAGE RATE:
0.00%
4.23%
0.857
- 24. SHUTDOWNS SCHEDULED r/ER THE NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):
Ref ueling Outage! '.nuary 13, 1988; 45 days
- 25. IF SHUTDOWN AT EN' 0F REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A
'26. UNITS IN TEST S7,fUS (PRIOR TO COMMERCIAL OPERATION):
N/A i
E2-2 a
UNIT 2 AVERASE DAILY DOCKET NO.
50-366 POWER LEVEL DATE:
OCT 2, 1997 SEPTEMFER 1987 COMPLETED BV: J.
d.
RICHAFDSON TELEPHONE:
io!2) Je7-7731 c:Sie "AY Net MW 6BB 692 3.........
691 4
692 5.........
695 6.........
692 7.........
695 0.........
698 9.........
696 10.........
695 11.........
695 12.........
693 13.........
683 14 696 15.........
696 e
16.........
695 17.........
698 I
IB.........
694 19.........
694 20.........
696 21 699 22.........
701 27.........
704 24 700 25.........
695 26.........
694 27.........
691 2B.........
690 29.........
6BB 30.........
664 E2-3 l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NU.
50-366 DATE:
OCT 2, 1987 UNIT NAME:
E.I. HATC 2
COMPLETED EY: J,4 RICHAtDSON TELEPHONE:
il )
e7-7721 < G75 t
REPORT MONTH SEPTEMBER 1997 R
M S
.1 l
l E: El l Y I
1.
l l Tl l A l T iLICENSEE; 5 C !
i 1.Y :
! Sl H I EVENT
- T 0 COMPONENT!
CAUSE & CORRECTIVE 1
i
! P IDURATION! 0 0.l REPORT i E D l CODC ACTION TO' i
i NO.
! DATE : E.!(HOURS) : Nl D ! NUMBER 1 M E l(SUBCODE):
PREVENT RECURRENCE l
I
'..............____.....______e
~1.
i:
i l
l INo significant power i
l l
! reductions during September. !
l l
l l
l l
l l
l l
l i
i
+ l l
1 1
l l
l l
i i
l i
l l
l l.
I l
i i
l l
.I i
i l
t
-l l
1 I
l 1
1 1
I i
I l
l l
l t
l l
1 l
l l
I l
l l
l l
l l
l l
.l 1
l l
i l
l 1
i l
l 1
l l
l l
l l
1 l
1 i
l l
l 1
l l
l l
l l
l...___.l.__....'...l.__..__..
. ___.....I...............'..........._.................'
F: FORCED REASON:
METHOD:
EVENTS REPORTED INVOLVE St SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%
B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION Ih AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEEDING 24 HOURS.
E-OPERATOR TRAININS & LICENSE 5 - LDAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN) 6-OPERATIONAL ERROR (EXPLAIN)
H-0THER (EXPLAIN)
E2-4
e.
NARRATIVE REPORT DOCKET hD.
50-366 UNIT 2 DATE:
OCT 2, 1987 COMFLETED BY: J.H. RICHARDSON TELEFHONE:
(012) 3e7-7781 x2878
-September 1 0000 Maintaining 90% power.to limit offgas activity.
September 5 2320 Reducing load to 680 MWe for Wee 61y Turbine Valve / Auxiliaries Test and CRD Exercise.
September 6 0110 Increasing load to 91% thermal power.
September 13 0001 Reducing load to 620 MWe for Weekly Turbine Valve / Auxiliaries Test, CRD Exercise, and Monthly Control Valve Test.
September _ 13 0225 Returning to 91% power.
September 20 0050 Reducing load to 690 MWe for Weekly Turbine Valve / Auxiliaries Test and CRD Exercise.
n September 20 0144 Returning to 91% power.
September 24 1426' Reducing' load to 90% power for offgas activity considerations.
_ September 27 0001 Reducing load to 680 MWe for Weekly Turbine Valve / Auxiliaries Test and CRD Exercise.
' September 27- 0035 Returning to 90% power.
September 30 0715 Reducing load to 85% power for offgas activity considerations.
September 30 2400 Maintaining 85% power.
E2-1 1
_Q
.m o.uman 4,,r Q17'j (harsty,
Texpr <:r: ' y1 % 6
- M3:r1 AJ1 n
Geop Power
- n. :
5L-3367 0166C X7GJ17-H510 October 13, 1987 Director, Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Washington, 0. C.
20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 MONTHLY OPERATING REPORTS Gentlemen:
Enclosed are the Monthly Operating Reports for Plant Hatch Unit 1,
Docket Number 50-321, and for Plant Hatch Unit 2, Docket Number 50-366.
These reports are submitted in accordance with the requirements of Technical Specifications Section 6.9.1.10.
Sincerely, M M-m L. T. Gucwa LGB/lc
Enclosures:
1.
Monthly Operating Report for Hatch-1
/
2.
Monthly Operating Report for Hatch-2
[
t h
c:
(see next page) g[3 OE10 j
Cer M _ '
/< 9
k ccogia Power n Director, Office of MF3gement and Program Analysis October 13, 1987 Page Two c: Georgia Power Company Mr. J. P. O'Reilly, Sr. Vice President - Nuclear Operations Mr. J. T. Beckham, Jr., Vice President - Plant Hatch G0-NORMS U. S. Nuclear Regulatory Commission. Washinaton. D. C.
Mr. L. P. Crocker, Hatch Licensing Project Manager
.U. S. Nuclear Regula_tpry Commission. Region II Dr. J. N. Grace, Regional Administrator Mr. P. H61mes-Ray, Senior Resident Inspector - Hatch 0166C
{
l i
'w's _
___-_--___--______-____-.___N