Forwards Insp Rept 50-346/98-09 on 980512-0623 & Nov. Inspectors Identified That Design Basis Requirement of Preventing Debris from Plugging Containment Spray Nozzles Not Translated Into Design of Emergency Sump
ML20236W224
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/28/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Wood
CENTERIOR ENERGY
Shared Package
ML20236W226 List:
References
50-346-98-09, 50-346-98-9, NUDOCS 9808050161
Download: ML20236W224 (4)


See also: IR 05000346/1998009

Text

Ii

~

.

i

te4

UNITED STATES

9

(. .

8

REGION lli

h

%,

NUCLEAR REEULATONY COMMISSION

-

t~

o.

! '

{

$

801 WARRENVILLE ROAD

y

LISLE, ILLINOIS 60532-4351

l'

% ,y,,

,

July.28, 1998

L

i

!

Mr. John K. Wood :

l

' Vice President - Nuclear

L

Davis-Besse Nuclear Power Station

Centerior Service Company

l.

5501 North State Route 2

Oak Harbor OH 43449

SUBJECT:

DAVIS-BESSE INSPECTION REPORT 50-346/98009(DRP) AND

NOTICE OF VIOLATION

' Dear Mr. Wood:

On June 23,1998, the NRC completed an inspection at your Davis-Besse site. The enclosed

l

report presents the results of that inspection.

During the 6-week period covered by this inspection report, activ.ities at the Davis-Besse facility

were generally characterized by safe and conscientious operations. The restart activities

I

following the refowling outage and the subsequent power reduction to repair a main feedwater

pump were carefully controlled and well coordinated. However, on two occasions, operators

performed actions without management approval when faced with unanticipated circumstances

after operator errors occurred._ Additionally, we are concemed about one violation of NRC

requirements that was identified.- Specifically, NRC inspectors identified that the design basis

requirement of preventing debris from plugging containment spray nozzles was not translated

l

into the design of the emergency sump in that a design drawing permitted several unscreened

openings around the base of the sump screen enclosure. These openings, which existed since

plant construction, were larger than the screen size openings and could have allowed particles of

sufficient slee to bypass the emergency sump screen and plug containment spray nozzles.

J

This violation is cited in the enclosed Notice of Violation, and the circumstances surrounding the

violation are described in detailin the enclosed report. Please note that you are required to

respond to this letter and should follow the instructions specified in the enclosed Notice when

preparing your response. The NRC will use your response, in part, to determine whether further

enforcement action is necessary to ensure compliance with regulatory requirements.

(

l

l

'

chac40

\\

9808050161 990728

f

PDR

ADOCK 05000346

G

PM

j

@ t\\

-

!

<

.

l

.

J. Wood

-2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

Sincerely,

Y hl

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No.: 50-346

License No.: NPF-3

Enclosures:

1.

Notice of Violation

2.

Inspection Report No. 50-346/98009(DRP)

cc w/encis:

J. Stetz, Senior Vice

President - Nuclear

J. Lash, Plant Manager

J. Freels, Manager

Regulatory Affairr,

l

M. O'Reilly First energy

State Liaison Officer, State

i

of Ohio

l

- R. Owen, Ohio Department

of Health

'

C. Glazer, State of Ohio

Public Utilities Commission

l

l

!

- - - - - - - - - - - - - - _ - _ - - - - -

-

_____ ___ _ _ _ -

_ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _

'

.'

i

J. Wood

-2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

Sincerely,

/s/ Marc L. Dapas for

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No.: 50-346

License No.: NPF-3

Enclosures:

1.

Notice of Violation

2.

Inspection Report No. 50-346/98009(DRP)

cc w/encis:

J. Stetz, Senior Vice

President . Nuclear

J. Lash, Plant Manager

J. Freels, Manager

4

Regulatory Aff&s

!

M. O'Reilly, Rest energy

State Liaisor, Officer, State

of Ohio

l

R. Owen, Ohio Department

of Health

C. Glazer, State of Ohio

Public Utilities Commission

l

DOCUMENT NAME: G:/DAVI/DAV98009.DRP

l

..

.

.,

_ ,,

..

.c. ~

_,c.c

_,

....

b

OFFICE

Rill

b

Rlli

Rill

Kozak/mlh

Clayton 44dedI Grant [N Mf

NAME

DATE

74}98

7C'l98

7d898

OFFICIAL RECORD COPY

!

i

-

__

_

- - _ _ _ _ _ _ _ _ _

_-_---

J. Wood

-3-

Distnbution-

Project Mgr., NRR w/enci

!

C. Paperiello, Rill w/enci

(

J. Caldwell, Rill w/end

B. Clayton, Rill w/enci

SRI Davis-Besse w/ encl

DRP w/enci

TSS w/enci

DRS (2) w/enci

Rill PRR w/enct

PUBLIC IE-01 w/enci

Docket File w/enci

j

GREENS

J

IEO (E-Mail)

DOCDESK (E-Mail)

J

l

~

i

l

l

l

l

l