Forwards Suppl 1 to Initial Startup Rept for Vogtle Unit 1, for 870801-1115.Testing of Four Radiation Monitors within Process & Effluent Radiation Monitoring Sys Will Be Reported in Later Suppl
ML20236V556
Person / Time
Site: Vogtle 
Issue date: 11/30/1987
From: Gucwa L
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20236V559 List:
References
SL-3614, NUDOCS 8712040371
Download: ML20236V556 (2)


Text

f.

Georgia Power Company 333 Piedmont Avenue Atlanta, Georgia 30308 Telephone 404 526 65?6

]

Maihng Address:

Post Office Box 4545 Atlanta. Georgia 30302 L

Georgia Power L. T. Gucwa f* mf%'rn ehduc MMm Manager Nuclear Safety and Licensing SL-3614 0610m X7GJ17-V750 l

November 30, 1987 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Hashington, D.C.

20555 PLANT V0GTLE - UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68

~

SUPPLEMENT NUMBER ONE TO

SUMMARY

REPORT OF STARTUP TEST PROGRAM Gentlemen:

In accordance with the requirements of Section 6.8.1.1 of the Vogtle Electric Generating Plant Unit 1 Technical Specifications, Georgia Power Company (GPC) hereby submits a supplement to the summary report of plant startup and power escalation testing.

This supplemental report addresses each of the remaining startup tests that were incomplete at the time that the initial startup report j

was prepared.

The report covers the period from August 1, 1987 through November 15, 1987.

Testing of four radiation monitors within the Process and Effluent Radiation Monitoring System remains to be completed.

Additionally, final results analysis of the data collected from the Dynamic Response Test and Thermal Expansion Test is ongoing.

These efforts will be reported in a later supplement to the startup report.

In our letter dated January 2,1987, GPC provided a discussion on the status of testing of systems associated with the deferred radwaste building.

The waste evaporator and boron recycle evaporator have not been completed.

Consequently, performance testing of these systems has not been completed.

Further discussion of these tests will be provided in future Plant Vogtle Unit 2 startup correspondence.

Please contact this office if you have any questions.

Sincerely, hi)k a

P h

EMB/im

I.

o.

l l

l k

Georgia Power n

)

U. S. Nuclear Regulatory Commission l

November 30, 1987 i

Page Two l

Enclosure:

1.

Summary Report Supplement l

c: Georaia Power Comoany Mr. J. P. O'Reilly Mr. P. D. Rice Mr. G. Bockhold, Jr.

Mr. J. E. Swartzwelder Mr. C. H. Hayes G0-NORMS l

Southern Comoany Services Mr. R. A. Thomas i

Mr. J. A. Bailey

{

Shaw. Pittman. Potts & Trowbridae Mr. B. W. Churchill, Attorney-at-Law l

Troutman. Sanders. Lockerman & Ashmore l

Mr. A. H. Domby, Attorney-at-Law l

U. S. Nuclear Reaulatory Commission I

Dr. J. N. Grace, Regional Administrator i

Mr. J. B. Hopkins, Licensing Project Manager, NRR (2 copies)

Mr. J. F. Rogge, Senior Resident Inspector-0perations, Vogtle 0610m 700775