ML20236W130

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-271/87-10OL Administered During Wks of 870713 & 0824.Areas of Concern Include Performance of Plant Ref Simulator & Matl Sent to Region I for Development of Written Exams
ML20236W130
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 12/02/1987
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20236W133 List:
References
NUDOCS 8712070293
Download: ML20236W130 (3)


See also: IR 05000271/1987010

Text

____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . _ _ _ _ _ _

'

DEC 2 1987

)

Docket No. 50-271

Vermont Yankee Nuclear Power Corporation

ATTN:

Mr. Warren P. Murphy

Vice President and Manager of Operations

RD 5, Box 169

Ferry Road

Brattleboro, D rmont 05301

Gentlemen:

SUBJECT:

EXAMINATION REPORT NO. 50-271/87-10 (OL)

During the weeks of July 13, 1987 and August 24, 1987, the NRC administered

examinations to employees of your company who had applied for licenses to

operate the Vermont Yankee Nuclear Power Station.

At the conclusion of the examination, the written examination questions and

preliminary findings were discussed with those members of your staff identified

in the enclosed report.

j

The NRC staff has two areas of concern that warrant your immediate attention.

)

The first is the performance of your plant reference simulator during the

i

operating examinations conducted during July and August.

Specific deficiencies

are noted on Attachment 5 of this report.

The staff is requesting that the

identified performance deficiencies be corrected, prior to the next scheduled

i

operating examinations.

This will enable the examiners to develop high quality

j

evaluation scenarios and provide your license candidates with plant fidelity

l

during training.

i

i

The second area of concern is the reference material that was sent to Region I

for the development of the written examinations. As a result of the facility

comments forwarded to Region I in your July 22, 1987 letter (Attachment 3) a

detailed review of the referenc? material provided was conducted by the Chief

Examiner in order to resolve those comments. The Chief Examiner noted that

i

numerous alternate answers were not contained in the reference material provided

1

to the staff for development of the written examination.

The staff requests

that you review this reference material and correct identified discrepancies.

Attachment 4 of this report details the NRC response to your facility comments.

I

!

k

A

P

V

h

0FFICIAL RECORD COPY

IR VY 87-10 - 0001.0.0

11/17/87

a

l

_ - _ - _

G

Vermont Yankee Nuclear Power

Corporation

2

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions regarding this examination, please contact us.

Sincerely,

W Mr .t s1cne13y

ROBERTti Gall.0 '

Robert M. Gallo, Chief

Operations Branch

Division of Reactor Safety

Enclosure:

Examination Report No. 50-271/87-10 (OL) w/ Attachments 1,

2, 3, 4, and 5

cc w/ enclosure and attachments 1, 2, 3, 4 and 5:

J. P. Pelletier, Plant Superintendent

'

R. W. Spinney, Plant Training Manager

Geoff Grant, Senior Resident Inspector

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of Vermont

cc w/ enclosure without attachments 1, 2, 3, 4, and 5:

R. W. Capstick, Licensing Engineer

J. G. Weigand, President and Chief Executive Officer

D. Hunter, Vice President

C. Richardson, Vermont Public Interest Research Group, Inc.

G. Tarrant, Commissioner, Department of Public Service

bcc w/ enclosure without attachments 1, 2, 3, 4, and 5:

DRP Section Chief

Examiner

Chief, OLB DLPQE, NRR

Contract Examiner Supervisor

Region I Docket Room (w/ concurrences)

OL File

Master Exam File (with all attachments)

(SEE PREVIOUS CONCURRENCE)

MY

k:DR

R1l988

j.

  • RI:DRS gp
  • RI:DRS

RI:DRS

R

S

Lumb /mr/rw

Howe 4

LangeD

G- lo

E14 sser

fWME/W/

V

'C7 0"

1$/g/87

/87

1/ /87 @fg)

0FFICIAL RECORD COPY

IR VY 87-10 - 0001.1.0

10/15/87

1

t

i

,.

_ _____-___

a

Vermont Yankee Nuclear Power

.

Corporation

2

l

)

i

cc w/ enclosure without attachments 1, 2, 3, 4, and 5:

'

R._W. Capstick, Licensing Engineer

J. G. Weigand, President and Chief Executive Officer

D. Hunter, Vice President

C. Richardson, Vermont Public Interest Research Group, Inc.

G. Tarrant, Commissioner, Department of Public Service

bcc w/ enclosure without attachments 1, 2, 3, 4, and 5:

DRP Section Chief

Examiner

Chief, OLB DLPQE, NRR

Contract Examiner Supervisor

Region I Docket Room (w/ concurrences)

OL File

Master Exam File (with all attachments)

RI:DRS

RI:DRS

RI:DRS

RI:DRS

RI:DRP

Lumb /ms/rw

Howe d

Lange

Gallo

Elsasser

10/p/87

10/,1J /87

10/ /87

10/ /87

10/ /87

0FFICIAL RECORD COPY

IR VY 87-10 - 0002.0.0

10/23/87

- _ - - - - _ - . - -

-- -- -- - --- - - _ -- - - -- - - - - - J